HomeMy WebLinkAboutREDTAIL RESIDENTIAL - FDP - 26-01A - CORRESPONDENCE - REVISIONS (4)419 —Added detail for the trash rack. Added Riprap pad to protect bank in an overflow
condition. See revised grading plan.
Topic: Pond Water Surface Elevations
496 — Acknowledged will get the current WSEL when the plans close to being approved.
Topic: Retaining Wall Details
495 — See the retaining wall design by Week's and Associates. Included in the utility
plans sheets S1-S5.
Topic: UtilitV Plans
498 — Revised storm sewer layout. See revised utility sheets.
Department: Transportation Planning
Topic: Easements
443 —The track in which the walk is located in is designated as a utility, drainage and
access easement. See revised Plat.
Department: Transportation Planning
Topic: Plat
493 — Second walkway connection to Mason Street trail has been increased to 6'.
Department: Transportation Planning
Topic: Transportation
289 — Deleted the crosswalks and ramps.
Do not hesitate to contact my office if you have questions or comments regarding the
above information or our submittal documents.
in
erely,
Prouty
JP/Ins
513 — Address redlines in review plan set.
514 — Address redlines in review plan set.
Department: Light & Power
Topic: UtilitV Plans
477 — Sewer lines relocated.
478 — Revised utility layout, per utility coordination meeting 2/23/05. See revised utility
sheets.
Department: Police
Topic: General
479 — Updated photometric plan provided.
Department: Stormwater Utility
Topic: Box C!±lvert Inlet Box Control
421 — The box culvert and wing wall details are located on sheets 39 and 40. The
riprap detail is located on sheet 42.
Topic: Details
500 — Moved detail to sheet 42.
Topic: Easements
494 — Included the recorded easements and reception numbers with this submittal. The
remaining easements are currently being acquired by the Lagunitas Company.
North Star Design is providing an updated easement exhibit.
Topic: Grading
497 — Variance letter re -submitted with Terracon amendment letter.
Topic: Landscape Plans
501 — Storm sewer layout has been revised. See revised utility plan by North Star
Design and the revised Landscape plan by VF Ripley.
Topic: Pond C Outlet Structure
406 — Revised dimensioning in the detail for the bump out.
410 — Working on the scanability and legibility of the plan set.
411 — Revised cross sections as redlined.
412 — Spot elevations are located on the grading plan to show the inverts of the box
culverts, the top of wall (TW) and bottom of wall (BW) for the wingwalls. The storm
sewer sheets also shows the inverts of the culverts along with lengths and slopes. The
details located in the detail sheets are standard details. The information presented on
these sheets is adequate to install/construct the precast culvert and the wingwalls to
there design location. Also if we start adding additional design spots to the details I feel
we increase our chances of having problems during construction.
413 — See the revised wall design by Week's and Associates. Sheets are included in
the utility plans S1-S5.
485 —Word "minimum" has been removed from the typical street section.
486 — See the revised wall design by Week's & Associates. Sheets are included in the
utility pians S1-S5.
487 — Replaced details with the latest details from the City of Fort Collins
488 — Included with submittal.
489 — Variance letter re -submitted with Terracon amendment letter.
504 — Added design from Week's and Associates to the utility plan set.
505 — Address redlines in review plan set.
507 — Revised the legend.
508 — See the revised wall design by Week's and Associates. Sheets are included in
the utility plans S1-S5.
509 — Added variance 8 to notes sheets. To my understanding the other culvert
crossing is using the standard 11008-parapet wall detail.
510 — Address redlines in review plan set.
511 — It is the intention that the outlet structure and the storm pipe will be maintained by
the HOA. Added note in the storm sewer plans that this is the case. If you wish to
provide for this contingency in the development agreement, please do so (i.e. if the
Council does not vacate the frontage, HOA will maintain this culvert).
32 — See retaining wall design by Week's and Associates, Sheets S1-S5
42 — Added phasing to the utility plans.
236 — Slope on the reconfigured onsite sidewalk is now legible.
305 — Per utility coordination meeting on 2/23/05. Solution to the utility routing was
agreed upon. Variance letter #9 is included in this submittal.
381 — Revised line weights and hatching patterns to better facilitate in the scanning
process.
394 — Revised line weights and hatching patterns to better facilitate in the scanning
process.
396 — Per section 7.7.2.A this slope requirement is within the ROW or areas directly
affecting the ROW. The areas that are steeper than 4:1 are located outside of the ROW
and will not directly affect the ROW, therefore this requirement is not valid. I have
however made the slopes as flat as possible wherever I could. The retaining wall on the
west will be located entirely within the property boundaries. The wall will be designed
with building permits. BW elevations have been provided on all retaining walls. Added
notes to see Sheet 42 for details. Easement for the property on Lot 3 is currently being
acquired.
