HomeMy WebLinkAboutSPANJER OFFICE BUILDING - PDP - 25-01 - CORRESPONDENCE -00
Project: —Aep, 0som II-i6 Date: OI
Planner:Traffic Operations: Engineer:
Items Requested
Redlined Items Being Returned
C
o
a,
2
�
Other ItemsRe uired
�
c
ym
Z
M
p
Other Items being
Returned
Engineering
%.WS
1
1
Stormwater
Water/Wastewater
Traffic Operations
Trans ortation Planning
Transfort
Natural Resources
Park Planning
✓ ' �CMJ44kA JA nlG
1
Gew►w+G �i1'�5
TOTALS ` e.*�Jz
(p
Other:
Note: All redlined items should be returned with the resubmittal/revisions. I
0
%. REVISION ROUTING SHLET
• .
•
•
•
WorknMM
��•
�----_---
I;ioimpliLluto•
�--�5-------
ADVANCE PLANNING
miallas
• • . •
mm�mmmm���mm
WATERCONSERVATION
•
m��!�mmmmm
mm
mm�mmmmmm
mm
SERVICE
MFEMMM
mmmm��==
SCHOOLS:PUBLIC
P.. •E / THOMPSON immmmmmmmmmmm
AT = T DIGITAL CABLEVr
4�����mm
..
DITCH COMPANY
mmmmmmmm
RAILROAD: UP or -
mmmmm
Em
IMM
mmmmmmmmmmmm
'
=�mMmmmmmmmm
mmmmmmmmm��=
mmmmmmmm��==
:. -
mm
mmmm�mm
81 Issue Contact: Jenny Nuckols
Which parking space is for handicap parking . It isn't clear
82 Issue Contact: Jenny Nuckols
Please provide a bike rack near the main entrance to the building
83 Issue Contact: Jenny Nuckols
Label building envelope, footprint, dimensions and distance to property lines
84 Issue Contact: Jenny Nuckols
Note on the site plan how many parking spaces, he parking spaces and bike
spaces you are providing.
m
Note colors of building on elevations
Issue Contact: Jenny Nuckols
86 Issue Contact: Jenny Nuckols
Could some street trees be placed a little closer to the building along the
frontage rd yet outside the easement
87 Issue Contact: Jenny Nuckols
Is there going to be a sidewalk along the frontage rd
Be sure and return all of your redlined plans when you re -submit.
If you have questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
City Planner
10 of 10
.•
70
71
Zoning
:e
Issue Contact: Basil Hamdan
Off -site Flows
Please document how much off -site flows from the basins to the north of
this site will be intercepted by the proposed berming on the north side of this
site.
Please discuss how the flows on the west side will be routed through the site
and the impact of the pass through flows on the proposed drainage facilities.
It seems that the report anticipates that all the flows to the north will be
conveyed
to the frontage road, however, it seems that some flows on the west side will
actually
go through this site.
Issue Contact: Basil Hamdan
On -site drainage facilities
Please provide detail for the proposed trench drain on the west entrance
Please provide a detail for the sump drain proposed in the low area of the West
building. Please identify where the sump drain will be tied to.
Please provide details for the water quality outlet structures of the ponds.
Please provide actual construction quality details with proposed elevations,
and spillways for the ponds.
It seems that part of west extended water quality pond is proposed to be in a
parking area. Please revise to ensure that the pond is all contained in a
landscaped area.
Issue Contact: Basil Hamdan
Landscape
Please identify the water quality ponds on the landscape plan.
Please provide a low water channel within the proposed water quality
ponds. Within these low flow channel please specify wetland type vegetation
that will not be mowed.
