Loading...
HomeMy WebLinkAboutREDTAIL RESIDENTIAL - FDP - 26-01A - CORRESPONDENCE - (20)Yours Truly, Steve Olt, City Planner cc: Susan Joy Basil Hamdan Doug Moore Doug Martine David Averill North Star Design Current Planning File #26-01A Page 18 Light & Power: 1. There is concern about the proposed retaining walls along the edge of the roads. Where will the power go relative to these walls? It may be possible to put conduit right under the walk. 2. The developer could work with Light & Power on some street lighting design. Transportation Planning: 1. An easement for the trail connection to the Mason Street Corridor at the southwest corner of the development must be included on the subdivision plat. 2. The angle of the street crossing for the trail connection at the northwest corner of the development, to the Mason Street Corridor, should be looked at. Maybe the handicapped ramps should be eliminated. Natural Resources: 1 0 , 1. They are still waiting for the developer to provide them with a letter From the Corps of Engineers. They need to approve the development plans. 2. A variance (or modification) is needed for the slope of the road. 3. There are open water requirements associated with this development. 4. The retaining walls need to be shown on the utility plans. There are some significant issues that have to be resolved before the development plans can be approved. The applicant could possibly meet with appropriate City staff (Engineering, Stormwater, Natural Resources iggR d Power, Transportation Planning, and Current Planning), in lieu of another re -submittal and formal round of review, to discuss and try to resolve these issues. Please be sure and return all of the red -lined plans if/when you re -submit. If a re - submittal is going to be made please contact Steve Olt, prior to re -submittal, for the number of copies of each document to provide. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Page 17 The following comments and concerns were expressed at the City staff review meeting on February 2, 2005: Engineering: 1. Easements from the property owners would be needed for retaining walls that are on other properties, if applicable. 2. The roads proposed to cross the pond cannot be built with the information provided to date. 3. There are 2 phases of development shown on the Site & Landscape Plans. The utility plans must show the same phasing. 4. Necessary street right-of-way (ROW) vacation is still needed. 5. The retaining wall proposed to be in the South College Avenue ROW requires a variance. 6. Where attached to the back of curb for a street the sidewalks must be a minimum of 5.5' wide. 7. The road needs to be completely designed and the soils report for this project needs to be amended. Stormwater: 1. Signed copies of the proposed grading & drainage easement must be provided to the City. 2. How does the storm water outfall for this development get to South College Avenue? 3. Where is the storm sewer in Fossil Boulevard? It could conflict with Light & Power or Water/Wastewater services. Page 16 Department: Transportation Planning Issue Contact: Tom Reiff Topic: Easements Number: 443 Created: 5/5/2004 [2/1/05] Follow up comment from DA: This doesn't appear to fall entirely in ROW or an Public Access Easement. Please clarify. Thanks. [5/5/04] Is the walkway connection from the College Ave. sidewalk to the Fossil Blvd sidewalk placed in a public access easement or is it in ROW? Department: Transportation Planning Issue Contact: David Averill Topic: Plat Number: 493 Created: 2/1/2005 [2/1/05] Would it be possible to widen the southern walkway connection to the Mason Transportation Corridor (from the Conejos Rd. cul-de-sac)? Typically these are 8 feet in width, but since there is another connection (shown at 8') to the north we could probably settle for 6' at a minimum. Thanks. Department: Transportation Planning Issue Contact: Tom Reiff Topic: Trwwportation Number: 289 Created: 3/28/2003 1 [2/1/05] Follow up from DA: Thanks for widening out the sidewalk. The crossing of 1 Fossil and Conejos is still problematic. The ped crossing (and affiliated ramps) need to w��L be oriented to either Fossil or Conejos at 90 degress, and not diagonally across this curve in the road. See redlined site plan for detail. Thank you. [5/4/04] The attached sidewalk along the northern portion of Conejos Road is acceptable, but the width needs to be increased to 6-feet, NOT 4'6" as shown. Also the directional ramps at Conejos and Fossil Blvd. should align with the sidewalks as much as possible. 