HomeMy WebLinkAboutREDTAIL RESIDENTIAL - PDP - 26-01 - CORRESPONDENCE - SITE, LANDSCAPE & ELEVATIONS PLANSLagunitas Companies
3944 JFK Parkway, Fort Collins, CO 80525
970-226-5000•fax 970-226-5125
To: Doug Moore
From: Jon Prouty _
Date: September 16, 2002
Re: 50 Buffer for Naturalized Storm Drainage Channels / Detention Ponds
and / or Wetlands Less than 1/3 Acre in Size
In reanalyzing the average setback again based on the latest site plan (7/24/02) we
measured the setback distance from buildings or parking lots to the wetlands or
detention ponds. Where there are wetlands which will be displaced and mitigated,
measurements were taken to the new wetlands or detention ponds.
The method used to achieve an accurate average buffer setback was to take a
measurement every 50 linear feet of development (buildings or parking lot) fronting on
such wetlands or detention ponds.
Using this methodology, we arrived at an average naturalized detention ponds or
wetlands setback of 62.58'.
See attached plan documenting the foregoing.
JP/hlb
Enclosure
FARedtai1\FC CorrespondenceVAoore.WetlandsBuffer.091602.doc R/D: 9/16/02
Page 1 of 1 P/D: 9/16/02