Issue Contact: Jenny Nuckols
Remove all topo lines from site and landscape plans
9of10
59 Issue Contact: Michael Chavez
Water Supply - No commercial building can be greater then 300 feet from a fire
hydrant. Fire hydrants are required with a maximum spacing of 600 feet along
an approved roadway. Each hydrant must be capable of delivering 1500 gallons
of water per minute at a residual pressure of 20 psi. 97 UFC 901.2.2.2
60 Issue Contact: Michael Chavez
Required Access - A fire lane is required. The fire lane shall be visible by
painting and signage, and maintained unobstructed. 97 UFC 901.3; 901.4.2;
902.2.1
Stormwater Utility
67 Issue Contact: Basil Harridan
Erosion/Sediment Control Comments:
Cameron Park, Lot 7
July 31, 2001
Comments provided by Bob Zakely
The report states that construction will start "sometime around March, 1999." Did it? If so,
did they do it right? And why, then, are we reviewing plans now? Or does the report and
plan need to be changed to bring us into the current century? Please help me on this.
The report and calculations call for revegetation, mulching, and a vehicle control pad. None
of these are shown on the plan. Please do so, and add notes to reflect when and where
these are to be utilized.
Why is there no outlet protection on the pond at the frontage road?
Please provide a surety calculation.
Issue Contact: Basil Hamdan
Easements:
Since the site is already platted, the areas covered by the proposed water
quality ponds
should be designated as a drainage easement by separate document.
Please provide documentation for the claim mentioned in the report that
the City has provided a 60' drainage easement through the natural area for this
site.
8of10
56 Issue Contact: Susan Joy
Site Plan: Coordinate this sheet with the Utility plans to reflect the changes
requested.
57 Issue Contact: Susan Joy
Landscape Plan: Coordinate this sheet with the Utility plans to reflect the
changes requested.
61 Issue Contact: Susan Joy
Cover Sheet: The project title should match the plat, landscape plans, etc.
Should read "Spanjer Office Building".
66 Issue Contact: Susan Joy
Cover Sheet: Provide an area of 4"xT on each sheet for the Local Entity to
place a stamp of approval, all sheets.
72 Issue Contact Susan Joy
Site Plan: This sheet needs to match the utility plans. Sidewalk shown should
be detached. Show how it ties into existing.
Light & Power
62 Issue Contact: Alan Rutz
Locate oval electric vault at southwest corner of property and verify that it does
not conflict with the new driveway.
63 Issue Contact: Alan Rutz
Move transformer closer to the parking lot curb. Maintain a 3' clearance
between the sides and back of the transformer and new trees.
Natural Resources
74 Issue Contact: Doug Moore
Trash Enclosure -
Please include a detail of the trash enclosure with the next submittal.
PFA
58 Issue Contact: Michael Chavez
Address Numerals - Address numerals shall be visible from the street fronting
the property,and posted with a minimum of 6-inch numerals on a contrasting
background. 97 UFC 901.4.4
7of10
43 Issue Contact: Susan Joy
Sheet 3/7: Show, dimension and label all access ramps. Provide detail per
LCUASS.
44 Issue Contact: Susan Joy
Sheet 3/7: Show all existing driveways for the neighboring properties. Do you
have the proper separation distances required by code?
47 Issue Contact Susan Joy
Sheet 4/7: Where is the "Swale Section" noted in the Legend?
48 Issue Contact: Susan Joy
Sheet 4/7: Carry over all corrections from previous pages.
49 Issue Contact: Susan Joy
Sheet 4/7: Show detail for the opening to drain ramp.
50 Issue Contact: Susan Joy
Sheet 6/7: Update all details to current LCUASS. See Appendix A.
51
Sheet 6/7: Add sidewalk detail per LCUASS.
Issue Contact. Susan Joy
52 Issue Contact. Susan Joy
Sheet 6/7: Cover Sheet has page 6 labeled as "Drainage Details". Please
correct one or the other.
53 Issue Contact: Susan Joy
Sheet 6/7: Where is the Cold Joint Detail being used?
54 Issue Contact: Susan Joy
Sheet 6/7: Fill out project info on the bottom - designer, checked by, print date,
etc. and correct overlapping detail.
55 Issue Contact: Susan Joy
Site Plan: Show all ROW, easements, property lines & setbacks.
