I. The Project Sign is for construction purposes only and will be removed
at the completion of the Project.
j. No new pole light will be added as part of this project. Building
perimeter will be illuminated with high-pressure sodium lighting.
k. Thank you
6. Architectural Sheets:
a. Corrugated metal siding was selected for this building in an effort to
match the "industrial" look of the existing Warehouse Buildings as well
as cost. Various building materials were analyzed prior to this
selection.
b. under consideration
c. Letters A-M refer to window types.
d. The color of the metal roof has not been selected. Your comments will
be taken into consideration.
Thank you for your review comments. Both myself and our Architect will be available
to answer questions at the August 1 O�" work session.
Sincerely,
POUVRE SCHOOL DISTRICT
Ed Holder
Construction Manager
Planning, Design $ Construction
xc:
-1.v ai reurcy 0uO19M9\
Planning, Design 4 construction
240'7 LaPorte Avenue Fort Collins, CO 8052 1
FAX: 970.4gO.5524
AUG-01-2001 WED 01:52 PM PD&C FAX NO. 9704903524 P. 01
11 )
rt%tit: —F
August 1. 2001 DC:NJUT.
T:uSrntC: r
Mr. Ted Shepard
City of Fort Collins
Current Planning
2b 1 North college Avenue
Fort Collins, CO 60522
Via FAX: 9-70.41 6.2020
Re. Response to the Facillty 5ervice5 building Site Plan Review Comments
Dear Ted:
The following is the Vistrict's response to the Site Plan Advisory Review comments
dated July 26, 2001:
1 _ The District is currently looking at the effects of the requested easement. At
first look, it appears that two of our current buildings may be at or in the
requested easement. We understand the need for this easement and will work
with the City on a satisfactory resolution. We do not consider this issue to be
a requirement of Paz approval.
2. Our Civil Engineer is currently looking at this item. Drawings do not reflect any
changes.
3. This 5uilding will be accessed only through one of two secured gates. walk in
access is discouraged.
4. Thanksi However, we are not planning on having natural gas service to this
facility_
5. Site Plan C- 1!
a_ The 10' native grass area in front of the Building is intended as a buffer
from the surrounding "hardscape" and help in the reduction of heat gain
on the new facility. We respectfully decline the suggested change.
D. See above.
c. Under consideration.
d. Under consideration.
e_ Landscape 131ands were specifically not included for ease of snow
removal_ We respectfully decline the suggested change.
f. Under consideration.
g. The transformer is located on the west Side of the building adjacent to
the bike rack location.
h. The trash enclosure has been added and is currently located on the
West side of the building. it is walled on three sides with a door on the
fourth.