HomeMy WebLinkAboutREDTAIL RESIDENTIAL - FDP - 26-01A - CORRESPONDENCE - (12)the, underground parking facility be routed to'the sanitary line after going through a sand/oil
interceptor.
[4/17/06] Please extend pipe to show_ how drainage ties to underground parking facility near
building N. '
[9/9/05] Please show and explain how the flows from ramps leading to the underground
garages will be handled.
Be sure and return all of your redlined plans'when you re -submit. , . : ; .
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
Cameron Gloss
Troy Jones
City Planner
I
Page 4
[5/19/06] REPEAT COMMENT: Please remove the rocks on the north side of Cameron
Drive as previously requested. Replace that area with concrete as shown on the utility
plans.
[4/21/06] Repeat comment. Please match the utility plans.
[9/13/05] Cameron Drive, north side - the sidewalk is attached here to widen it out in front of
the parapet walls. Please remove the landscaping and match the utility plans.
Number: 618 Created: 5/19/2006
[5/19/06] Please show the parkway landscaping along College Avenue for the duration of
this project's frontage. This project is responsible for the parkway landscape, maintenance
and irrigation along College. The project boundaries should match the landscape plans.
Topic: Plat
Number: 620 Created: 5/25/2006
[5/25/06] From Technical Services: There are 3 "typo's" in the legal that do not match the
map. See redlines.
Number: 622
[5/30/06] See redlines.
Created: 5/30/2006
Topic: Site Plan
Number: 617 Created: 5/19/2006
[5/19/06] General note 7 may change at mylar depending on actual schedule.
Topic: Utility Plans
Number: 621 Created: 5/25/2006
[5/25/06] Gloria Hice-Idler and Ron Griese (Region 4 Utility Engineer) with CDOT has
approved the following note for the Utility Plans:
At the time of College Avenue widening, no cost shall be imposed to the Fort Collins -
Loveland Water District and South Fort Collins Sanitation District for the relocation of
existing utilities in College Avenue.
Per Gloria, it is Ron's position that CDOT would be responsible for the relocation of the
lines. I will forward Gloria's email to you for your records as well.
Department: Stormwater-Water-Wastewater Issue Contact: Basil Harridan
Topic: Easements
Number: 597 Created: 12/27/2005
[5/22/06]
[4/17/06] Please provide an easement exhibit detailing all needed drainage easements.
[12/27/05] Please provide all required drainage easements.
Topic: Flows into underground parking
Number: 534 Created: 9/9/2005
[5/22/06] Where will the drainage from underground parking facility be tied to. Will these be
gravity or pumped ? Clarify and add a note for documentation. Any drainage from the
underground parking facility should go through a sand/oil interceptor before being
discharged into the sanitary sewer. It is recommended that flows from the trench drain
intercepting stormwater from outside the garage be routed t the storm line and flows from
Page 3
[5/19/06], This email was sent May 17th to Jon Prouty to summarize a meeting with CDOT
on May 15th. Please make the changes required below and coordinate the plan sets so that
they present the same information.
John
We met with Gloria on Monday and wanted to let you know the results of that conversation.
Item 1 - College Ave improvements and timing
In regards to the timing of the College Ave improvements - There is not much budge room
here. Per Gloria the improvements on College Ave should be completed before even
construction traffic is added to the intersection - they would typically want all improvements
completed prior to any additional traffic being added to the intersection
We did get an agreement that rather than prior to any work on site that the College
improvements need to be done prior to the issuance of the first certificate of occupancy for
the site (prior to anyone living there). This is not the 9th building as you had desired, but is
better than CDOTs standard requirement.
Gloria was also fine with the sidewalk on College adjacent to Phase 2 being installed as an
asphalt sidewalk until the retaining wall is installed along here (which could be phase 2).
As a part of the phasing plans the plans will need to identify what is being built along
College Ave as a part of Phase 1 and what is to be built as a part of Phase 2. If the
retaining wall is not intended to be built as a part of Phase 1 this project will need to show
how the interim grading and erosion control will occur to accommodate the phasing. The
slopes within the row need to be 4:1 or flatter. The slopes behind the row to tie into existing
grade (for an interim without the retaining walls) also need to be 4:1 or flatter unless
stormwater approves a 3:1 slope in this area.
Item 2 - updated traffic study
A new updated traffic study will be needed when you apply for the access permit. CDOT
requires the traffic information for the access permit and the volumes and the uses need to
match the site plan. The City would like a copy of this updated study for our records when it
is completed.
Item 3 - District note on the plans
Gloria didn't think the note the district wanted would cause any problems with them, but she
did take a copy of the plan with her and is going to check with others to make sure. Have
not yet heard back from her yet. We will contact you once we hear from her and let you
know if there are any issues with the note.
Sheri
"Update: See comment number 621.
Topic: Landscape Plan
Number: 538
Created: 9/13/2005
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
LAGUNITAS REDTAIL, INC. Date: 1/4/2007
C/O JOHN PROUTY
3944 JFK PKWY #12E L01M
FT. COLLINS, CO 80525
Staff has reviewed your submittal for REDTAIL RESIDENTIAL PDP - TYPE II AND FINAL
PLANS, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Traffic Study
Number: 623 Created: 5/30/2006
[5/30/06] The TIS must be updated and submitted to the City for review. This is a CDOT-
driven request.
Topic: Trees
Number. 625 Created: 5/30/2006
[5/30/06] There are some street tree requirements along South College Avenue at the
northeast comer of the Redtail site. The location of the required trees must be addressed
and acceptable to the applicant, City, and water/sanitary sewer districts.
Topic: Utility Plans
Number: 624 Created: 5/30/2006
[5/30/06] A note that is required by the Fort Collins -Loveland Water District and the South
Fort Collins Sanitation District must be added to select utility plan sheets.
Number: 626 Created: 5/30/2006
(5/30/06] Basil Harridan of the Stormwater Utility indicated that there is an easement exhibit
that he still needs before signing the Final utility plans.
Number: 627 Created: 5/30/2006
[5/30/06] Basil Harridan of the Stormwater Utility asked that the applicant provide sufficient
information about where and how the proposed underground garage facility ties into the
storm sewer. A sand & oil interceptor must be included before this garage can tie into the
storm sewer. This just needs to be demonstrated to Basil. Another formal round of
development review is not needed.
Department: Engineering Issue Contact: Susan Joy
Topic: CDOT Permit
Number: 512 Created: 2/14/2005
[5/19/06] [4/21/06] [9/13/05] Just keeping the comment alive.
[2/14105] CDOT Permit required for the work done in College. Please submit the
application directly to Gloria at CDOT with an approved set of plans.
Topic. General
Number: 619
Created: 5/19/2006
Page 1