Loading...
HomeMy WebLinkAboutREDTAIL RESIDENTIAL - FDP - 26-01A - CORRESPONDENCE - CITY STAFF (7)me Topic: Grading Number: 497 Created: 2/1 /2005 [2/1 /05] The variance request for slopes that are steeper than 3:1 should be OK, provided an acceptable method of stabilizing the slopes to provide erosion protection is specified. Topic: Landscape Plans Number: 501 Created: 2/3/2005 [2/3/05] The proposed storm sewers on Conejos Road, Camreon Drive and Fossil Boulevard do not have the minimum 10-foot horizontal separation from trees as shown on the landscape plans. Since the alignment of the storm sewers also interferes with the location of electrical facilities, it is suggested that the landscape architect attend the planned meeting between the engineer, stormwater and light and power staff, in order to determine how all the utilities can best be co -located with the required landscaping for the site. Topic: Pond C Outlet Structure Number: 419 Created: 8/13/2003 [2/2/05] Please provide a detail as to how that pond outflow pipe and spillway will be improved. Topic: Pond Water Surface Elevations Number: 496 Created: 2/1/2005 [2/1 /05] It seems that all existing pond water surface elevations are from readings or observations taken in the fall of 2000. Since this project will be built at least 5 years later an updated pond water surface elevations would be a good idea. Topic: Retaining Wall Details Number: 495 Created: 2/1 /2005 [2/1/05] Please provide a construction quality detail for all proposed retaining walls for this site that will be supporting roads and utilities. The submitted design does not clearly identify where this design will be applied. The landscape modular block wall design can be provided at time of building permit. Topic: Utility Plans Number: 498 Created: 2/1 /2005 [2/1/05] There are several locations (along Fossil Creek Boulevard, along Cameron Drive and along Conejos Drive) where the storm sewer alignment would interfere with potential Light and Power lines' locations. A meeting is suggested between the applicant, the engineer and our Light and Power staff to discuss potential adjustment to the alignments of either the storm or the electrical lines. Please maintain at least 10 feet of horizontal separation for storm sewers from electric lines. Page 2 Project Comments Sheet City of Fort Collins Selected Departments Department: Stormwater Utility Date: February 3, 2005 Project: REDTAIL RESIDENTIAL PDP - TYPE II AND FINAL PLAN All comments must be received by Cameron Gloss in Current Planning, Troy Jones in Current Planning, no later than the staff review meeting: January 26, 2005 Note - Please identify your redlines for future reference Issue Contact: Basil Hamdan Topic: Box Culvert Inlet Box Control Number: 421 Created: 8/13/2003 [2/2/05] Provide a detail for the wing walls and riprap boulders associated with Storm Line 9 similar to the one provided for Storm Line 8. [8/13/03] The Inlet Box control detail for Storm Line 9 needs to be clarified. Two different elevations are called out for the spillway , one on the detail, the other one on Line 9 profile. Please specify the size of boulders and the type (color) of boulders that are to be used in that detail. Topic: Details Number: 500 Created: 2/2/2005 [2/2/05] Please provide an outlet structure detail for the water quality pond at the notheast of the site. Please number this pond for easier reference. Topic: Easements Number: 494 Created: 2/1 /2005 [2/1/05] Please provide a copy of the proposed grading drainage easements by separate document on the north and northeast side of the site, notably for the grading on the existing lots on Coronado Drive, the grading to the south of Lot 1-C, the grading on the existing lot to the east of Pond C, the grading on the property to the north and the proposed outfall pipe and riprap downstream of the water quality pond. A copy of the easement exhibit that was prepared would also be appreciated. Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other_ Utility Redline Utility Landscape Page 1 �Stev_e Qlt Re: Email Page 1 From: Basil Hamdan To: northstar@gwest.net; Tricia Kroetch Date: 02/03/2005 11:23:41 AM Subject: Re: Email Tricia, Please find attached an electronic copy of my comments regarding Redtail. I am emailing you these so you have an electronic version and this way you can get them sooner. Basil >>> "Tricia Kroetch" <Tricia@NorthStarDesignlnc.com> 02/01/05 12:01 PM >>> We appear to be having severe email problems. We apparently are able to send emails but not receive them. This will not be fixed until Thursday. In the meantime, please send all emails to northstar@gwest.net Thanks, Patricia Kroetch North Star Design, Inc. 970-686-6939 ext.16 CC: Steve Olt; Susan Joy