8/14/1: Provide a copy of the off -site drainage easement and Reception Number. 1/9/2: Repeat, 8/13/2: Third time Repeat. Please see attached and/or call me if you still don't understand what I'm asking for. 221-6605. 3/31/3: Your response is acknowledged. This item will remain open until the easement is received. Page 15 Topic: Landscape Plans dumber: 501 Created: 2/3/2005 LGj /3/051 The proposed storm sewers on Conejos Road, Cameron Drive and Fossil_, *Boulevard do not have the minimum 10-foot horizontal separation from trees as shown on the landscape p ans. Since the alignment of the storm sewers also interferes with r the location of electrical facilities, it is suggested that the landscape architect attend the planned meeting between the engineer, stormwater and light and power staff, in order to determine how all the utilities can best be co -located with the required all landscaping for the site. Topic: Pond C Outlet Structure Number: 419 Created: 8/13/2003 [2/2/05] Please provide a detail as to how that pond outflow pipe and spillway will be improved. Topic: Pond Water Surface Elevations Number: 496 Created: 2/1/2005 [2/1/05] It seems that all existing pond water surface elevations are from readings or observations taken in the fall of 2000. Since this project will be built at least 5 years later an updated pond water surface elevations would be a good idea. Topic: Retaining Wall Details Number: 495 Created: 2/1/2005 [2/1/05] Please provide a construction quality detail for all proposed retaining walls for this site that will be supporting roads and utilities. The submitted design does not clearly identify where this design will be applied. The landscape modular block wall design can be provided at time of building permit. Topic: Utility Plans Number: 498 Created: 2/1/2005 [2/1/05] There are several locations (along Fossil Creek Boulevard, along Cameron Drive and along Conejos Drive) where the storm sewer alignment would interfere with potential Light and Power lines' locations. A meeting is suggested between the applicant, the engineer and our Light and Power staff to discuss potential adjustment to the alignments of either the storm or the electrical lines. Please maintain at least 10 feet of horizontal separation for storm sewers from electric lines. Page 14 Department: Police Issue Contact: Joseph Gerdom Topic: Genera/ APPII ` Number: 479 j Ltd Vl1`` Created: 1/25/2005 [1/25/05] Need response to photometric/site lighting issues raised 8/15/02 - would like to see updated photometric plan for entire site. Department: Stormwater Utility Issue Contact: Basil Hamdan Topic: Box Culvert In/et Box Control Number: 421 Created: 8/13/2003 [2/2/05] Provide a detail for the wing walls and riprap boulders associated with Storm Line 9 similar to the one provided for Storm Line 8. [8/13/031 The Inlet Box control detail for Storm Line 9 needs to be clarified. Two different elevations are called out for the spillway , one on the detail, the other one on Line 9 profile. Please specify the size of boulders and the type (color) of boulders that are to be used in that detail. Topic: Details Number: 500 Created: 2/2/2005 [2/2/05] Please provide an outlet structure detail for the water quality pond at the notheast of the site. Please number this pond for easier reference. Topic: Easements Number: 494 � k� - Created: 2/1/2005 [2/1/05] Please provide a copy of the proposed grading drainage easements by separate document on the north and northeast side of the site, notably for the grading on the existing lots on Coronado Drive, the grading to the south of Lot 1-C, the grading on the existing lot to the east of Pond C, the grading on the property to the north and the proposed outfall pipe and riprap downstream of the water quality pond. A copy of the easement exhibit that was prepared would also be appreciated. Topic: Grading Number: 497 Created: 2/1/2005 [2/1/05] The variance request for slopes that are steeper than 3:1 should be OK, provided an acceptable method of stabilizing the slopes to provide erosion protection is specified. Page 13 Number: 507 Created: 2/14/2005 (2/14/05] Expand the Legend to include retaining walls. The easement line needs to be called "existing easement". Number: 508 Created: 2/14/2005 [2/14/05] The parapet wall along Cameron Drive has to be designed to detail 1108. Include all necessary details and design in the plan set. See Young's Creek development for a good example. Number: 509 Created: 2/14/2005 [2/14/05] Add to line 48 - a variance -was -granted to the parapet wall design over the pond to allow overtopping of the road was something to that effect). FYI - No other variance for any other parapet has been asked for to date and all other parapet walls at the row must be designed per 1108. Numb r: 510 Created: 2/14/2005 (2/14/05] Sheet 13 - See redlines. Number:511 -r Created: 2/14/2005 v, [2/14/051 Sheet 24 - Note 4: We need to talk about this. If Council does not vacate the frontage road than stormwater may require that the HOA to maintain this culvert. Number: 513 Created: 2/14/2005 [2/14/05] Sheer see redlines. 