HomeMy WebLinkAboutREDTAIL RESIDENTIAL - PDP - 26-01 - SUBMITTAL DOCUMENTS - ROUND 2 - GEOTECHNICAL (SOILS) REPORT (3)Ah
LOG OF BORING NO. PZ-5
Page 1 of 1
CLIENT
ARCHITECT / ENGINEER
Lagunitas Companies
I
SITE Cameron Park Second Filing
PROJECT
Fort Collins, Colorado
Redtail Mixed Use Development
SAMPLES
TESTS
Op
J
O
O a
DESCRIPTION
07
i
'L
U
_
_
Cn
W
w
>
Zco
Z
4:w
H
Z
U_
ZZ
C
s
co
d
OU
H O
O
c)
Approx. Surface Elev.: 4989 ft
o
Z)
Z
c
m n
o
0 0.
Le)
6" TOPSOIL 4988.5
WEATHERED SANDSTONE
NTan,
gray, moist, poorly cemented
2 4987
SANDSTONE
Tan, gray, moist, cemented to well
cemented
5
i
10
".
12 4977
BOTTOM OF BORING
10-feet of 4-inch diameter PVC casing
installed
approximate Top of Casing Elevation =
4989.5
The stratification lines represent the approximate boundary lines
between soil and rock types: in -situ, the transition may be gradual.
WATER LEVEL OBSERVATIONS, ft
Irerraccin
BORING STARTED 7-8-02
DRY WD s 6 AB
BORING COMPLETED 7
IWL
WL
2 s
RIG CME 75
1 FOREMAN ASR
WL
Water Level Checked on 7/17/2002
APPROVED DAR
I JOB # 20015260
LOG OF BORING NO. PZ-4
Page 1 of 1
CLIENT
ARCHITECT / ENGINEER
Lagunitas Companies
SITE Cameron Park Second Filing
PROJECT
Fort Collins, Colorado
L Redtail Mixed Use Development
SAMPLES
TESTS
U
DESCRIPTION
p
>
F
Lc
z
_
Cn
w
>
zco
[cw
z
zz
Z
o
W-z
>
o
LY
L)
Approx. Surface Elev.: 4989 ft
w
o
m
D
z
}
t-
of
d�
U) m
a0
3 5
C� u
o a,
z�
5 cn
0.5 6" TOPSOIL 4988.5'
SILTY CLAYEY SAND
Brown, tan, moist, medium dense
2 4987
SANDSTONE
Tan, gray, moist, cemented to well
cemented
5
10
1
14 4975
BOTTOM OF BORING
' 10-feet of 4-inch diameter PVC casing
installed
approximate Top of Casing Elevation =
4989.5
The stratification lines represent the approximate boundary lines
between soil and rock types: in -situ, the transition may be gradual.
WATER LEVEL OBSERVATIONS, ft
Irerracon
BORING STARTED 7-8-02
WL
`�- DRY WD
113 AB
BORING COMPLETED 7-8-02
WL
2
RIG CME-55
FOREMAN ASR
WL
lWater Level Checked on 7/17/2002
APPROVED DAR I
JOB # 20015260
LOG OF BORING NO. PZ-3
Page 1 of 1
CLIENT
ARCHITECT / ENGINEER
Lagunitas Companies
SITE Cameron Park Second Filing
PROJECT
Fort Collins, Colorado
Redtail Mixed Use Development
SAMPLES
TESTS
U'
DESCRIPTION
p
c
z
w
W
z
a-
F
rn
m
W
o
?�
wF
Z
Z0
OW
w
(
r
w
M�
¢O
Ct
Z1-
0
Approx. Surface Elev.: 4962 ft
o
Z)
z
of
V) m
3: O
o r-
Z) co
0.5 6" TOPSOIL 4961.5
1 WEATHERED SANDSTONE 4961
Tan, ra moist poorly cemented
I
SANDSTONE
Tan, gray, moist, cemented to well
cemented
s
s
10
14 4948
BOTTOM OF BORING
10-feet of 4-inch diameter PVC casing
installed
approximate Top of Casing Elevation =
4962.5
The stratification lines represent the approximate boundary lines
between soil and rock types: in -situ, the transition may be gradual.
