Loading...
HomeMy WebLinkAboutREDTAIL RESIDENTIAL - FDP - 26-01A - CORRESPONDENCE - SITE, LANDSCAPE & ELEVATIONS PLANSSOUTH COLLEGE IMPROVEMENTS PHASING NOTE The following S. College improvements shall be constructed in phases indicated: Phase I • Interim landscaping as per Interim Landscape Plan. • Temporary grading at east boundary of project adjacent to S. College. See Utility Plans and Interim Landscape Plan. • Temporary asphalt sidewalks at east boundary of project adjacent to the Fossil Blvd. retaining wall along S. College as shown. See Utility Plans and Interim Landscape Plan. • All S. College improvements shall be completed prior to first C.O. for Phase I, except for construction of the balance of the concrete sidewalk and all final grassed and irrigated parkway landscaping, landscaping irrigation and retaining wall at east boundary of project adjacent to S. College, which shall be complete in Phase II. See Utility Plans and Interim Landscape Plan. Phase II • Construction of the balance of the concrete sidewalk and all final landscaping, landscaping irrigation and retaining wall at east boundary of project adjacent to S. College. See Utility Plans and Final Landscape Plan. Steve Olt - Redtail Phasing Note Page 1 From: "Cathy Mathis" <cmathis@vfavfr.com> To: "Kaye Vincent" <lagunitas@frii.com>, "Steve Olt" <solt@ci.fort-collins.co.us>, "Susan Joy' <sjoy@fcgov.com> Date: 06/28/2006 4:43:34 PM Subject: Redtail Phasing Note Hi Steve and Susan, Attached is the word-smithed phasing note that Jon and I worked on this afternoon. If you are agreeable, then this is what we'll put in on the final site and landscape sheets. Steve, I will also forward to you the Plant Notes Cathy