4 f Number: 514 Created: 2/14/2005 12/14/05] Sheet 44 - see redlines. d �/& 4-e Department: Light 6 Power Issue Contact: Doug Martine ° Topic: Utility Plans Number; 477 Created: 1/12/2005 [1/12/05] The storm sewer lines on both sides of Conejos Rd. at Cameron Dr. need to t' be relocated to the street side of the curb in order to provide space for electric facilities. Number: 478 Created:1/12/2005 [1/12/05] It appears that at several locations water and/or fire service lines will need � khek' to be relocated to provide space for electric facilities. Also need to coordinate e61 locations for electric (and gas) meters. Therefore, a utility coordination meeting is tx� strongly encouraged. Page 12 Number: 413 Created: 8/12/2003 [2/11/051 [5/7/04] Repent. I gave a copy of all of the notes we'll require on the plan sets in August of 2003. They still have not appeared on the plans to date. Please see Young's Creek pl arts for a good example. Sheet 40 - See attached for additional notes on the retaining wall and handrail requirements. Select the appropriate notes and include them on this sheet. Show how the curb, gutter, sidewalk, parapet, etc, in the typical culvert layout. Number: 485 Created: 2/1/2005 [2/1/05] Typical Street Sections - Please remove the word "minimum". The street sections need to show exactly what is being built. Number: 486 Created: 2/1/2005 [2/1/05] The parapet walls are preliminary and labeled to be designed by others. That's fine, but the design needs to be included in the plan set or we can't sign off on the plans. Please provide the design and all necessary details in order to correctly build the road through the pond. Number: 487 Created: 2/1/2005 [2/1/05] I have the new "official" ramp detail that I can email to you. Please include ii in the plan sets and make sure that the correct row is being dedicated to accommodate them. Number: 488 Created: 2/1/2005 [2/1/05] Pyse camp ete and submit Appendix E4 with the next submittal. Any -apptitaTle item not included in the plan sets will become a new comment. Number:489 /��``t Created: 2/1/2005 [2/1/05] The variance_ request, for the 2.7:1 grading on either side of the pond crossing needs to have a soils engineer detail how the soil will be stabilized in these areas, if special matting is required, if a special soil needs to be imported, etc, before we can determine if we can approve it or not. Number: 504 Created: 2/14/2005 [2/14/05] The design from eeks needs to be included in the utility plan set. Identify eacf cross section on the utility plans and show where the property line is where applicable. Need additional details for the railing and storm culverts 4,3, and 3a. See redlines for other comments. Number: 505 Created: 2/14/2005 [2/14/05] See redlines for additional comments. Page 11 [5/7/04] Repeat, shaded areas will not scan. Sheet 14 and 15 - Some areas are too dark to scan properly. Number: 406 Created: 8/8/2003 [2/1/05] Corrections required. [5/7/04] Please provide a detail of the street widening labeling all the dimensions shown in detail 7-24. You do not need to add detail 7-24 to the detail sheets. Sheet 16 thru 18 - Show and dimension all sidewalks. Dimension all radii and driveway widths. Show and dimension all parking stalls. Provide a detail of the street widening per 7-24. Show and label R1, R2, R3, W, PC, PCR, etc. You can put this detail here or on the plan and profile sheets, whichever works best for you. Show and dimension all easements. Correct all overlapped labeling. Project ID sign and viewing shelter must be located out of the utility easement. Number: 410 Created: 8/8/2003 [2/1/05] (5/7/04] Shaded areas will not scan. Suggest removing the shading and the striping symbols and try using an outline with wide diagonal hatching instead of the shaded areas to show limits of construction. Increase the width of the sidewalk and attach it to the retaining wall