Loading...
HomeMy WebLinkAboutSPANJER OFFICE BUILDING - PDP - 25-01 - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSPlant Notes: CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 -All plant materials shall be in accordance with AAN specifications for number one grade. OR 303-232-1991 IDENVERO CALL 2 BUSINESS DAYS IN ADVANCE - All turf areas to be irrigated with an automatic pop-up sprinkler system. All shrubs beds to be irrigated with BEFORE YOU DIG, GRADE, OR EXCAVATE automatic drip or spray irrigation system or acceptable alternative. The irrigation system is to be adjusted to FOR THE MEMBIER UOTILITIEDERGROUND S. meet the needs of individual plant material. 3 - All trees to be balled and burlapped, root control bagged, or containerized. lt�#'uf c-�-� avcc_ i��d or eyi�raw �-�ccouwt 4 -All shrub beds to receive wood mulch to a depth of 3" on landscape filter fabric. ,� GzC, a/0 � �,T;z,�-�- 5 - A permit must be obtained from the city forester before any trees or shrubs noted on this plan are planted in the public ROW. This includes zones between the sidewalk and curb me 'ans and other city property. 6 - Minor changes in species and plant locations may be made during struction, as required by site conditions or plant availability. Overall quantity and design concept be consistent with approved plans. In the event of conflict with the quantities included in the plant list, spe s and quantities illustrated shall prevail. 7 - All landscaping proposed with installation must be installed prior to issuance of certificate of occupancy. 8 - Keep all trees 10' clear from water and sanitary sewer mains and 4' clear fror gas lines. Keep shrubs 4' clear from water and sanitary sewer lines. ;k 9 - Tree utility separations shall not be used as a means of avoiding required street trees. 10 - Developer shall ensure that the landscape plan is coordinated with all plans done by other consultants so the proposed grading, storm drainage, or other construction does not conflict, nor preclude installation and maintenance of landscape elements on this plan. 11- Prior to installation of plant materials, all areas shall be thoroughly loosened. Organic amendments such as compost, peat, or other manure shall be thoroughly incorporated at a rate of at least 3 cubic yards per 1000 sf. LO "- N F- 12- Turf grass along the street will be sodded. Open space areas will be seeded. Tn U Lo U a N 13- To the maximum extent feasible, topsoil that is removed during construction shall be conserved for later use LD o ° ~ 2 o in areas requiring revegetation and landscaping. QUO U C:<0 �v CM Cno ¢ �,�ti 1(rr4- Locate all utilities prior to planting. 0 l'�/ 1 Vt�. bl�� ?>CIiN� .C: Q' C) p C r _ � � C N � In d' r�vtie,Wt - G �j (,(� c3("L' � �i (AiL — W Q d N W V sPbb t't 0� l �ivaUlfr,�. D U a i/7�w%G� L c lUjj bC tu.c . U Z o)UN Z•Lrj U— 00 rn-itoZU- iJ-NOz�Lrn 01 a�L0U_rn U _ LO W m U LO o = o C o 0D U aD W 0 cc O Q.E= O 1 t- "UUCD W y C U� U, 20 Z C N Q m to 0) PLANT SO THAT TOP OF ROOT 00 2, U N BALL IS EVEN WITH THE O (n U N 0 -a � O U rf FINISHED GRADE � '1'�J`�� ,,,,II II J N • VIIII,,,,,,' .2 G7 � O Z C Ln :E O GUYING PLAN ,,,,Iulllllllllllll� O o I1_ Q CU Z o QZLoU_O JJNfnU_O • PLANT SO THAT TOP OF ROOT I 9 A .... 