Loading...
HomeMy WebLinkAboutREDTAIL RESIDENTIAL - FDP - 26-01A - CORRESPONDENCE - REVISIONS396 — In the few areas where slopes exceed 4:1, a mat system of initiating and stabilizing vegetation will be used, similar to the system used by the Colorado Department of Transportation, and as we have coordinated with Stormwater. We look forward to expeditiously concluding final compliance, mylars, Development Agreement and recording. Thank you for your assistance. Sincerely, W Jo routy, President JP/ksr Enclosure 3944 JFK Parkway, 12E, Fort Collins, CO 80525 • (970) 226-5000 • Fax (970) 226-5125 January 11, 2005 Cameron Gloss, Director City of Fort Collins — Current Planning Department 281 North College Fort Collins, CO 80522 Re: Redtail - Response to May 10, 2004 Comments Dear Cameron: The May 10, 2004 comments have been complied with or satisfied. However, the following additional response or explanation is provided: Engineering — General: 305 — Utility company variance will be obtained to permit retaining wall in part of the sewer easement along College. 461 — A copy of all off -site easements is enclosed with reception numbers indicated for those recorded. Recording is in process for the rest. 463 — Retaining walls will not require permanent easements. We have obtained a temporary construction easement to build the retaining wall to the north, however a temporary construction easement will not be necessary at the west. Engineering — Plat: 367 — Legals and exhibits will be provided on disk so the vacation process can be initiated (for the right-of-ways and easements relating to the portion of the Cameron Park plat being vacated). Engineering — Utility Plans: 32 — As agreed, walls relating to structural integrity of roads have been designed. Other walls shall be designed prior. to issuance of building permits for same. 3944 JFK Parkway, 12E, Fort Collins, CO 80525 • (970) 226-5000 • Fax (970) 226-5125