6of10
32 Issue Contact. Susan Joy
Sheet 3/7: Proposed 2' concrete sidewalk culvert does not meet LCUASS, see
page 7-19, section 7.7.4. See detail D-10 of Storm Drainage Design Criteria
Manual. Show continuation of sidewalk and how it ties into the existing
sidewalk.
33 Issue Contact: Susan Joy
Sheet 3/7: Reference detail for both asphalt patches and add note:
Limits of street cut are approximate. Final limits are to be determined in the
field by the City Engineering Inspector. All repairs to be in accordance with City
street repair standards.
34 Issue Contact Susan Joy
Sheet 3/7: Label & dimension all crosspans and reference appropriate detail.
35 Issue Contact: Susan Joy
Sheet 3/7: Label, dimension various objects - see redlines. Should reference
detail sheet where appropriate.
36 Issue Contact: Susan Joy
Sheet 3/7: Dimension G and E lines - where are these located?
37 Issue Contact: Susan Joy
Sheet 3/7: Show details, dimensions for the retaining wall & access ramps on
the south and west sides of the building.
38 Issue Contact. Susan Joy
Sheet 3/7: Show, label, dimension the structure(?) next to the trash enclosure.
39 Issue Contact: Susan Joy
Sheet 3/7: Provide detail, dimensions, label for the trench drain next to the
trash enclosure.
40 Issue Contact: Susan Joy
Sheet 3/7: Add detail for the trash enclosure retaining wall. Make sure footer is
inside the property line. Will you need a temporary construction easement to
dig on the neighboring property?
42 Issue Contact: Susan Joy
Sheet 3/7: Show centerline of all streets, drives, etc., on all sheets.
5of10
20 Issue Contact: Susan Joy
Overall Utility Plans: Show existing features adjacent to this development in a
ghosted or alternate line weight. There are a bunch of utilities on the corner off
of Cameron with an unusual sidewalk configuration wrapping around them. Will
the utilities stay there? Could work if you detach the sidewalk.
21 Issue Contact: Susan Joy
Overall Utility Plans: Show general location of signs.
24 Issue Contact: Susan Joy
Overall Utility Plans: Show all existing features for a minimum of 150' beyond
the project limits.
25 Issue Contact: Susan Joy
Overall Utility Plans: Provide access ramps and crosswalks. Include and
reference current detail.
26 Issue Contact: Susan Joy
Overall Utility Plans: Not enough spot elevations called out. See detail 7-32B.
27 Issue Contact: Susan Joy
Overall Utility Plans: Provide station, critical elevation, and dimension of all
existing and proposed utility and/or drainage structures. Include spot elevations
per LCUASS.
30
31
Issue Contact: Susan Joy
Sheet 2/7: 6' Utility easement unacceptable, code requires a minimum of 9'.
Will need to dedicate additional utility easement.
Issue Contact: Susan Joy
Sheet 3/7: Show how the proposed sidewalk ties in to the existing sidewalk.
(Show all existing features for a minimum of 150' beyond project limits). The
porposed sidewalk does not match what's shown on the site and landscape
plans. These sheets need to be coordinated.
Issue Contact: Susan Joy
Sheet 3/7: You can not use the high volume driveway entrances with radius
curb cuts as shown. Both driveway approaches do not meet current LCUASS.
See detail 7-29A.
4of10
9 Issue Contact: Susan Joy
Cover Sheet: Provide the names, addresses, phone numbers for the
Developer(s)/or & Owners(s).
10 Issue Contact: Susan Joy
Cover Sheet: Update the signature block. See attached.
11 Issue Contact: Susan Joy
Grading Sheet: Need the contours extended a minimum of 50' offsite and tied
into existing contours.
12 Issue Contact: Susan Joy
Grading Sheet: Add the statement: "The top of foundation elevations
shown...". See the Checklist in Appendix E-4.
