shown. Also the directional ramps at Conejos and Fossil Blvd. should align
with the sidewalks as much as possible.
8/ 14/ 1: Provide a copy of the off -site drainage easement and Reception
Number.
1/9/2: Repeat.
8/ 13/2: Third time Repeat. Please see attached and/or call me if you still
don't understand what I'm asking for. 221-6605.
3/31 /3: Your response is acknowledged. This item will remain open until
the easement is received.
Department: Transportation Planning Issue Contact: Hurt
Ravenschlag
Topic: Utility Plans
Number: 523 Created: 8/26/2005
[8/26/051 See minor comments on sheet 28, 33, 34, 35, and 41.
Number: 524 Created: 8/26/2005
[8/26/051 Use standard City bike lane signs and stencils.
Number: 525 Created: 8/26/2005
[8/26/051 Coordinate design with City/CDOT US 287 Bike Lane Project.
The following comments and concerns were expressed at the City staff
review meeting on September 7, 2005:
Engineering:
1. There is still some right-of-way that needs to be vacated.
2. The dedicated easements look pretty good.
3. The sight distance easement still needs to be completed.
4. Overall, the plans are looking pretty good. Another round of "formal"
review is not needed.
Stormwater:
1. Stormwater is not certain that all of the necessary easement exhibits
have been submitted to the City for review.
2. Bob Zakely of the Stormwater Utility wants to schedule a meeting with
the applicant's engineer.
Page 13
1. Please schedule a meeting with Bob Zakely, 224-6063 to discuss the
erosion control plan.
Topic: Flows into underground parking
Number: 534 Created: 9/9/2005
[9/9/05] Please show and explain how the flows from ramps leading to the
underground garages will be handled.
Topic: Grading
Number: 533 - Created: 9/9/2005
[9/9/05] It is recommended that a cut off wall be designed onto the main
run down where storm sewer line 1 enters the swale leading into Pond C to
hold the grade in case erosion develops at this location.
Topic: Landscape Plans
Number: 530 Created: 9/9/2005
[9/9/05] The proposed tree in front o Building I does not mean the
minimum 10 foot separation from the proposed storm sewer.
Topic: Overflow Spillway for Water Quality Pond
Number: 531 Created: 9/9/2005
[9/9/05] Please make sure that rip rap for the overflow spillway called out
on the water quality pond is buried and seeded. Whenever possible call out
rip rap to be buried.
Topic: Pond Water Surface Elevations
Number: 535 Created: 9/9/2005
[9/9/05]
It seems that all existing pond water surface elevations are from readings or
observations taken in the fall of 2000. Since this project will be built at
least 5 years later an updated pond water surface elevations would be a
good idea.
Topic: Utility Plans
Number: 532 Created: 9/9/2005
[9/9/05] Typically we do not allow public storm sewers under retaining
walls. If the pipes crossing retaining walls at the east end of Fossil
Boulevard, the storm sewers should be shown to be able to structurally
support the retaining walls. Additionally, please add a note to the utility
plans stating that in case these walls need to be disturbed for maintenance
of the pipes the reconstruction of the walls will be the responsibility of the
HOA.
Even though Storm Line 9 designed to be submerged and is currently
designed to be at 0.0 % slope, is there a possibility of introducing a minimal .
0.5 % grade to this line.
Page 11
4. Appears to be inadequate space for electric meters south of the water
service on the west end of building C.
5. The electric services to buildings E & F will be within 3 ft. of the 8" fire
line.
6. The electric service line will be within 6 ft. of the sewer service to
building D.
Department: Natural Resources Issue Contact: Doug Moore
Topic: Temporary Construction Easement
Number: 527 Created: 9/6/2005
[9/6/05) Grading and other construction activity is show all the way to the
southern property line (adjacent to city owner Red -tail Natural Area).
Applicant has failed to initiate the required Natural Areas Easement
process, as earlier agreed. NRD is willing to attempt to provide a Natural
Areas permit to allow for minor encroachments from construction activity.
The applicant must complete a permit request (
http://www.fcgov.com/naturalareas/pdf/natural-areas-permit.pdf) and
provide for restoration including but not limited to revegetation and
regrading of any disturbed areas. Corp wetland mitigation may also apply.
Additional language will be included in the development agreement and with
the development construction permit. Failure to obtain either a natural
areas easement or permit may lead to stop work orders being placed on
project during the time of construction.