397 — See response 396 for grading steeper than 4:1. The picnic structure is shown
adjacent to the utility easement. The line that is shown is the outside limits of the roof
line. The foundation will be a minimum of two inside the outer limits of the roof. The
footing will not encroach into the utility easement and this will be verified at with the
building permit.
399 — An amended soils report is provided by Terracon. See the revised wall design by
Week's and Associates for the bridge design. Bridge detail sheets are included in the
utility plans S1-S5.
400 — Working on the scanning issues. See revised horizontal control plan for all
radius. No grading is proposed on the RR property. Added slope ratios.
401 — Overlapping labeling corrected.
404 — See the revised wall design by Week's and Associates. Sheets are included in
the utility plans S1-S5.
405 — Acknowledged. We are working on the plan to make them acceptable for Tech
Services.
380 — Plans are in a scanable format.
499 — Contours removed for legibility.
Topic: Plat
77 —Tracts A-H are to be owned and maintained by the HOA. See revised Plat.
240 — Once vacation documents have been fully executed the affected landowners of
Lots 16-25, Tract A, Tract B and Lot 5 and their lien holders will sign plat.
314 — King Surveyors to address. See revised Plat.
480 — King Surveyors to address. See revised Plat.
481 — 15' easement labeled.
482 — All block shown as closed fioure with dimensions.
483 — Easements are locatable.
490 — New plat language is being used.
491 — Obtaining necessary signatures for Deed of Dedication document, and will
forward document upon its completion. Two copies of the unexecuted document are
provided for the project's planner and engineer.
492 — Tracts A-H are to be owned and maintained by the HOA. See revised Plat.
515 — Plat language updated.
Topic: Scanning
506 — Scanning requirements will be resolved.
Topic: Site Plan
379 — Agreed.
389 — Sidewalks dimensions 5.6'.
516 — Project ID signs moved out of utility easement.
Topic: Utility Plans
16 — Easement and reception number is included in this submittal.
300 — The attached sidewalk on Cameron Drive next to the retaining wall has been
increased to 6.5'. The footings for the picnic shelter are out of the utility easement. The
south corner of the roofline however, touches the utility easement.
309 — Per conversations with CDOT they had verbally accepted the design. However
since the staff at CDOT has changed we will obtain another agreement.
323 — Engineering details of concrete retaining walls adjacent to public roads are
provided by Gary Weeks and Associates. See additional retaining wall design Sheets
S1-S5 included in the utility plan.
367 — Request for two vacations, legal descriptions and exhibits are included with
submittal, as well as, a disk with same information (note ---disk is being submitted to
project's engineer, Susan Joy).
402 — Added reception numbers to the easements that have been obtained. Provided
copies of the recorded easements with this submittal. The remaining easements are in
the process of being acquired. Public Access Easement will be on the whole tract.
459 — Utility plans now reflect phasing.
460 — Plans are nova coordinated so they now all show the same information.
461 — Recorded offsite easements are being provided by separate document along with
their reception numbers.
462 — Added notes in the grading plan that walls 30" or greater shall have handrails.
463 — See revised retaining wall design by Week's and Associates. Included in utility
plans Sheets S1-S5.
484 — The project title "Redtail" is now the same on all plan sets.
503 — Moved the retaining wall 2' to the west. Attached walk to wall.
517 — Easements on various plans now match.
518 — The garage will only be accessed by the residents of the building. This issue will
be address with the HOA documents.
Topic: Landscape Plans
159 — Requested landscape revisions have been completed.
312 — Redline comments responded to.
August 15, 2005
Steve Olt
City of Fort Collins
Current Planning
281 N. College Avenue
Fort Collins, CO 80521
Re: Redtail Project
Dear Steve:
The following information is my response to the staff review comments dated February
15, 2005:
Department: Current Planning
Topic: Overall Utility Plans
502 — We are working with Terry Ferrill on utility issues. Plan set will be submitted for
his review.
Department: Engineering
Topic: CDOT Permit
512 — Acknowledged CDOT permit to be obtained after City of Fort Collins approval.
CDOT approval block has been removed from the plan set.
Topic: General
165 — Reception numbers have been obtained for the site triangle, on Lot 1
(Woodley's), Lot 13, Lot 11, Lot 10 and Lot 5. Still waiting for reception numbers for Lot
14, Lot 12 and Lot 3.
226 & 301 — Obtaining necessary signatures for Deed of Dedication document, and will
forward document upon its completion. Two copies of the unexecuted document are
provided for the project's planner and engineer.
3944 JFK Parkway,
, Fort Collins, CO 80525 - (970) 226-5000 • Fax (970) 226-5125