111 bI�Iull \ PLANT LIST SCIENTIFIC NAME DECIDUOUS TREES COMMON NAME SIZE QUANTITY FAP Fraxinus americans 'Autumn Purple' Autumn Purple Ash 2" cal, 60)7 1 ✓ GTS Gleditsia triaconthos inermis'Imperial' Imperial Honeylocust 2" cal. �q- FN Froxinus nigra 'Fallgold' Fallgold Ash 2" cal. ✓� //2 QM Quercus mocrocarpo Bur Oak 2" cal. I TCG Tilia cordate 'Greenspire' Greenspire Linden 2" cal. 2 ORNAMENTAL TREES CGI Crataegus crus-galli inermis Thornless Cockspur Hawthorn 1 1/2" cal. 4 ✓ PCC Pyrus calleryana 'Chanticleer' Chanticleer Pear 1 1 /2" cal. 2 EVERGREEN TREES PPG Picea pungens glauca DECIDUOUS SHRUBS BTA Berberis thunbergii 'Atropurpurea' CAA Cornus alba 'Argento-marginate' CSC Comus stolonifera 'Coloradense' CSK Comus stolonifera 'Kelseyi' RA Ribes olpinum SNS Spirea nipponica 'Snowmound' SPK Syringe patulo 'Miss Kim' VTC Viburnum trilobum 'Compactum' RAG Rhus oromatica 'Gro-Low' CEI Cercocarpos intricatus CDC Cottoneaster dammeri 'Coral Beauty EVERGREEN SHRUBS JHBC Juniperus horizontalis 'Blue Chip' JHH Juniperus horizontolis'Hughes' JHW Juniperus horizontalis'wltonii' JSA Juniperus sabina 'Arcadia' JSBR Juniperus sabina 'Broadmoor' JSB Juniperus sabina 'Buffalo' Colorado Blue Spruce 6' 2 Japanese Redleaf Barberry 5 gal. 3 d�J Variegated Dogwood 5 gal. 8 t Colorado Redtwig Dogwood 5 gal. 3 PP Kelsey Dwarf Dogwood 5 gal. 7 Alpine Currant 5 gal. 6 Snowmound Spirea 5 gal. 3 Miss Kim Dwarf Lilac 5 gal. 3 Compact American Cranberry 5 gal. 6 Gro-Low Sumac 5 gal. 6 Littleleaf Moutain Mahogany 5 gal. 2 Coral Beauty Cotoneaster 5 gal. 5 Blue Chip Juniper 5 gal. 3 Hughes Juniper 5 gal. 10 Wilton Carpet Juniper 5 gal. 7 Arcadia Juniper 5 gal. 11 Broadmoor Juniper 5 gal. 6 Buffalo Juniper 5 gal. 9 LANDSCAPE CATEGORIES: Moderate Water Use Sod Areas 4,220 SF Low to Moderate Water Use Shrub Beds & Annual Beds 2,800 SF Low Water Use Dryland Pasture Seed Mix I%"- PLANT LEGEND PROPOSED DECIDUOUS TREES PROPOSED CONIFEROUS TREES • PROPOSED ORNAMENTAL TREES \QDEa;y PROPOSEDDECIDUOUS +++ +++ PROPOSED EVERGREEN SHRUB BED PROPOSED PERENNIALS AND/C& GROUND COVE?, FESCUE SOD 7,020 SF EXISTING PARKING LOT NO TREES TO BE PLANTED IN THIS AREA DUE TO EX. UTILITY EASEMENT TREES TO BE TRIMMED TOO' GIVE 13.5' TRASH ENCLOSURE VERTICAL CLEARANCE OVER DRIVE. e°fie 2-PPG = E (� ++ +' — - 9-1 5 JSA BOLLARDS A SEE ENGINEER ENTRY: w T + + {� + � i1(#He + PLANS FOR DETAIL ppp L 3- 2 JHH 3-BTA 2-JHH 3-JS = v 1 3-�3-JHBC 3-SNS W Q I� JHH 3-CAA 6-JSB 2-TCG w 0 4-CSC 2-CS -A, 1-FAP 3-JHH 3-CAA / 10, O Utility t j u 2-JHH Easement 3-SPK LL COBBLE MULCH BE EEN\ a9°�e BUILDING AND SIDE ALK 1-QM Sa�iy9\ 6-RAG 2-CAA Access 1-PCC ear c°s� 2-CEI Drainage Easement Easement a 1-GTS 3-JHW COBBLE MULCH BED 4-CGI 4-CSK TO FILL AREA WITHIN 3-GTS r. ` Drainage Easement 4-JHW DRAINAGE EASEMENT GRAVEL MULCH TO BE (� V + i;! USED IN SWALE. ° + 7. ° y: - \ + + + + + 1-PCC Q 3-JSOA J`\e ¢c` 5-CDC 3;JS_ A J 3-JSBR 3-RA 2-JSBR 1-JSBR N Xw 1 �a5 NO TREESJO BE PLANTED DUE TO ELECTRIC LINE 3-RA t— 20' \ L RIP RAP UNDER SOD PLANTING BED NOT INTENDED TO PROVIDE x 5' Utility FULL HEADLIGHT SCREENING SINCE THE WALL AND Easement PARKING LOT ARE +/- 3 FT ABOVE ADJACENT PARKING LOT RETAINING WALL \ EXISTING PARKING LOT EXISTING BUILDING • PLANT 80 THP BALL IS 2" HIG 2 STRAND TRISTED 12 GAUGE FINISHED GRf GAL. WIRE WITH FABRIC TIES METAL POSTS DRIVEN (MIN. 18") FIRMLY INTO SUBGRADE PRIOR RUBBER HOSE TO BACKFILLING STAKE ABOVE FIRST BRANCHES GUYING WIRE OR AS NECESSARY FOR FIRM WITH 1URNBUI SUPPORT MULCH 3" CONTINUOUS BERM I I (OMIT FOR CONIFERS AND —I I �— T POS IS OS IN LAWN AREAS)-I=III :: I —I I IJ-1I I I1.L SCARIFY SIDES AND ' _ —_ i. :) CI SPECIFIED PL III —I I I� WATER & TAN BOTTOM OF PLANTING _ REMOVE AIR HOLE -I I III —III= 11 I= SPECIFIED PLANTING MIX 7-1 1 I I I LAY BACK BURLAP SCARIFY SIDE WATER & TAMP TO . -III �I_I 1 I_ FROM ROOT BALL; BOTTOM OF I REMOVE AIR POCKETS •LL REMOVE ALL WIRE HOLE 2 X BALL DIA. MESH AND CONTAINERS TREE PLANTING - VERTICAL STAKES NOT TO