Department: PFA Issue Contact: Michael Chavez
Topic: General
Number: 519 Created: 2/ 15/2005
12/ 15/051 After reviewing this proposed project Poudre Fire Authority has
no concerns or further comments at this time.
Department: Police Issue Contact: Joseph Gerdom
Topic: General
Number: 479 Created: 1 /25/2005
[1/25/051 Need response to photometric/site lighting issues raised
8/ 15/02 - would like to see updated photometric plan for entire site.
Department: Stormwater Utility Issue Contact: Basil Hamdan
Topic: Box Culvert Inlet Box Control
Number: 421 Created: 8/ 13/2003
[2/2/05)
Provide a detail for the wing walls and riprap boulders associated with
Storm Line 9 similar to the one provided for Storm Line 8.
[8/ 13/03)
The Inlet Box control detail for Storm Line 9 needs to be clarified. Two
different elevations are called out for the spillway, one on the detail, the
Page 9
Sheet 9 - Please contact Stormwater and Natural Resources regarding any
grading shown greater than 4:1. Offsite grading shown (discussed under
"Letters of Intent"). See redlines for other comments.
Number: 400 Created: 8/8%2003
[9/ 13/05] Sheet 11, repeat, offsite grading can not occur without an
easement from the RR. Also, is there a retaining wall here? Handrail
indicated but no reference to a detail. Please show exactly what is getting
built here.
[2/l/05] [5/7/04] Scanning issues, grading shown exceeding 4:1, label the
R of the curb return at Conejos and Fossil Blvd., offsite grading shown at
the western property line (either pull it back on the property or obtain a
grading easement from the RR), and label the slope ratio in the area of
section C-C.
Sheet 11 - Please see the comment given by Tom Reiff, Transportation
Planning, regarding the ramps and detached sidewalk on the south side of
Redtail Court (north side of the pond).
Number: 404 Created: 8/8/2003
[9/ 13/05] Repeat. Still need design.
[2/ 1 /05] If the footings for the retaining walls are on the neighboring
property then you will need. permanent easements. If you can't construct
the wall within your property boundaries then you will need temporary
easements.
[5/7/04] Repeat comment. Show limits of the grading easement needed
from the property owner to the north. Scanning problems with this sheet,
please see Appendix E6. See redlines for additional comments.
Sheet 13 - Please provide the Grading Easement shown and remove the
word "temporary". Correct the overlapped labeling and provide missing BW
elevations.
Number: 405 Created: 8/8/2003
19/ 13/05] Much better but wouldn't hurt to run these by JR in Tech
Services before submitting again just to make sure your mylars will scan.
You can do this just prior to submitting mylars too.
[2/ 1 /05] Please see JR in Tech Services before resubmitting. The plans will
not scan as is and Tech Services will not accept the mylars even if they are
signed off. They will refuse them until they are scannable, even if it means
the mylars have to be resigned by everyone again.
[5/7/04] Repeat, shaded areas will not scan.
Sheet 14 and 15 - Some areas are too dark to scan properly.
Page 7
Number: 412 Created: 8/8/2003
[9/ 13/05] See redlines.
[2/11/051 [5/7/04] Repeat.
Sheet 39 - Provide elevations at each corner of the box so that they can set
it in the field (this page or next, whichever makes more sense). Provide the
size of the box culverts and the structural information from the
manufacturer. Show the roadway placement, cover over the box, etc. (Keep
in mind 12.2.2)
Topic: Retaining Wall Details
Number: 323 Created: 4/2/2003
[9/ 13/05] See redlines.
[2/ 11/05] The details provided with this last submittal are incomplete.
They need to be included as part of the Utility Plans and show where the
property lines are in relation to the wall placement (including the geogrid) at
each of the locations that are in or impact public row, utility easement or
infrastructure.
Please provide more information on the retaining walls. Will they have
footings? How high are the ones in the natural areas?
Topic: Scanning
Number: 506 Created: 2/ 14/2005
(9/ 13/05] 12/ 14/05] See Appendix E6 for scanning requirements. Please
meet with Technical Services before resubmitting the plans to make sure
that the plans are acceptable.
Topic: Site Plan
Number: 379 Created: 8/5/2003
[9/ 13/05] Please see JR Wilson in Technical Services.
[2/2/05] 14/30/04] Repeat comment. The site plan is still not scannable
and will not be approved until it is.
(08/05/03) See Appendix E6 for scanning requirements.