WATER LEVEL OBSERVATIONS, ft
irerracon
BORING STARTED 7-8-02
WL ISZ DRY WD
T 9.5 AB
BORING COMPLETED 7-8-02
WL
RIG CME-75 FOREMAN ASR
WL Water Level Checked on 7/17/2002
APPROVED DAR I JOB # 20015260
LOG OF BORING NO. PZ-2
Page 1 of 1
CLIENT
ARCHITECT / ENGINEER
Lagunitas Companies
SITE Cameron Park Second Filing
PROJECT
Fort Collins, Colorado
Redtail Mixed Use Development
SAMPLES
TESTS
DESCRIPTION
n
>
o a
LU
_
w
Of
W
z
Z
U~
a
_
a
L
>
Q
zUn
�L
�z
>
zZ
OUX
0
Approx. Surface Elev.: 4964.5 ft
o
z
d
of
Fp
(n m
o o.
Z) ai
=: `.
0.5 6" TOPSOIL 4964
WEATHERED SANDSTONE
Tan, gray, moist, poorly cemented
2 4962.5
SANDSTONE
Tan, gray, moist, cemented to well
cemented
5
10
14 4950.5
BOTTOM OF BORING
` 10-feet of 4-inch diameter PVC casing
installed
approximate Top of Casing Elevation =
4965.0
The stratification lines represent the approximate boundary lines
between soil and rock types: in -situ, the transition may be gradual.
WATER LEVEL OBSERVATIONS, ft
Irerracon
BORING STARTED 7-8-02
WL T DRY WD
DRY AB
ING COME
BORMPLETD7ASR
IT-7
Is
RIG 75EFFOREMAN
WL lWater Level Checked on 7/17/2002
APPROVED DAR I JOB # 20015260
Ah
LOG OF BORING NO. PZ-1
Page 1 of 1
CLIENT
ARCHITECT / ENGINEER
Lagunitas Companies
SITE Cameron Park Second Filing
PROJECT
Fort Collins, Colorado
Redtail Mixed Use Development
SAMPLES
TESTS
DESCRIPTION
chi
>
r5
o Na
_
Q
d
U
co
c
W
O
Z3
�FZ
ow
Approx. Surface Elev.: 4965.0 ft
o
Z)
z
}
of
(3 m
3 0
}
0 0-
Z) Cn
0.5 6" TOPSOIL 4964.5
SILTY CLAYEY SAND
Brown, tan, moist, medium dense
5
6 4959
SANDY LEAN CLAY
Brown, tan, moist, stiff
9 4956
10
9.5 WEATHERED SANDSTONE 4955.5
Tan, aray, moist poorly cemented
SANDSTONE
Tan, gray, moist, cemented to well
cemented
14 4951
BOTTOM OF BORING
10-feet of 4-inch diameter PVC casing
installed
approximate Top of Casing Elevation =
4965.5
The stratification lines represent the approximate boundary lines
between soil and rack types: in -situ, the transition may be gradual.
WATER LEVEL OBSERVATIONS, ft
1rerracon
BORING STARTED 7-8-02
WL
2 DRY WD
1 DRY AB
CCME 7ASR
WL
GR1NG
RIG 75EOMPLETDOREMAN
WL
lWater Level Checked on 7/1712002
APPROVED DAR I
JOB # 20015260
r
1
a
e
� I a e• . , R7 1e1(L \ \� � - !I r I I I I I I i I f � I� � I
J
6 XC • 6 XC�I I I I 1 II 11
24' l Fmnmrte Ome I 2w rD,.
7 i To Ise
' 9 1 1 5 I I �,I 11I I I I I I` "I it Icl I I I6 To Be All" B ®N0.1 NO.4 7 4
NO.1 B NO.6 NO.7
A ® TO Be s ��
F 1�11�6 I��IIC C� � I iTo�
0.2 &(N ILL € <
we r wys.,.
