Loading...
HomeMy WebLinkAboutREDTAIL RESIDENTIAL - PDP - 26-01 - CORRESPONDENCE - TRANSPORTATION ISSUE (3)r APR-15-2002 MON 11:37 AM T"4NSPORTATION SERVICES FAX NO., 9'"''216239 P. 02 Monday, April 16, 200210:27 AM Lagunhas (970) 226-5125 p.02 11- East — west public sidewalk connectivity along the new section of Fossil Boulevard providing pedestrian connectivity to College sidewalks and existing Fossil Boulevard sidewalks proceeding north. 12. Public sidewalks along Redtail Court and the new section of Cameron Drive providing pedestrian connectivity to and from College sidewalk to the east and Coronado and Fossil Boulevard sidewalks both to the north. Accordingly, we will not be submitting any further TIS report updates except for what is necessary for CDOT. Thank you. JPmlb �► 'APR-15-2002 MON 11:37 AM Tn9NSPORTATION SERVICES FAX NO. 9'"?216239 P. 01 Monday, April 15, 200210:27 AM Lagundas (970) 228-5125 P.01 FAX Lagunitas Companies 3944 JFK Parkway. Fort Collins, CO 80525 970-2265000 . fax 970-2265125 To: Mark Jackson, ave Stringer From: Jon Prouty Date: � ril-l5,-2002� Re: Redtail / TIS Reports As you know, we have done two TIS reports and furthermore have agreed with the City to provide the following right-of-way and pedestrian connections: 1. New public street Redtall Court connecting to Cameron Drive public street connection, providing access in / out of the project at South College / Cameron Drive signalized intersection. 2. Extension of Fossil Boulevard southeast and east to connect with College (right in right out). 3. Fossil Boulevard also providing Hilltop Farm connectivity via Fairway Drive to the South College — Fairway signalized (planned) intersection. 4. Second point of emergency access from College across median immediately opposite and to the east of Coronado Court (subject to CDOT approval) 5. We have committed to and will make every effort to negotiate with the building and parking lot owner on Lot 15 to allow emergency access through his private parking lot. 6. North — south .College Avenue public sidewalk connection 7. North — south Coronado Court — Fossil Boulevard sidewalk connection 8. North — south Cameron Drive — Coronado Court cul-de-sac — Fossil Boulevard sidewalk connection 9. Easement at south of project for connectivity of internal path system to Fossil Creek bike / ped path (planned). 10. Easement at west for connection of project path system to Mason Street Corridor bike / ped path (planned).