SCALE NOTE: • STAKE TO FIRST BRANCHES AS NECESSARY FOR FIRM SUPPORT • WIRE SHALL NOT TOUCH OR RUB ADJACENT TRUNKS OR BRANCHES METAL T POSTS DRIVEN FIRMLY A MINIMUM OF 18" INTO THE SUBGRADE PRIOR TO BACKFILLING 2 STRAND 12 GAUGE GALV. WIRE WITH FABRIC TIES USED ON MAIN STRUCTURAL 3" ASPEN BARK MULCH BRANCHES FORM SAUCER WRH 3" CONTINUOUS RIM :III -III -I I '; � III=III-III- SPECIFIED PLANTING MIX WATER & TAMP TO_ - REMOVE AIR POCKETS I I -III J 11,=I�=III— =1 — I� I � I -III -III =1 I I=III=1 I CARIFY SIDES AND 2 X BALL DIA. BOTTOM OF PLANTING HOLE MULTI -TRUNK TREE STAKING NOT TO SCALE 0 NOT TO SCALE FORM SAUCER WITH 3" CONTINUOUS RIM SPECIFIED PLANTING MIX. WATER & TAMP TO REMOVE AIR POCKETS CONIFER TREE PLANTING - GUY WIRES n \ V uo o o y V •y/ N� ` l.J J w. `� u 0 3" MULCH SCARIFY SIDES AND BOTTOM OF PLANTING 2 X BALL DLA. HOLE �� SHRUB PLANTING NOT TO SCALE 1 � � N L � N C ca O 0 U O c pm W W C ate_ 0 m U c � o E: N LL ca d V y m 0 0 t U w N Lo U N cr, c C)cc a J W c6 0, 0— CL (13 cn J PAP I� W U e T C CD O � C � O 4? E Z (a O L L U� O"O U U of E _ Z ~ � :3(n O) U o N z L j 0° U > o a�U�= Qi �o0� V L ` ") N U1 L w W 0 H o zcr U � �— N N CD`O O O O � CO ti O N � CD o � O H- U O O O O m T m Y O o o C 3 " m = m _ 0 U 0 U -) Sheet lf 1 0 of 1 VICINITY MAP C 0 T C aa. c d Q d POL d 0 gas U CCEll LMN ZLI 07/20/01 ##25-01 Spanjer Office Bldg Project Development Plan Type I LUC im=600• Spanjer Office Building, Project Development Plan, #25-01 June 3, 2001 Administrative Hearing Page 6 commercial/office uses in the South College Avenue commercial corridor. The LUC does not require that a neighborhood meeting be held for a Type I development proposal and a neighborhood meeting was not held to discuss this proposal. FINDINGS OF FACT/CONCLUSIONS After reviewing the Spanjer Office Building, Project Development Plan, staff makes the following findings of fact and conclusions: 1. The proposed land use is permitted in the C — Commercial zone district. 2. The Project Development Plan complies with all applicable General Development Standards contained in Article 3 of the Land Use Code. 3. The Project Development Plan complies with all applicable district standards of Section 4.17 of the Land Use Code, C zone district. RECOMMENDATION: Staff recommends approval of the Spanjer Office Building, Project Development Plan - #25-01. R Spanjer Office Building, Project Development Plan, #25-01 June 3, 2001 Administrative Hearing Page 5 2. Section 3.3.5, Engineering Design Standards The proposal complies with the design standards, requirements, and specifications for the services as set forth in this section. C. Division 3.5, Building Standards 1. Section 3.5.1, Building and Project Compatibility a. The proposal complies with Section 3.5.1(D) in that the primary fagade and entry faces Cameron Drive, to the west. There is a connecting walkway, with an enhanced pedestrian connection across a 20' wide driveway, to the sidewalk along Cameron Drive. b. The proposal complies with Sections 3.5.1(F) and (G). The building will be a 2-story structure with a sloped roof of various heights (sloping in all four directions). The building will be 22' to 31' in height (to the peak of the sloped roof), depending on the elevation, and will be constructed of a creamy off-white stucco and a brown brick. Building materials will be similar to those on the existing buildings in Cameron Park. 2. Section 3.5.3, Mixed Use, Institutional and Commercial Buildings a. The proposal complies with Section 3.5.3(B)(1) in that the south entry faces and opens directly onto a connecting walkway with the pedestrian frontage along the frontage road along South College Avenue. b. The proposal complies with Section 3.5.3(13)(2)(b) in that the east face of the building is set back 15' from the right-of-way line for the frontage road along South College Avenue, being smaller than a full arterial street. This is right at the maximum 15' setback requirement. 