' NOA A a Tot $ N
Derema, Faw NO.3 E ®5 N0.8 NO.9 01
U
o�u®m, D ®e _N
— L w
Tmrepert Gran
COinCbm � N0.5 ® 1 J-awe rrWcc vuoe
FOSSIL CREEK FOSSIL CREEK
OFFICE OFFICE
F SSIL ORE N
/ OFFICE
e
LEGEND
0.11 0 \ REEK OFFICE PARK CORONADO COURT ®APPROXIMATE TEST BORING LOCATION assll OR ZONED C
� ®TB NO. 2 NOT DRILIFD DUE TO
o OFFICE �— PREVIOU5LY EXISTING TE5T BORINGS
DUenban raw -
_ TB N05. 14 2 DRILLED IN 1995,
MC '-•"` I CAMERON 3 PROJECT NO. 20955185
' 12 2 OS OFFICE
CREEK O
OFFICE I OFFICE w TEST BORINGS FOR
5 FOSSIL CREE W
12 O 1 OFFICE \ pS51L CREEK ( I ` I I ® SUPPLEMENTAL EXPLORATION
k. OFFICE
Ct
TIMER COU14TY I e _ CAM&jON ORIW
ZCNED FAi '
a
Aad
VACANT
Q' S ,e rnyte �
iE kT ap2d ri yp�
9 JL
H 0 e c CAMERON `� \
OFFICE
rR * •uar TBM=RIM RON CAMERON / CAMERON
' M � IS V�a4, MM oLe OFFICE / -�CAMERON .PARK OFFICE PARK OFFCE
d 2 ^-r 0.14 9 u / ERON
15 OFFICE � \
XC N AMERI,--,/ \ 9aAt� OSSM CREW
PARKTAY
4 OFFICE
3 I_ - I
20 Nphalt Onw / G0A FIGURE 1 : 51TE PLAN
/ EF
REDTAIL MIXED USE DEVELOPMENT
N 1 D�aaen r°"° I ' NORTH OF FOSSIL CREEK OFFICE PARK 4 WEST OF CAMERON PARK OFFICE
I N .1 N .1 r� N N .2 ` / FORT COWNS, COLORADO
Fro1eet Mngr: DAR Proms No. 200152GO
a r rye. % Bha F th O C1.3 ECAERON
EI I I Designed BY. DAR r` ra®n Snk: I ' = 100r
\ Cna,echar
CITY of FORT cowNs DAR 301 N. Howes Street Dab 7/ 18/02
LewS1INc WETLANDS REOTNLTNATURAL AREA l I — — �"� — —I — � ldd � DAR Fort Collins, Colorado 60521 Drawn By: SDG
Rle
DIAGRAM IS FOR GENERAL LOCATION ONLY,
Name: 52GOFIG I fi9as No. I
AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES
Supplemental Geotechnical Engineering Report
Lagunitas Companies — Redtail Mixed Use Development
Fort Collins, Colorado
Project No. 20015260
Page 4
Terracon
The analysis and recommendations presented in this report are based upon the data obtained from the
borings performed at the indicated locations and from other information discussed in this report. This report
does not reflect variations that may occur between borings, across the site, or due to the modifying effects
of weather. The nature and extent of such variations may not become evident until during or after
construction. If variations appear, we should be immediately notified so that further evaluation and
supplemental recommendations can be provided.
The scope of services for this project does not include either specifically or by implication any environmental
assessment of the site or identification of contaminated or hazardous materials or conditions. If the owner
is concerned about the potential for such contamination, other studies should be undertaken.
This report has been prepared for the exclusive use of our client for specific application to the project
discussed and has been prepared in accordance with generally accepted geotechnical engineering
practices. No warranties, either express or implied, are intended or made. Site safety, excavation support,
and dewatering requirements are the responsibility of others. In the event that changes in the nature,
design, or location of the project as outlined in this report are planned, the conclusions and
recommendations contained in this report shall not be considered valid unless Terracon reviews the
changes and either verifies or modifies the conclusions of this report in writing.
We appreciate the opportunity to be of service to you on this phase of your project. If you have any questions
concerning this report, or if we may be of further service to you, please do not hesitate to contact us.
Sincerely,
TERRACON~�
David A. Richer.P.E.
Geotechnical Erig veer/Department Manager
Enclosures: Sit-e-'p igure No. 1
Schematic from JR Engineering
Log of Borings/Piezometer- Nos. 1 through 5
Copies: Addressee (3)
JR Engineering (2): Mr. John E. Tufte, P.E.