instead of leaving an unmaintainable strip between the wall and the sidewalk (if the location of the wall is staying and is agreed to by the utility companies). Sheet 29 - Scanability issues, see redlines. Show approximate area of the street cut where the ramp is being installed. Add street cut note. Number: 411 Created: 8/8/2003 [2/11/051 [5/7/04] Need to show the retaining wall in the cross sections where ever it occurs. Sheet 32 - Label all slopes (4:1 max allowed). Number: 412 Created: 8/8/2003 [2/11/051 [5/7/04] Repeat. Sheet 39 - Provide elevations at each corner of the box so that they can set it in the field (this page or next, whichever makes more sense). Provide the size of the box culverts and the structural information from the manufacturer. Show the roadway placement, cover over the box, etc. (Keep in mind 12.2.2) Page 10 [2/11/05] The bridge requirement has been changed. Instead, a road with sloped embankments will be allowed. A full design for the road, including a revised soils report, is still required. All the proper details and notes for the parapet walls are required. See Young's Creek plans for a good example of the notes and info required to make this road 60dable. [5/7/04] Repeat comment. The bridge needs to be designed in accordance with details 1107 and 1108. See comments regarding sheet 39-41. Number: 400 Created: 8/8/2003 [2/1/05] [5/7/04] Scanning issues, grading shown exceeding 4:1, label the R of the curb return at Conejos and Fossil Blvd., offsite grading shown at the western property line (either pull it back on the property or obtain a grading easement from the RR), and label tAhe sl ratio in the area of section C-C. Sh 11 - Please see the comment given b Tom Reiff, Transportation Planning, g y ff, p g, regarding the ramps and detached sidewalk on the south side of Redtail Court (north side of the pond). Number: 401 Created: 8/8/2003 [2/1/05] [5/7/04] Repeat. Sheet 11 - See redlines. Correct overlapping labeling. Number: 404 Created: 8/8/2003 [2/1/05] If the footings for the retaining walls are on the neighboring property then you will need permanent easements. If you can't construct the wall within your property boundaries then you will need temporary easements. [5/7/04] Repeat comment. Show limits of the grading easement needed from the property owner to the north. Scanning problems with this sheet, please see Appendix E6. See redlines for additional comments. Sheet 13 - Please provide the Grading Easement shown and remove the word "temporary". Correct the overlapped labeling and provide missing BW elevations. Number: 405 Created: 8/8/2003 [2/1/05] Please see JR in Tech Services before resubmitting. The plans will not scan as is and Tech Services will not accept the mylars even if they are signed off. They will refuse them until they are scannable, even if it means the mylars have to be resigned by everyone again. Page 9 Number: 381 Created: 8/5/2003 [2/1/05] The lighter line weights are too light to scan. Shaded areas will not scan - please try a hatching pattern instead. [5/7/04] Repeat. See Appendix E6 for scanning requirements. Number: 394 Created: 8/8/2003 [2/1/05] [5/7/04] Shaded areas will not scan. Suggest using an outline or hatch pattern instead. Sheet 6 and 7 - See redlines. Number: 396 Created: 8/8/2003 [2/1/05] [5/7/04] Please see 7.7.2.A for grading requirements. Several areas exceed the 4:1 max requirement. Please provide a section through the wall on the west property line identifying the block dimensions, property line, etc. An additional easement may be requirement if you can't construct the wall entirely on the Redtail property. Provide BW elevations for the retaining wall at the southern entrance to the parking garage. Provide riprap at the end of the storm pipe or refer to the detail shown on sheet 42. Show limits of grading easement to the property owner just east of Pond C. See redlines for other comments. Sheet 9 - Please contact 5tormwater and Natural Resources regarding any grading shown greater than 4'.1. Offsite grading shown (discussed under "Letters of Intent"). See redlines for other comments. Number: 397 Created: 8/8/2003 [2/1/05] [5/7/04] Sheet 10 - Scanning issues. Areas exceeding the 4:1 max requirement must be corrected. Refer to detail on sheet 40 for the culvert under Cameron. General comment: Provide a complete design for the modular block wall where it exceeds 36". It can be designed by others, but it needs to be included in the utility plans before we can route for signatures. Make