4. Neighborhood Information Meeting The Spanjer Office Building, PDP contains a proposed land use that is permitted as a Type I use in the C — Commercial Zoning District, subject to an administrative review. The proposed use is an office building and constitutes a relatively small infill redevelopment in the midst of existing 41 Spanjer Office Building, Project Development Plan, #25-01 June 3, 2001 Administrative Hearing Page 4 2. Section 3.2.2, Access, Circulation and Parking a. The proposal complies with Section 3.2.2(C)(4)(a) in that it provides secure and conveniently located bicycle parking near the front entry to the building on the north side, with the amount of bicycle parking exceeding the minimum requirement of 5% of the 10 automobile parking spaces on -site. Only one bicycle parking space is required. b. The proposal complies with Section 3.2.2(C)(5) in that it provides direct, safe, and continuous walkways and bicycle connections to major pedestrian and bicycle destinations in the surrounding area via an enhanced crosswalk between the front entry of the building and the sidewalk along Cameron Drive, and a direct pedestrian connection from the south entry of the building to the new attached sidewalk along the frontage road. c. The proposal complies with Section 3.2.2(D) in that it provides for safe, convenient, and efficient bicycle, pedestrian, and vehicular movement to and through the site. Vehicular access and egress will occur via a primary driveway curb cut on Cameron Drive and a secondary driveway curb cut into the northeast corner of the site from the existing frontage road along South College Avenue. d. The proposal complies with Section 3.2.2(K)(2)(a) in that the project will provide 10 parking spaces (regular and handicapped) on -site, which is the number allowed for general office uses (maximum of 3/1,000 square feet of gross leasable floor area). B. Division 3.3, Engineering Standards 1. Section 3.3.1, Plat Standards The proposal complies with the general plat requirements as set forth in this section. The Replat of Lot 7, Cameron Park, First Filing subdivision plat contains one lot 0.45 acre in size, with 113.32' of frontage on Cameron Drive. 4 Spanjer Office Building, Project Development Plan, #25-01 June 3, 2001 Administrative Hearing Page 3 2. Division 4.17 of the Land Use Code, Commercial Zone District The proposed office use is permitted in the C zone district subject to an administrative review. The PDP meets the applicable Land Use and Development Standards in the C zone district. 3. Article 3 of the Land Use Code — General Development Standards The Project Development Plan complies with all applicable General Development Standards as follows: A. Division 3.2, Site Planning and Design Standards 1. Section 3.2.1, Landscaping and Tree Protection a. The proposal complies with Section 3.2.1(D)(1)(c) in that it provides "full tree stocking" within 50' of the building, according to the standards as set forth in this section. b. The proposal complies with Section 3.2.1(D)(2)(a) and (b) in that canopy shade (street) trees are provided at a 27' spacing along Cameron Drive 3' to 4' behind the existing & proposed attached sidewalk. c. The proposal complies with Section 3.2.1(D)(3) in