Supplemental Geotechnical Engineering Report
Lagunitas Companies — Redtail Mixed Use Development
Fort Collins, Colorado
Project No. 20015260
Page 3
Terracon
embankment fill materials should consist of relatively homogeneous material which is placed and compacted
in uniform lifts, moisture conditioned to plus or minus 2 percent of optimum moisture content and mechanically
compacted to at least 95 percent of Standard Proctor Density ASTM D698. It is our understanding the
embankment slopes and/or surface area will not placed beneath any proposed structures, however the water
district may be required to access the alignment for future maintenance purposes. Therefore, for stability
purposes the material should be properly placed and compacted under typical structurally loaded conditions. It
is also recommended the upper 6 to 8-inches eonsist of an aggregate base course material meeting CDOT
Class 5 or 6 criteria, also placed and compacted to 95 percent of its Standard Proctor Density ASTM D698.
The proposed embankments should be constructed on minimum slopes of 3:1 (horizontal to vertical) on both
the upstream and downstream faces. After determining the type and/or borrow source material which is to
used for construction of the slopes, and the design loads for the maintenance road portion, consideration
should be given to running a slope stability analysis for the completed cross-section. Based on our
understanding of the information presented to us via facsimile from JR Engineering, and assuming either on -
site soils and/or approved imported material will be used to construct the embankments the slopes appear to
be relatively stable.
The roadway/street in -fill embankments, situated between the middle and southern detention ponds, as
depicted on the enclosed schematic, should also be constructed using on -site soils and approved imported
fill materials placed in accordance to the above mentioned recommendations. Additional pavement
recommendations for this portion of the site have been provided in the original geotechnical engineering
report on Page 8. It is our understanding the internal roadways are non jurisdictional City of Fort Collins
roadways. Therefore, the recommendations for "main -traffic" corridors should apply to this section. If
during final review this roadway is to be constructed in accordance to City of Fort Collins jurisdictional
standards, a supplemental pavement evaluation will be required.
General "earthwork" recommendations for the project pertaining to site and subgrade preparation, imported
materials, placement and compaction criteria and excavation construction procedures are included in
original report under the "Earthwork" section on page 11 through 13.
Slope Protection
The slopes of these two embankments should be protected from wave action, wind erosion and general
weathering. It is recommended the face of the embankments be riprapped, consisting of a durable rock
adequately sized. The riprap should be properly bedded with gravel or separated from the embankment by
filter fabric to minimize the washing out of fines below the riprap. The top of the embankment slope should be
provided with a minimum of 6 inches of gravel base course surfacing for future truck access.
GENERAL COMMENTS
Terracon should be retained to review the final design plans and specifications so comments can be made
regarding interpretation and implementation of our geotechnical recommendations in the design and
specifications. Terracon also should be retained to provide testing and observation during excavation,
grading, foundation and construction phases of the project.
Supplemental Geotechnical Engineering Report
Lagunitas Companies - Redtail Mixed Use Development
Fort Collins, Colorado
Project No. 20015260
Page 2
SOIL CONDITIONS
Terracon
The subsurface soils encountered at the site within the supplemental test borings/piezometers generally
consisted of an approximate 6-inch layer of silty topsoil underlain by silty, clayey sand, sandy lean clay and/or
weathered sandstone bedrock extending to the competent sandstone below. Weathered sandstone bedrock
was encountered beneath the topsoil in Test Boring/Piezometer Nos. 2 and 3 and extended to the competent
bedrock below. In the remaining test borings/piezometers sandstone bedrock was encountered at
approximate depths of 2 to 9-feet below existing site grades and in all borings extended to depths explored,
15-feet.
The stratification boundaries shown on the enclosed boring logs represent the approximate locations of
changes in soil types; in -situ, the transition of materials may be gradual. The soil profile for this study is
generally consistent with the soil and bedrock conditions presented in our previous subsurface exploration
report.
GROUNDWATER CONDITIONS
Groundwater was encountered in the 3 of the most recently drilled test borings/piezometers at approximate
depths of 6 to 13-feet below existing site grades or approximate elevations of 4952.5 to 4983.0, when checked
9 days after the drilling operations. The table below provides the approximate depth and elevation of
groundwater encountered in each of the recently drilled test borings, including the existing water level
elevations for the adjacent ponds.
Test
Boring/Piezometer
No.. and/or Pond
Approximate Depth to
Groundwater, Ft.
Approxlmate Ground.
