HomeMy WebLinkAboutSPANJER OFFICE BUILDING - PDP - 25-01 - CORRESPONDENCE - REVISIONS (5)The plat will be submitted correctly this time.
Because there now is a subdivision plat with the development request the applicant
must be aware of Larimer County's requirement for a "Certificate of Taxes Due" at
time of recording and filing the plat (see attached information).
The Certificate will be pro%Aaed.
This completes staff comments at this time. Additional comments may be
forthcoming. This development request is subject to the 90-day revision re -submittal
(from the date of this comment letter) as set forth in Section 2.2.11(A) of the Land
Use Code. Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970) 221-6341.
Yours Truly,
Steve Olt,
City Planner
Page I 1
Planning:
A driveway connection between the parking lot/drive on this site and the parking lot
on the property to the north may be desirable. This would create only one access
point onto the frontage road and enable this developer to eliminate the 20' wide fire
access lane (and a significant amount of pavement).
The developer did not find it desirable.
The 8' wide handicapped parking space may not be sufficient, even with the 5' wide
pedestrian walk and ramp. The handicapped ramp may impede access to and from
a vehicle for a handicapped person trying to enter or exit the vehicle. Section
3.2.2(K)(5)(a) of the Land Use Code must be met.
The space is now 1 3' wide, unobstructed.
There is a lot of information on the Site Plan and the lack of differentiation in line
weights makes the plan very difficult to follow and read.
To be addressed by others
The Colorado Department of Transportation (CDOT) has indicated that a center
median is needed in Cameron Drive at the intersection with South College Avenue.
This is to help control traffic on the frontage road. CDOT has said that the next
development in this business park will be responsible for the design and construction
of the median, which could be the Spanjer Office project. There is the possibility that
a repay agreement could be negotiated with the proposed Redtail project, to the
west and north.
The Kedtail development will design and construct the median, the development
agreement contains the details of reimbursement.
Please see the red -lined Landscape Plan for comments regarding lot line and
parking lot perimeter landscaping.
To be addressed by others.
Comments numbered 91 and above in this comment letter (from all departments and
outside reviewing agencies) are Round 2 review comments.
There was a subdivision plat submitted with this second round of review. However,
City staff was not aware that a plat had been included in the utility plan sets until the
reviewing engineer noticed it. The required number of "folded" plats must be
submitted separate from the utility plans so that they can be routed to the
appropriate City departments and outside reviewing agencies.
Page 10
Stormwater:
There are overlapping drainage and utility easements being shown that could
present a problem.
Most of the previous Stormwater comments have been adequately addressed.
The easements no longer overlap.
Water/Wastewater:
1. This site is in an area that is serviced by the Fort Collins -Loveland Water and
South Fort Collins Sanitation Districts. You should contact them directly
regarding their requirements.
The comments from the Fort Collins -Loveland Water and South Fort Collins
Sanitation Districts have been addressed and appropriate changes have been
made.
Engineering:
There now is a replat of the property that was not part of the original submittal.
Copies of the plat were included in utility plan sets without making City staff aware
that a plat was being submitted.
The plat will be submitted correctly this time, the required number of copies will
be folded and submitted separately from the Utility drawings, a copy of the Plat
will be included in the Utility drawings for reference.
The utility plans do not show building envelopes and some portions of the proposed
buildings do encroach into drainage easements.
Building envelopes are shown, easements no longer overlap.
Handicapped parking spaces need to be 13' wide, unobstructed.
The ramp has been moved , the space is unobstructed.
There are still discrepancies between the Site Plan and the utility plans.
Plans have been coordinated.
Additional Light & Power easements are needed on -site.
Easements have been provided
Page 9
1. The WQ ponds A & B should have gravel outlet filters installed so the ponds can
act as sediment traps during construction.
Outlet Filters for the ponds have been added.
Department: Zoning Issue Contact: Jenny Nuckols
83
Label building envelope, footprint, dimensions and distance to property lines.
Items are labeled, please reference site plan for more detailed buildincg-
related dimensions.
12-26-01... Please see the redlines on the site plan. There are 2 building envelopes
noted for each building. The heavier dashed lines appear to be the correct
envelopes. Please review and clarify.
To be addressed by others.
87
Is there going to be a sidewalk along the frontage rd
Yes
12-26-01... On the site plan, the sidewalk along the frontage road is being referred
as S wide and 6' wide. Please clarify. I also don't see the 6' walk being called out
on the landscape plan.
There is a proposed six-foot wide sidewalk along the Frontage Road. One
foot of that width is located in the Right -of -Way, the remaining five feet lie
within the five-foot Pedestrian Access easement.
91
Plant Note #7. This site is too small for phasing. If the buildings are going to be
constructed at the same time, the landscaping should be all done at the same time.
