Loading...
HomeMy WebLinkAboutREDTAIL RESIDENTIAL - PDP - 26-01 - CORRESPONDENCE - SITE, LANDSCAPE & ELEVATIONS PLANSLagunitas Companies 3944 JFK Parkway, Fort Collins, CO 80525 970-226-5000•fax 970-226-5125 To: Doug Moore From: Jon Prouty _ Date: September 16, 2002 Re: 50 Buffer for Naturalized Storm Drainage Channels / Detention Ponds and / or Wetlands Less than 1/3 Acre in Size In reanalyzing the average setback again based on the latest site plan (7/24/02) we measured the setback distance from buildings or parking lots to the wetlands or detention ponds. Where there are wetlands which will be displaced and mitigated, measurements were taken to the new wetlands or detention ponds. The method used to achieve an accurate average buffer setback was to take a measurement every 50 linear feet of development (buildings or parking lot) fronting on such wetlands or detention ponds. Using this methodology, we arrived at an average naturalized detention ponds or wetlands setback of 62.58'. See attached plan documenting the foregoing. JP/hlb Enclosure FARedtai1\FC CorrespondenceVAoore.WetlandsBuffer.091602.doc R/D: 9/16/02 Page 1 of 1 P/D: 9/16/02