sure that the foundation for the picnic enclosure do not extend into the utility easement. Sheet 10 - Correct overlapping labeling. Offsite grading shown. Please provide location and dimensions of the retaining wall along Pond B so that they can lay this out in the field. Contact Doug Moore with Natural Resources regarding the height and appearance of the proposed retaining wall. Number: 399 Created: 8/8/2003 Page 8 8/6/3: This comment is mentioned elsewhere, so please forgive the duplication. We will need the property line shown on the various cross sections so that we can determine whether or not construction easements are necessary. Also, more cross sections along the various sections of walls are necessary. Some of the walls are pretty high and will need to be designed. Details will need to be provided even if "by others". This may be done during final compliance. 3/31/3: Your response is acknowledged. This item will remain open until the easements are received. 8/14/2: Third request: It does not appear that you will be able to construct these retaining walls without going onto neighboring property. Please provide construction easements as requested. 1/9/2: Repeat. 8/14/1: Provide detail, dimensions for the retaining walls on the north and west sides of the project. Will you need a construction easement to do the work? Number: 42 Created: 8/14/2001 [2/11/05] Site and landscape plans are still showing phasing. Are the utility plans phased as well? 8/14/01 Show all phasing of development and construction of all public improvements. 1/9/02 Repeat. Number: 236 Created: 8/16/2002 [2/11/05] Please label the slope on the reconfigured onsite sidewalk connection from College to the cul-de-sac. The grading around the sidewalk was illegible. Please make sure that the grades have been designed to accommodate the sidewalk. 8/14/2: The serpentine sidewalk along College is not acceptable. Please design to ADA guidelines and to our arterial cross section standard. The sidewalk should run parallel to College with a series of landings as outlined in the ADA guidelines. Number: 305 w/ Created: 3/31/2003 [2/1/05] Repeat comment. You will need a variance from the utilities in order to do this. If you wish to pursue this, please provide a letter explaining what and why as well as an exhibit that we can route around. The turnaround is 2 to 3 weeks. [5/7/04] Repeat comment. A retaining wall is now proposed in the 15' utility easement along College and is not allowed without the utility companies permission. (03/31/03) No buildings, footings, overhangs, or structures of any kind are allowed in utility easements OR the FCLWD's exclusive sanitary sewer easement. Several areas currently shown with buildings (residential and viewing shelter), footings, retaining walls, etc, in these easements. Page 7 Number: 515 Created: 2/14/2005 [2/14/05] The plat language needs to be updated to the latest version. Please email me at sjoy@fcgov.com and I'II send you the word document. Topic: Scanning Number: 506 Created: 2/14/2005 (2/14/05] See Appendix E6 for scanning requirements. Please meet with Tech Services before resubmitting the plans to make sure that the plans are acceptable. Topic: Site Plan Number: 379 Created: 8/5/2003 [2/2/05] (4/30/04] Repeat comment. The site plan is still not scannable and will not be approved until it is. (08/05/03) See Appendix E6 for scanning requirements. Number: 389 Created: 8/8/2003 [2/1/05] [5/7/04] Repeat. Please dimension all sidewalks and make sure that where attached, the width has been increased to at least 55. Sidewalks must be a minimum of 5.5' wide where attached. Number: 516 Created: 2/14/2005 [2/14/05] Project ID signs are not allowed in the UE (see the Cameron Drive entrance to the project). Topic: Utility Plans Number: 16 ��— Created: 8/14/2001 [2/11/05] 8/14/1: Provide a co y of the off -site drainage easement and Reception Number. 1/9/2: Repeat. . 1� 8/13/2: Thio-time Repeat. Please see attached and/or call me if you still don't understand what I'm asking for. 221-6605. 3/31/3: Your response is acknowledged. This item will remain open until the easement is received. Number: 32 Created: 8/14/2001 [2/1/05] The retaining wall design must be included in the utility plan set. [5/7/04] Keeping this comment open until resolved. This comment ties in with the new comment under General. Page 6 Number: 240 Created: 8/16/2002 [2/11/05] Please verify that the comment below has been properly addressed. From Technical Services: At the time of vacation of Cameron Drive, the owners of Lot 14 and 15 and Lots 9, 7, and 5 of the first filing become owners of their portion of the vacated street. Those owners and lien holders will then need to sign this plat as owners. 