Number: 536 Created: 9/ 13/2005
(9/ 13/05] Please show the complete sight distance triangle including the
piece on the Woodley's property.
Topic: Utility Plans
Number: 32 Created: 8/ 14/2001
[9/ 13/05] See redlines for comments and questions (S1-S5 and sheet 41).
[2/ 1 /05] The retaining wall design must be included in the utility plan set.
[5/7/04] Keeping this comment open until resolved. This comment ties in
with the new comment under General.
8/6/3: This comment is mentioned elsewhere, so please forgive the
duplication. We will need the property line shown on the various cross
sections so that we can determine whether or not construction easements
Page 5
Number: 459 Created: 5/7/2004
[9/ 13/05) Phasing is now shown, however, do you want to install the
waterline for Phase 2 in Phase 1 so that you avoid triple street cut fees
later? If so, please add a note: Install with Phase 1.
[2/2/05) [5/7/04) The site and landscape plans show phasing. Are the
utility plans being phased as well? If so, the utility plans will need to reflect
that.
Number: 518 Created: 2/ 15/2005
[2/ 15/051 A public access easement through the underground garage is
required.
Topic: Grading
Number: 236 Created: 8/ 16/2002
[9/ 13/05) What is the grade at the top of the walk along College Avenue at
the north end of the property? Is it consistently 5% or does it change from
spot to spot?
[2/ 11 /05] Please label the slope on the reconfigured onsite sidewalk
connection from College Avenue to the cul-de-sac. The grading around the
sidewalk was illegible. Please make sure that the grades have been
designed to accommodate the sidewalk.
8/ 14/2: The serpentine sidewalk along College Avenue is not acceptable.
Please design to ADA guidelines and to our arterial cross section standard.
The sidewalk should run parallel to College with a series of landings as
outlined in the ADA guidelines.
Topic: Landscape Plan
Number: 380 Created: 8/5/2003
[9/ 13/05) [2/2/05) (05/05/04) Repeat comment. Please see Tech
Services before resubmitting plans to make sure that plans are scannable.
See Appendix E6 for scanning requirements.
Number: 537 Created: 9/ 13/2005
[9/ 13/05) Please provide a key map.
Number: 538 Created: 9/ 13/2005
[9/ 13/05) Cameron Drive, north side - the sidewalk is attached here to
widen it out in front of the parapet walls. Please remove the landscaping
and match the utility plans.
Number: 539 Created: 9/ 13/2005
[9/ 13/05) Show the ENTIRE sight distance easement offsite.
Page 3
Lagunitas Redtail, Inc.
c/o Jon Prouty
3944 JFK Pkwy # 12E
Ft. Collins, CO 80525
STAFF PROJECT REVIEW
Date: 09/ 15/2005
Staff has reviewed your submittal for REDTAIL RESIDENTIAL PDP - FINAL
PLAN (TYPE In, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: General
Number: 542 Created: 9/ 15/2005
[9/ 15/05) Carl Jenkins of the United States Postal Service (LISPS)
indicated that for mail service a centralized delivery using a minimum of 5
centralized box units (CBU's, 5 Industry Type III) is required. Revise the
plan to show the required CBU locations as approved by the USPS. In all
cases the CBU's must be located in the public right-of-way or a designated
easement. Be advised that the responsibility of purchase and maintaining
the CBU's, with concrete pads, is that of the owner/developer/builder/HOA.
Prior to occupancy with the development approved receptacles must be in
place. A Delivery Agreement will be in place prior to any delivery of mail.
Contact Carl Jenkins, Growth Coordinator, U.S. Postal Service, 301 East
Boardwalk Drive, Fort Collins, CO., phone #970-225-4130, cell #970-214-
3668, fax #970-225-4139.
Topic: Landscape Plan
Number: 540 Created: 9/ 15/2005
[9/ 15/05) A copy of a memo received from Tim Buchanan, the City
Forester, is attached to this comment letter. The memo contains 2 planting
notes that must be added to the Landscape Plan. Also, the applicant needs
to include a schedule of existing trees and mitigation on the Landscape
Plan.
Topic: Utility Plans
Number: 541 Created: 9/ 15/2005
[9/ 15/05) A copy of a comment letter from Terry Farrill, the District
Engineer for the Fort Collins -Loveland Water District and the South Fort
Collins Sanitation District, is attached to this comment letter.
Page 1