Loading...
HomeMy WebLinkAboutREDTAIL RESIDENTIAL - PDP - 26-01 - SUBMITTAL DOCUMENTS - ROUND 2 - MODIFICATION REQUEST (5)� • r hardscape, pedestrian, bicycle and vehicle uses; interesting building elevations; and aesthetic building frontages. 7. Providing sense of community and quality of life, which are inherent in and flow from the essential elements of the project: a) three small residential communities; b) each comprised of residential buildings surrounding central plazas and courtyards; and c) all creatively merging landscape, hardscape, pedestrian and vehicle uses in a Way which enhances aesthetics, safety and quality of life. We respectfully ask for your favorable consideration and approval of our requested modifications. Thank you. Sincere) , Pr uty esident JP/hlb 2 1. The granting of the modification would not be detrimental to the public good - the public residents and guests will still know where to park; 2. Nor will it impair the intent and purposes of the LUC — but rather it will contribute to LUC intents and purposes relating to aesthetics, good project design, quality of neighborhood, and de -emphasis / softening of parking areas; 3. Our proposal as submitted will advance the public interests and the purposes of the standard equally well or better than a plan that complies with the standard — when the scored lines fill with dirt they become permanently dark and defined in contrast to paint which wears off every year or so; 4. And the granting of the modification would result in substantially addressing important community needs — proximity to work places, internal pedestrian connectivity, external pedestrian connectivity, excellence in design and construction, innovative architecture and planning, and neighborhoods which provide sense of community and enhance quality of life, as is more fully described below. Furthermore with regard to all of the foregoing modification requests, our plan achieves LUC purposes and addresses community needs by: 1. Fulfilling a community need for housing at more affordable prices with our townhouse community in the north portion of our project. 2. Providing housing immediately adjacent to offices and nearby to many other workplaces. 3. Providing internal pedestrian connectivity and permeability by means of the central courtyard designs integrating landscape, hardscape, pedestrian, bicycle and vehicle uses. 4. Providing pedestrian connectivity between the residential neighborhoods, and the existing offices to the east by means of Cameron Drive, Redtail Court, Fossil Boulevard, Frontage Road, Coronado Court, public drives, and public and private sidewalks. Furthermore, future connection of this project to the Fossil Creek pedestrian / bike path as well as to the Mason Street Transportation Corridor is proposed. Also, it provides connectivity via public transit and public streets to schools, parks, library, retail, office and employers. 5. Promoting excellence in design and construction of planned residential neighborhoods, buildings, outdoor spaces, and streetscapes. 6. Incorporating innovative architecture and planning concepts including front and back roof step-down design; central courtyards concept merging landscape, 5 3. No connectivity to the north because any such connectivity would require major condemnation of Spradley-Barr Ford and Walmart. 4. College Avenue to the east. Although we had a second point of connectivity to College Avenue originally planned as the entrance to the Redtail townhouse neighborhood (our first point of connection to College is east from the project on Cameron to the intersection of Cameron and College), this second point of connection was closed because of state highway requirements and safety considerations. The construction of the Redtail project will, however, provide a new, and safe, connection to College Avenue by means of Redtail Court north to Fossil Boulevard north to Fairway and east to College. Accordingly and in conclusion, as has been described above, it is infeasible to achieve two more arterial street connections from this project due to the unusual constraints and limitations described above. Modification Request #3 — Fire Lane Identification and Parking Stall Demarcation It is our strongest wish that the courtyard portions of the residential project be successful as an aesthetic pedestrian -friendly area integrating landscape, hardscape, pedestrian, bicycle and vehicle uses. In addition to other design features, we feel it is imperative to not introduce ugly, white painted parking stall lines into this scored colored concrete courtyard area and the environment we are creating. Zoning has recently approved alternative parking space demarcation by means of three scored lines for other projects and we request the same here. Also we do not want red fire lane lines to be painted in the residential courtyards. We believe they are unsightly and unnecessary. The fire lane route will be just as apparent with signage but without the red curbs. The fact that the fire lane is not for parking is also naturally apparent, because the fire lane -travel lane will be a straight -through route on black asphalt in contrast to scored concrete parking -courtyard areas. This modification request is in reference to LUC 3.6.6(E), which states: (E) Parking Control. Approved "No parking - Fire Lane" signs shall be provided along curbs where parking could obstruct the minimum width and turning radius. Curbs in these areas shall be painted red. Accordingly we respectfully request approval to allow use of multiple scored lines in the concrete as our method for defining parking stalls and signage to designate fire Imes, as recently has been permitted in our other mixed -use projects, for the reasons that:—�. 