HomeMy WebLinkAboutSPANJER OFFICE BUILDING - PDP - 25-01 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject:.- IznP & 130%LDP�w
Planner: _a'T .. Traffic Operations: —
—__ — Date:
Engineer:
Items Requested
Other Items Required
a' -' a � o
O
Redlined Items Being Returned
°= _c Other Items being
Ln Returned
Q
Encfineering--
Stormwater
Water/Wastewater
_
-
Traffic Operations
-
—
Transportation Planning
— — --
- -
Transfort
-
----
Natural Resources
-
--
--
-
Park Planning—
—
TOTALS
Other:
Note: All redlined items should be returned with the resubm ittal/ revisions.
lb N
Ae&
REV.LSION ROUTING SHc ET� f4)0t�,A 2
ITEM :�c
DATE RECEIVED:
Z
w
5z
H
CW7 F
o
z v)
zi?
z=
I V v`
z?
FILE: PROJECT PLANNER
ENGINEERING PAVEMENT
ZONING
BUILDING INSPECTION
LIGHT & POWER
;
TECHNICAL SERVICES
FORESTRY
/FCLD
PFA
POLICE - LORI DIGLIANI
ADVANCE PLANNING
STREETS
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
US WEST I
PUBLIC SERVICE
SCHOOLS: POUDRE / THOMPSON
AT & T DIGITAL CABLE
CDOT
DITCH COMPANY
RAILROAD: UP or BNSF
REA/DOE/PRPA
F
I
'
i