3/31/3: Question from Engineering: Have all the owners been shown on the plat? Number: 314 Created: 3/31/2003 [2/11/05][1/31/051 [5/7/04] Boundary and legal close. Boundary and legal do not match, see redlines. , i-V l �ZvC From Technical Services: Plat and legal close, typo redlined in legal. Number: 480 Created: 1/31/2005 [1/31/05] From Technical Services: Add curve data for easement at Conejos Road cul- de-sac. Number: 481 Created: 1/31/2005 (1/31/05] From Technical Services: Label 15' easement at the end of Fossil Blvd. Number: 482 Created: 1/31/2005 (1/31/05] From Technical Services: All blocks must be a closed figure w/dimensions designated with bold line type. Number: 483 Created: 1/31/2005 [1/31/05] From Technical Services: Easements need to be locatable. Number: 490 Created: 2/1/2005 [2/1/05] We've updated the plat language and I can email you that document if you send me an email at sjoy@fcgov.com Number: 491 Created: 2/1/2005 [2/1/05] The offsite sight distance easement needs to be dedicated to the city. Please see attached for the dedication statement that needs to be signed by the property owner to the north. Please submit a legal and exhibit for the offsite easement as well. Number: 492 Created: 2/1/2005 [2/1/05] Sheet 2, General Notes: Note #1- who maintains tract H? Notes 1 and 2 - who owns these tracts? Please say "owned and maintained by the Homeowners Association". Page 5 Number: 503 Created: 2/11/2005 [2/11/05] The public sidewalk along College needs to be 2/ wider where attached at the retaining IF the wall is allowed by the Utilities. Number: 517 Created: 2/14/2005 [2/14/05] The easements on the Plat, Site, Landscape and Utility plans need to match. Number: 518 Created: 2/15/2005 [2/15/05] A public access easement through the underground garage is required. Topic: Landscape Plan Number: 159 Created:l/7/2002 [2/2/05] [5/7/04] Repeat comment. 1/7/2: Reflect the changes asked for under the General, Site and Utility Plans sections. 3/31/3: Coordinate the various plan sets so that they present the same information. 8/6/3: The Site, Landscape, and Plat were resubmitted two weeks into the 3 week review and no longer match the utility plans. Please coordinate the plan sets so that they present the same information. Number: 312 Created: 3/31/2003 [2/2/05] [5/7/04] Repeat. See redlines. Number: 380 Created: 8/5/2003 [2/2/05] (05/05/04) Repeat comment. Please see Tech Services before resubmitting plans to make sure that plans are scannable. See Appendix E6 for scanning requirements. Number: 499 Created: 2/2/2005 [2/2/05] Remove the contours for legibility. Topic: Plat Number: 77 Created: 8/21/2001 [2/2/05] Repeat again. 8/21/1 Provide the Plat language, who is to own and maintain the different tracts. 1/9/1: Repeat. 8/14/2: Third request. 3/31/3: REPEAT COMMENT Page 4 Number: 402 Created: 8/8/2003 [2/1/05] Please provide copies of all offsite easements. Please label all offsite easements with the reception number on the plan sets. [5/7/04] Public Access Easement now shown, just need to provide us with a copy of the recorded document and label the plans with the reception number. Will not need to do this as a separate easement if you put a public access easement on the whole tract which you will need to do anyway or no one will have access to their homes or the open space areas. (08/08/03) Sheet 12 - Provide a Public Access Easement for the portion of the drive aisle shown on the lot to the south of bldg G and Garage 1. Number: 459 Created: 5/7/2004 [2/2/05] [5/7/04] The site and landscape plans show phasing. Are the utility plans being phased as well? If so, the utility plans will need to reflect that. Number: 460 Created: 5/7/2004 [2/1/05] [5/7/04] The various plan sets need to be coordinated so that they all present the same information. For example, some easements are shown on some plans but not on others. Suggest preparing an exhibit with all of the easements (both on and off site) shown so that everybody gets on the same page. Number: 461 Created: 5/7/2004 [2/1/05] [5/7/04] Please provide a copy of all of the recorded offsite easements by separate document along with their reception numbers. Label the reception numbers on the plans. Number: 462 Created: 5/7/2004 [2/1/05] [5/7/04] Handrails are required anywhere the