If construction will be in two phases, please show phase lines on both site and
landscape plans.
To be addressed by others.
The following comments were expressed at Staff Review on 1/16/0Z
Page 8
Department: Police Issue Contact: Joseph Gerdom
90
The lighting plan needs to be reworked to provide greater security and less light
spillage. Every lot has inadequate lighting with several also having excess.
To be addressed by others.
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
98
Please provide documentation for the claim mentioned in the report that the City has
provided a 60' drainage easement through the natural area. The reference drawings
only show a Proposed easement. Please check that the easement includes drainage
from this site. What are the flow restrictions through this easement?
Documentation was been provided to Basil Hampden at Stormwater January 22,
2001 , easement agreement RCPTN# 99043010.
99
Please revise the grading along the north central part of the site to reflect proposed
basin delineation. See sheet 5.
Grading has been revised.
100
Please provide complete calculations for the northern swale and both spillways.
The spillway should pass the 100-year flow and the sidewalk chases need to only
pass the 10-year flow. Calculations are not necessary for the sidewalk chases due
to the small flows.
Calculations are included in the Drainage Report.
101
Please check / provide riprap and calculations where needed (WQ pond B?).
Rprap is not rectuired according to the calculations, but a G'xG' patch of Type L
riprap is proposed at the 2' curb opening at WQ Pond B to ensure that erosion
does not occur.
Topic: Erosion/Sediment Control
102
Page 7
97
Locate electric line along entire north edge of property and provide easement for
line.
A Utility Easement has been provided
Department: Natural Resources Issue Contact: Doug Moore
Topic: Natural Resources
74
Trash Enclosure -
Please include a detail of the trash enclosure with the next submittal.
***REPEATED COMMENT 111612002 ***
Please reference site plan to see trash enclosure detail
Department: PFA
Issue Contact: Michael Chavez
58
Address Numerals - Address numerals shall be visible from the street fronting the
property, and posted with a minimum of 6-inch numerals on a contrasting
background. 97 UFC 901.4.4
To be addressed by others.
59
Water Supply - No commercial building can be greater then 300 feet from a fire
hydrant. Fire hydrants are required with a maximum spacing of 600 feet along an
approved roadway. Each hydrant must be capable of delivering 1500 gallons of
water per minute at a residual pressure of 20 psi. 97 UFC 901.2.2.2
There are two (2) fire hydrants located well within 300 feet of either building.
One is located on the southwest corner of Coronado Court and the Frontage
Road (Lot 8), the other is located across Cameron Drive on the vacant lot
(Lot 5). These are shown on the utility plans.
92
Water Supply requirement still needs to be addressed. The location of the fire
hydrant needs to be on the site plan.
The hydrants are shown on all Utility Plans.
Page 6
110
Design and construct a median in Cameron Drive at the College Avenue
intersection. The median should run from College to the first entrance of Lot 6 which
is just south of your project. Address the sight distance issues in the median
separating the frontage road and College Avenue, to the north of Cameron. See
redlines. This is required by CDOT to minimize the traffic conflict along the frontage
road. CDOT will require an Access Permit - we will start the application for you. The
fee is paid at the time the actual permit is filed. The Redtail development will be
required to participate in the design and construction of this median as well -
whichever project goes first will initiate the design and construction and then be
reimbursed by the other development. Both projects will address the costs
associated with these requirements and who reimburses who in the Development
Agreement.
The Redtail development will design and construct the median, the development
agreement contains the details of reimbursement.
113
Cover Sheet: Remove the word "Final" from the title.
Removed.
Department: Light & Power Issue Contact: Alan Rutz
93
Contact Light & Power with electric load requirements.
To be addressed by others
94
Maintain 4' clearance between gas and electric line.
Clearance is maintained
95
Transformer pad is 4' x 4'.
Corrected.
96
Provide easement at southeast comer of property starting at the frontage road and
extending west to include the electric vault (transformer).
A Utility Easement has been provided
Page 5
39
Repeat: Provide detail, dimensions, label for the trench drain next to the trash
enclosure.
Has this been removed or accidentally left out from the first submittal?
The trench drain has been removed from the plans.
40
Repeat: Add detail for the trash enclosure retaining wall. Make sure footer is inside
the property line. Will you need a temporary construction easement to dig on the
neighboring property?
Please reference site plan to see trash enclosure detail.
49
Sheet 4fT Show detail for the opening to drain ramp.
The sump pit is to convey flows from the ramp and stairs to the WQCV to the
east WQCV pond. The drain opening and other details will be designed by
others, using our flow data.
66
Cover Sheet: Provide an area of 4"x6" on each sheet for the Local Entity to place a
stamp of approval, all sheets.
