Loading...
HomeMy WebLinkAboutPOUDRE SCHOOL DISTRICT, FACILITIES SERVICES BLDG. - SITE PLAN ADVISORY REVIEW - 22-01 - CORRESPONDENCE - CORRESPONDENCE-HEARING (5)AUG-15-2001 WED 01:37 PM PD&C FAX NO. 9704903524 P. 01 e I'OvLI%E T August 15, 2001 Mr. Ted Shepard, Chief Planner City of Fort Collins 28 1 North College Ave. Fort Collins, CO 80522 Via FAX: (9'70) 41 6-2020 Re: Facility Services Building Pear Ted, 11HTOTT AUG 1 5 2001 D In response to the Planning and Zoning Board's request last Friday, colored elevation plans of the proposed facility have been sent electronically to your office. Color selections have been based on the use of similar colors on the Support Service Center Campus and are intended to represent a basic color scheme_ Actual material colors will be selected at a later date and could change_ Also, as requested by the Board, a brief analysis was conducted to evaluate the use of brick or concrete block as an exterior building material. It appears that the use of these materials would be ten -times greater than the selected galvanized metal siding. This could increase the cost of this Facility by $60.000-s'10,000. The District continues to feel that the materials selected will complement the existing structures and represents a prudent use of the Taxpayer dollar. Hopefully, this additional information will alleviate any concerns the Board may have regarding this project, and we look forward to their approval at the August 161" meeting. Sincerely, POUDRE SCHOOL DISTRICT C��-q 1-1 a) Ed Holder Construction Manager Planning Deslgn s construction Planning, Design s construction 2407 Laporte Avenue Fort Golfins. Go 6052 1 FAX: 910.490.3524