13 Issue Contact: Susan Joy
Grading Sheet: Provide drainage arrows and show positive drainage to streets
or to an approved drainage facility.
15 Issue Contact: Susan Joy
Overall Utility Plans: Add "Print Date" - all sheets.
16 Issue Contact: Susan Joy
Overall Utility Plans: Provide all existing and proposed ROW, property lines
and easements with dimensions. Label on all sheets.
17
IH
19
Issue Contact: Susan Joy
Overall Utility Plans: Provide a sidewalk along the frontage road according to
current LCUASS. This will require additional ROW and easements to be dedicated.
Show how the proposed work ties into the existing. Note: Adding the sidewalk will
change your drainage plan.
Issue Contact Susan Joy
Overall Utility Plans: Dimension all sidewalks.
Issue Contact: Susan Joy
Overall Utility Plans: Show existing driveway locations, labeled & dimensioned.
There are minimum distances between driveways required per LCUASS -
please refer to the standards.
3of10
88 Issue Contact: Steve Olt
Rick Lee of the Building Department indicated that he is forwarding a copy of
the various codes that the City Building Department will enforce. From the brief
information provided it is apparent that some of the exterior walls of the office
building and storage building will need to be one -hour construction per Table 5-
A. These rated walls must be carried to the roof deck above.
89 Issue Contact: Steve Olt
Current Planning's comments are on red -lined plans that are being forwarded to
the applicant.
Engineering
Issue Contact: Susan Joy
Provide TIS.
2 Issue Contact: Susan Joy
Provide a Striping Plan sheet showing striping, signage, etc., or show on overall
utility sheet.
3 Issue Contact: Susan Joy
Label and dimension all setbacks.
4 Issue Contact: Susan Joy
Complete and submit the Checklist in Appendix E-4.
5 Issue Contact: Susan Joy
Cover Sheet: Add preamble title of "Utility Plans for...." See LCUASS, section
3.3.1.G
6 Issue Contact: Susan Joy
Cover Sheet: Minimum size for the Vicinity Map is 10" x 10" and to a scale of
1"=1000-1500'. See LCUASS, section 3.3.1.C.1&2
7 Issue Contact: Susan Joy
Cover Sheet: Update the General Construction Notes. See Attached.
8 Issue Contact: Susan Joy
Cover Sheet: Need the following statement annotated on the Cover Sheet: "I
hereby affirm...". See LCUASS, section 3.3.1.F.
2of10
6a STAFF PROJECT REVIEW
Cihof FuA Collins
Land Images Date: 8/28/01
Trista Sigler
215 W. Magnolia
Fort Collins, CO 80521
Staff has reviewed your submittal for SPANJER OFFICE BUILDING, #25-01, and we offer the
following comments:
ISSUES:
Current Planning
75
Issue Contact. Steve Olt
Robert Lopez of AT&T Broadband (cable TV) indicated that they have fiber
optic line on the west side of South College Avenue from Harmony Road to
Cameron Drive, then it crosses to the east side of College Avenue.
76 Issue Contact: Steve Olt
Len Hilderbrand of Excel Energy (Public Service) indicated that no trees may
be planted within 4' of gas lines.
77 Issue Contact: Steve Olt
A copy of a comment letter received from Terry Farrill of the Fort Collins -
Loveland Water District and the South Fort Collins Sanitation District is
attached to this comment letter.
78 Issue Contact: Steve Olt
Tim Buchanan, the City Forester, indicated that the Landscape Plan has 3
Autumn Blaze Maple trees as street trees between the sidewalk and curb. This
species (Autumn Blaze Maple) is not on the "City Street Tree List". The
applicant needs to change the Autumn Blaze Maples to an approved species
off of the attached Street Tree List.
79 Issue Contact: Steve Olt
Matt Baker of the City's Street Oversizing Department asked that the applicant
please show proposed improvements (sidewalk, curbline, etc.) to the South
College Avenue Frontage Road. Please contact Matt, at 224-6108, if you have
a question about his comment.
o ire eao�elml;