This was provided as requested but needs to be removed again. This is a mistake
that will be corrected in the next version of the standards. Thanks and sorry!
Removed as requested.
108
Please work on the line weights a little bit. Existing conditions are ghosted or
dashed and proposed conditions are "normal". The plans have these line weights
backwards in some cases. See redlines.
Line weights have been corrected.
109
Eliminate the Existing Conditions sheet. It's really not necessary.
The existing conditions sheet aids in the construction process, and will remain
in the set.
Page 4
55
Repeat: Show all ROW, easements, property lines & setback requirements.
Remove all the unnecessary dimensioning - looks more like an architectural drawing
than a site plan.
56
Repeat: Coordinate this sheet with the Utility plans to reflect the changes requested.
111
Repeat: Does not match the Utility Plans. Very hard to read! Too much
dimensioning and only 2 line weights make it impossible to clearly define what's
going on. Remove all the unnecessary dimensioning, add a legend, and coordinate
with the Utility Sheet. I can provide good examples of what a site plan should look
like if you need to see one. See redlines.
112
Building envelope shown in the drainage easement. Not allowed - please correct
and coordinate with the Plat, Landscape and Utility Plans.
Topic: Utility Plans
7
Repeat: Update the General Construction Notes. See Attached.
The notes have been updated.
8
Repeat: Cover Sheet: Need the following statement annotated on the Cover Sheet:
"I hereby affirm...". See LCUASS, section 3.3.1.F.
The note 15 annotated.
16
Repeat: Provide all existing and proposed ROW, property lines and easements with
dimensions. See checklist E-4. Label on all sheets.
All are shown with dimensions.
30
Repeat: Show how the proposed sidewalk ties in to the existing sidewalk.
Reference page 3- Overall Utility Plan.
Page 3
104
Show ALL easements, building envelopes, property lines, ROW, etc, all sheets
(Landscape/Utility/Site/Plat). See Checklist E-4.
All easements, envelopes, property lines and ROWS are shown in the Utility
Plans.
106
Need to submit a variance request for the combined Ped Access/Utility easement.
A Variance Rectuest has been submitted.
107
The building envelope is overlapping the utility/drainage easements on the Site plan
and is not allowed by code. Please correct and coordinate between the
Plat/Landscape/Utility/Site plan sheets.
The conflict has been cleared, plans are coordinated.
Topic: Landscape Plan
To be addressed by others
57
Landscape Plan: Coordinate this sheet with the Utility plans to reflect the changes
requested.
Topic: Plat
To be addressed by others
103
Incorrectly submitted. Must be resubmitted for review. Needs to show the building
envelopes, the language needs to be updated (see attached), Notice of Other Doc's
missing, Attorney's Cert missing, benchmark missing, and all additional easements
requested by Light and Power are missing. More comments to follow when correctly
submitted.
105
Title Block needs to go along the right hand margin.
Topic: Site Plan
To be addressed by others
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
Land Images
c/o Trista Sigler
215 W. Magnolia, Suite 202
Fort Collins, CO. 80521
Date: 1 /24/2002
Staff has reviewed your resubmittal documentation, with revisions, for the SPANJER
OFFICE BUILDING, #25-01, and we offer the following comments:
ISSUES_
Department: Current Planning
Issue Contact: Steve Olt
76
Len Hilderbrand of Excel Energy (Public Service) indicated that no trees may be
planted within 4' of gas lines.
To be addressed by others
89
Some of Current Planning's comments are on red -lined plans that are being
forwarded to the applicant.
Appropriate revisions were made
Comments from all city departments and outside reviewing agencies numbered 91
and above in this comment letter are Round 2 review comments.
Department: Engineering
Topic: General
Issue Contact: Susan Joy
1
Repeat. Provide TIS. Needs to include the Redtail development to the north and
west. This project is currently under review and will be submitting a TIS as well.
The ADTs of your traffic study will also determine the parking space setback from
Cameron Drive.
As per Matt Delich, the impact of this site is so minimal that a TIS is not
required.
Page 1
NORTHERN
ENGINEERING
NESERVICES, INC.
March 26, 2002
City of Fort Collins
281 N College
Fort Collins, Colorado 80521
RE: Spanjer Office Building
Fort Collins, Colorado
Project Number: 01-042.02
Dear Staff:
We have reviewed the comments generated by the previous submittal for Spanjer Office
Building, these responses reflect revisions made to the plans to resolve said issues.
Please do not hesitate to call with any questions you may have regarding these responses.
Sincerely,
NORTHERN ENGINEERING SERVICES, INC.
Kimberly sh
Project Engineer
420 SOUTH HOWES, SUITE 202 1 FORT COLLINS, COLORADO 80521 / 970.221.4158 / FAX 970.221.4159