HomeMy WebLinkAboutSPANJER OFFICE BUILDING - PDP - 25-01 - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVESLandscape Architecture — Site Planning - Photography
215 W. Magnolia Street, ste. 202
Fort Collins, CO. 80521
970.472.8954
July 10, 2001
Brian Grubb
Fort Collins Planning Department
281 North College Avenue
Fort Collins, Colorado 80521
Ref.: Spanjer Office Building Planning Objectives
Dear City Review Staff,
We are pleased to submit this statement of planning objectives for Spanjer Office Building. The
following information was prepared in compliance with the Submittal Requirements for type I
Project Development Plan Review for commercial sites.
Spanjer Office Building is located at Cameron Drive, adjacent to the College Avenue frontage
road. The property is currently zoned C-commercial and is a vacant lot. The zoning for the
property is to remain commercial.
The total project is approximately .45 acres in size. A 3613 s.f. office building is proposed with a
920 s.f. storage unit. The building will be occupied by Spanjer Construction and one other office
tenant. In general, the site slopes from the northwest to the southeast.
The landscaping will be designed to meet a 6% internal landscape requirement and incorporate
xeriscape principles where applicable. The landscape will also serve functional uses such as
screening near property lines or enhancing views into and out of the site. Standard street tree
spacing is used on Cameron Drive but can not be incorporated along the frontage road due to the
existing utility easement.
Parking will be contained within the site and will include nine standard spaces and one handicap
accessible space.
Please see accompanying engineering report for a description of existing and proposed utilities
including sewage disposal, water supply, stormwater facilities, and fire protection. Also see
engineering drainage reports.
If you have any questions or comments regarding planning objectives, please feel free to contact
me at your convenience.
Thank Y u,
1�l
Michael Chalona