4 ,r 3. The problem of this walkway is compounded by the relatively steep grade as you proceed west from these buildings. As a result, if this connecting walkway was installed it would require a substantial cut across the hillside which could be mitigated with a relatively natural (landscape timbers or other) retaining wall but nevertheless a retaining wall. 4. On balance, we believe that a modification of the connecting walkway standard permitting the residents of Building G and Building 2 to proceed from the courtyard areas (colored patterned concrete) in front of their houses to a walkway which proceeds across a private drive to the sidewalk would be reasonable and desirable and not adversely affect safety. And furthermore we believe that the benefit to the public by not causing further intrusion in the form of a connecting walkway in the open space buffer at the west of these buildings is a substantial public benefit which justifies the granting of this modification. Accordingly we respectfully request approval to allow us to not provide this sidewalk connection as proposed, for the reasons that: 1. The granting of the modification would not be detrimental to the public good — but rather the public good will be enhanced, as has been described above; 2. We believe granting of this modification will result in substantial benefit to the City in the form of not constructing a walkway through an open space buffer, which walkway would be difficult to construct and somewhat unaesthetic because of the steep grades involved; 3. And we believe that the exceptional physical conditions that are unique to this property including unusual configuration, site constraints, and grade, support the appropriateness of granting this modification. Modification Request #2 — Arterial Street Connection In reference to LUC 3.6.3(E): Our project does not have connectivity from at least three arterial streets, even when we project the future development of remaining parcels within one mile distance. This is because of the very unusual constraints and topographic features relating to this property, including: 1. No connectivity to the west possible because of the railroad tracks and embankment, and private property beyond. 2. No connectivity to the south because of City -owned Redtail Grove Natural Area. 3 Redtail Carriage Houses are located along a linear park in the center of the project and have open space views to the east as well as mountain views to the west. Buildings G, 1 and 2 overlook naturalized detention ponds and private open space to the west and south. Building G is an eight-plex, while Buildings 1 and 2 are carriage houses which each creatively incorporate two residential units above garages. The project is an inf ill project between offices and retail to the east, warehouse -office to the north, City -owned Redtail Grove Natural Area to the south, and to the west a 200- foot wide elevated railroad track embankment with residential beyond that. The project has been designed with high sensitivity to the three naturalized detention ponds located between the proposed residential and the existing office uses. Connectivity is being provided between the project residential uses and existing offices to the east, and also between project and existing warehouse uses to the north, by means of Cameron Drive, Redtail Court, Fossil Boulevard, Frontage Road, Coronado Court, public and private sidewalks, and connectivity to planned bike/ped paths between Fossil Creek and the Mason Street Transportation Corridor. Project is adjacent to the Redtail Grove Natural Area to the south and overlooks three naturalized detention ponds within the project. Project has 76% (7.3 acres) of private open space and landscaped area. This also is a key design element, which benefits homeowners, provides them with a beautiful natural setting to live in, and enhances their sense of community and quality of life. Modification Request #1 — Sidewalk Connection from Building G and Building 2 In reference to LUC 3.5.2.(C): Building G and Building 2 connect to the Fossil Boulevard sidewalk by means of a walkway which proceeds from the southeast corner of Building G across a very low traffic driveway and then north through a landscaped area to the sidewalk. The reasons for this are: 1. The unique and difficult configuration of the entire Redtail property, and the engineering and fire safety requirements which must be met for such project, constrain this building site with Redtail Court to the north, private open space to the west, Fossil Creek Office Park parking lot to the south, and Fossil Boulevard to the east. 2. While it is possible to connect these two buildings with a connecting walkway which runs along the west side of such buildings and proceeds north to the Redtail Court sidewalk, this connecting walkway would intrude into the open space buffer and because of its connection to the Redtail Court sidewalk would perhaps invite additional people into this area. 2 LAGUNITAS PEDTAIL INC. 3944 JFK Parkway, Suite 12 E, Fort Collins, CO 80525 970-226-5000 • Fax 970-226-5125 February -26, 2003-1 Planning and Zoning Commission City of Fort Collins 281 North College Avenue Fort Collins, CO 80525 RE: Redtail Project / Modification Requests Dear Planning and Zoning Commission Members: Introduction Redtail is a unique mixed residential use project consisting of two complementary neighborhoods adjacent to each other, which make use of this difficult infill parcel in a way that incorporates good planning, good architecture, and respect for environmental considerations. In each there is a unifying contemporary -traditional architectural theme, pleasant landscaping, and a sense of cohesiveness and community. All units are residential townhouses or condominiums and are for sale to owner -occupants. A diversity of homes, including size, architecture and price, will be offered in the Redtail project, including: Redtail Townhouses are located on a small hill previously the home of Mill Brothers Nursery. They overlook College Avenue to the east and have mountain views to the west. These are attached tandem garage townhouses with frontage on Fossil Boulevard and access to garages off alleys to the rear of the buildings. A major purpose of these townhouses is to create a very attractive neighborhood of affordable housing for sale. The mini -park, mail kiosk, tot lot area has benches and provides the opportunity for informal socializing. Redtail Condominiums are located on the mesa and the units will overlook three naturalized detention ponds. The buildings open onto pedestrian -friendly courtyards and landscaped front yards, which functionally and aesthetically merge landscape, hardscape, pedestrian, bike and vehicle uses. Also, they provide connectivity via sidewalks to a central courtyard which includes a plaza area, mail kiosk and small sitting area for informal socializing. 1