that no one species of tree on the development plan exceeds 50% of the total of 18 new trees on -site. d. The proposal complies with Section 3.2.1(E)(4)(b) in that the on - site parking areas will be screened from the properties to the south and north with shrub plantings that will block at least 75% of the vehicle headlights and extend for more than 70% of the property line along the parking areas. e. The proposal complies with Section 3.2.1(E)(5) in that it provides interior landscaping in excess of 6% in the parking and vehicle use areas, exceeding the minimum requirement. 3 Spanjer Office Building, Project Development Plan, #25-01 June 3, 2001 Administrative Hearing Page 2 Offices are permitted in the C — Commercial Zoning District, subject to administrative (Type 1) review. The C District is: Intended to be a setting for development, redevelopment and infill of a wide range of community and regional retail uses, offices and personal and business services. Secondarily, it can accommodate a wide range of other uses including creative forms of housing. While some Commercial District areas may continue to meet the need for auto -related and other auto -oriented uses, it is the City's intent that the Commercial District emphasize safe and convenient personal mobility in many forms, with planning and design that accommodates pedestrians. This proposal complies with the purpose of the C District as it is a new office building in the commercial corridor along South College Avenue. This proposed general office land use that will provide pedestrian access to and from the site from the sidewalk system along Cameron Drive and the existing frontage road along South College Avenue. COMMENTS: 1. Background The surrounding zoning and land uses are as follows: N: C; existing offices (Cameron Park) S: C; existing church (Cornerstone Family) E: C; existing commercial, residential (Fossil Creek Design Center, Fossil Creek Meadows) W: C; existing offices (Cameron Park) The property was platted in Larimer County as Lot 7 of the Cameron Park Subdivision and approved by the Board of County Commissioners in June, 1974. The property was annexed into the City of Fort Collins in April, 1992, as part of the Cameron Park Annexation. E � ITEM NO. MEETING DATE �'! D2- r°wr��� STAFF 6I;?AZe, 2I+ Citv of Fort Collins HEARING OFFICER STAFF REPORT PROJECT: Spanjer Office Building, Project Development Plan - #25-01 APPLICANT: Land Images, Inc. c/o Michael Chalona 215 West Magnolia Street Fort Collins, CO. 80521 OWNER: Nicholane Properties, LLC 509 Spring Canyon Court Fort Collins, CO. 80525 PROJECT DESCRIPTION: This is a request for 3,624 square foot office building, 2 stories in height, on a 0.45 acre lot located on the west side of South College Avenue, north of and adjacent to the Cornerstone Family Church, just north of Cameron Drive. There is a frontage road between the property and South College Avenue. The property is in the C — Commercial Zoning District. RECOMMENDATION: Approval EXECUTIVE SUMMARY: This PDP complies with the applicable requirements of the Land Use Code L( UC), more specifically: the process located in Division 2.2 - Common Development Review Procedures for Development Applications of ARTICLE 2 - ADMINISTRATION; standards located in Division 3.2 - Site Planning and Design Standards, 3.3 — Engineering Standards, and Division 3.6 - Building Standards of ARTICLE 3 - GENERAL DEVELOPMENT STANDARDS; and standards located in Division 4.17 Commercial District (C) of ARTICLE 4 — DISTRICTS. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750 PLANNING DEPARTMENT