Surface Elevation
` Approximate
Groundwater Elevation
1
Dry to 15-feet
4965.0
Deeper than 4951.0
2
Dry to 15-feet
4964.5
Deeper than 4950.5
3
9.5
4962.0
4952.5
4
13.0
4989.0
4976.0
5
6.0
4989.0
4983.0
North Pond
-
-
4985.5
South Pond
-
—
4955.5
These observations represent only the current groundwater conditions, and may not be indicative of other
times or at other locations. Groundwater levels can be expected to fluctuate with varying seasonal and
weather conditions, as well as volume of each pond. Based on the recent groundwater measurements
obtained in each test boring/piezometer and water surface elevations of the existing detention ponds, it
appears groundwater in the nearby borings is below the two ponds. Actual conditions may vary.
Earthwork Embankment Recommendations for Waterline and Street Fill
The civil engineering consultants for the project, JR Engineering of Fort Collins, Colorado, have requested
Terracon to provide geotechnical engineering recommendations for earthen embankments for a waterline to
be installed between the two most northern detention ponds as depicted in the attached schematic sent to
Terracon via facsimile on July 23, 2002, Section A, and for a street "in -fill' at Section B. The waterline
6uIy_26—_200
Lagunitas Companies
3944 JFK Parkway
Fort Collins, Colorado 80525
Attn: Mr. Jon Prouty
o � Our
JUL 2 9 2002 U
Irerracon
301 N. Howes • P.O. Box 503
Fort Collins, Colorado 80521-0503
(970) 484-0359 Fax: (970) 484-0454
Re: Supplemental Geotechnical Engineering Report
Redtail Mixed Use Development — Cameron Park 2nd Filing
Southern Detention Pond and Waterline Between 2 Northern Ponds
Fort Collins, Colorado
Terracon Project No. 20015260
Terracon has completed a supplemental geotechnical engineering exploration for the above -referenced project
located west of South College Avenue, south of Fairway Lane, and east of the Burlington Northern Railroad
tracks in south Fort Collins, Colorado. The purpose of this additional exploration was to determine the soil,
bedrock and groundwater profiles adjacent to the southern most detention pond to assist the wetlands
consultant in his evaluation of the site, determine the profile adjacent to the northern most detention pond to
assist the civil engineering design firm in their evaluation of the possibility of installing a waterline in this area
and to provide earthwork recommendations for proposed waterline and street "in -fill" embankments. This
study was conducted in general accordance with our Proposal No. D2001397B dated July 3, 2002.
PREVIOUS EXPLORATIONS
Terracon conducted a comprehensive geotechnical engineering exploration for the site in December of 2001,
which consisted of drilling, logging, and sampling 19 test borings located throughout the site and providing
recommendations for foundations, floor slabs, lateral earth pressures, pavement and general earthwork, based
on the soil, bedrock and groundwater profiles and laboratory test results. For further information and findings
thereof, please refer to our "Geotechnical Engineering Report" for the Redtail Development dated December
20, 2001, Project No. 20015260.
FIELD EXPLORATIONS
The supplemental site exploration, conducted on July 8, 2002, consisted of drilling 5 additional test borings
to approximate depths 15-feet below existing site grades at locations as shown on the enclosed Site Plan,
Figure No. 1, in an effort to provide soil, bedrock and groundwater profiles adjacent to the existing detention
ponds, as previously mentioned. At the conclusion of the drilling operations, a 3-inch diameter PVC casing
was installed in each boring for purposes of future groundwater monitoring.
The additional test borings were advanced with a truck -mounted drilling rig, utilizing 4-inch diameter solid stem
augers. The borings were located in the field by pacing from property lines and/or existing site features.
Ground surface elevations at each additional test boring/piezometer were obtained by use of an engineers
level and referenced to a benchmark consisting of the rim elevation of an existing Sewer Manhole as shown on
the enclosed Site Plan, Figure No. 1. The accuracy of boring locations and elevations should only be
assumed to the level implied by the methods used.
Lithologic logs of each additional test boring/piezometer were recorded by the engineering geologist during the
drilling operations. Groundwater measurements were made in each boring at the time of site exploration and
when checked on July 17, 2002.
Arizona ■ Arkansas ■ California ■ Colorado ■ Georgia ■ Idaho ■ Illinois ■ Iowa ■ Kansas ■ Kentucky ■ Minnesota ■ Missouri
Montana ■ Nebraska ■ Nevada ■ New Mexico ■ Oklahoma ■ Tennessee ■ Texas ■ Utah \ Wisconsin ■ Wyoming
Consulting Engineers & Scientists Since 1965
www.terracon.com