HomeMy WebLinkAboutREDTAIL RESIDENTIAL - PDP - 26-01 - CORRESPONDENCE - TRANSPORTATION ISSUE (3)r APR-15-2002 MON 11:37 AM T"4NSPORTATION SERVICES FAX NO., 9'"''216239 P. 02
Monday, April 16, 200210:27 AM Lagunhas (970) 226-5125 p.02
11- East — west public sidewalk connectivity along the new section of Fossil
Boulevard providing pedestrian connectivity to College sidewalks and existing
Fossil Boulevard sidewalks proceeding north.
12. Public sidewalks along Redtail Court and the new section of Cameron Drive
providing pedestrian connectivity to and from College sidewalk to the east and
Coronado and Fossil Boulevard sidewalks both to the north.
Accordingly, we will not be submitting any further TIS report updates except for what is
necessary for CDOT.
Thank you.
JPmlb
�► 'APR-15-2002 MON 11:37 AM Tn9NSPORTATION SERVICES FAX NO. 9'"?216239 P. 01
Monday, April 15, 200210:27 AM Lagundas (970) 228-5125 P.01
FAX
Lagunitas Companies
3944 JFK Parkway. Fort Collins, CO 80525
970-2265000 . fax 970-2265125
To: Mark Jackson, ave Stringer
From: Jon Prouty
Date: � ril-l5,-2002�
Re: Redtail / TIS Reports
As you know, we have done two TIS reports and furthermore have agreed with the City
to provide the following right-of-way and pedestrian connections:
1. New public street Redtall Court connecting to Cameron Drive public street
connection, providing access in / out of the project at South College / Cameron
Drive signalized intersection.
2. Extension of Fossil Boulevard southeast and east to connect with College (right
in right out).
3. Fossil Boulevard also providing Hilltop Farm connectivity via Fairway Drive to the
South College — Fairway signalized (planned) intersection.
4. Second point of emergency access from College across median immediately
opposite and to the east of Coronado Court (subject to CDOT approval)
5. We have committed to and will make every effort to negotiate with the building
and parking lot owner on Lot 15 to allow emergency access through his private
parking lot.
6. North — south .College Avenue public sidewalk connection
7. North — south Coronado Court — Fossil Boulevard sidewalk connection
8. North — south Cameron Drive — Coronado Court cul-de-sac — Fossil Boulevard
sidewalk connection
9. Easement at south of project for connectivity of internal path system to Fossil
Creek bike / ped path (planned).
10. Easement at west for connection of project path system to Mason Street Corridor
bike / ped path (planned).