retaining walls exceed 30". Number: 463 Created: 5/7/2004 [2/1/05] Permanent easements are required if the footings are not within your property boundaries. A design for all retaining walls are required on the utility plan set if over 2' and if in or effecting the public row. [5/7/04] Retaining walls are shown on the west and north side of the property. Please confirm the depth of the modular blocks and that you will not need a temporary or permenant easement from either the RR or the property owner from the north. Number: 484 Created: 2/1/2005 [2/1/05] The project title needs to match on the various plan sets. The utility plans call the project "Redtail Residential", the site, landscape and plat plan calls it "Redtail". Pick one name and call it that on everything. Page 3 03/31/3: The new site layout eliminates one of the sight distance triangles, however, the need for the other is still there. Please seethe horizontal control sheets for redlines. 8/14/2: Dedicate two sight distance triangles on the north side of Fossil Blvd. See detail 7-16. Number: 300 Created: 3/31/2003 [2/11/05] This comment was originally made on 3/31/03. I have included it again to show that we have continuously stated that no structures of any kind are allowed in the utility easements. It has been brought up several times over the years. All structures must be a minimum of 2' from the back of walk. No permanent Gtv structures (retaining walls, timbers, etc) are allowed in utility easements. rP��� Jugx�z°fx�� ' o � (✓�e� Number:301 Created: 3/31/2003 [2/11/05] Still waiting for the offsite dedications. 3/31/2003 A sight distance triangle must be provided from the first driveway located off the north side of Fossil Blvd. See redlines. Number: 309 Created: 3/31/2003 [2/1/05] [5/7/04] Repeat comment. 4�� CDOT will want to know whether or not you are increasing water into College Avenue. '�n Number: 323 Created: 4/2/2003 [2/11/05] The details provided with this last submittal are incomplete. They need to be included as part of the Utility Plans and show where the property lines are in relation to the wall placement (including the geogrid) at each of the locations that are in or impact public row, utility easement or infrastructure. Please provide more information on the retaining walls,, Will they have footings? How high are the ones in the natural areas? Wilk ;- ic-VE --/ & VC-1 L4VC t,I,t-% Number: 367 Created: 8/5/2003 [2/11/05][1/31/051 [5/7/04] Repeat comment. Please. Somebody needs to provide this. 8/6/3: Please provide legals and exhibits and put them on disk. We can start working on this now but the actual vacation will occur after public hearing. From Technical Services: Streets must be vacated by Council Action. Page 2 STAFF PROJECT REVIEW Ciri, of Fort Collin, Lagunitas RedtaiI, Inc. 02/15/20 55 ) c/o Jon Prouty �� 74 �y�� 3944 JFK Parkway, Suite 12E ��Cxk'j'-I . Fort Collins, CO. 80525 Staff has reviewed your submittal for REDTAIL RESIDENTIAL, FINAL9e p COMPLIANCE - TYPE I, LAND USE CODE, and we offer the following comments: ISSUES:n� Department: Current Planning Issue Contact: Steve Olt Topic: Overall Utility Plans Number: 502 Created: 2/8/2005 [2/8/05] A copy of the letter received from Terry Farrill of the Fort Collins - Loveland Water District & the South Fort Collins Sanitation District is attached to this comment letter. Please contact Terry, at 226-3104, ext. 14, if you need to talk with him. Department: Engineering Issue Contact: Susan Joy Topic: CDOT Permit Number: 512 Created: 2/14/2005 [2/14/05] CDOT Permit required for the work done in College. Please submit the application directly to Gloria at CDOT with an approved set of plans. Topic: 6tneral Number: 165 Created: 1/7/2002 [2/11/05] Still waiting for all offsite easements, leg4s1_rece tion numbers. An email was sent to North Star Design on am" y ou ining the- row vacation process and what needed to be turned in. Still waiting for all appropriate documents. See comment L e 226 as well as others. e ' 1/7/02 Easements provided are on the wrong form. Please see attached. , k),�; Number: 226 Created:8/16/2002 [2/11/05] Repeat comment - the offsite sight distance easement from the neighboring property owner still needs to be dedicated to the city. Please submit a legal description and an exhibit for our review and approval. Once we have reviewed and approved the paperwork, the developer needs to have the neighboring property owner sign our dedication statement granting the sight distance easement to the city. Page 1