HomeMy WebLinkAboutSIDEHILL, FILING ONE - PDP - 32-01B - DECISION - FINDINGS, CONCLUSIONS & DECISIONAJOH S 5
rgm �Ia s �; j uo cr )) .
Sidehill PDP, 1s` Filing
Administrative Hearing
Findings, Conclusions, and Decision
June 26, 2003
Page 5 of 5
Building and Project Compatibility
Section 3.5.1 of the LUC requires that new developments be compatible with the
established character of the area. Pursuant to this section, the proposed
buildings include architectural details, building materials, forms, and colors that
are similar or compatible with existing buildings, or development plans that are
presently under review, in the area.
Residential Building Standards
The Staff Report outlines how the project complies with the building setback and
orientation standards found within this Section.
Transportation Level of Service Requirements
Section 3.6 of the LUC imposes standards for all modes of transportation. The
Transportation Impact Analysis indicates that the project complies with Level of
Service (LOS) standards for all modes of transportation except for vehicular LOS
at the Prospect and Timberline intersection. No building permits shall be issued
for the development until the necessary street and intersection improvements are
in place or commitments are in place pursuant to Section 3.7.3(E).
SUMMARY OF CONCLUSIONS
A. The Sidehill Project Development Plan, 1 st Filing is subject to administrative
review and the requirements of the Land Use Code (LUC).
B. The Sidehill Project Development Plan, 1st Filing complies with all applicable
district standards of Sections 4.4 (LMN) Low Density Mixed Use Neighborhood
zone and Section 4.5 (MMN) Medium Density Mixed Use Neighborhood zone.
C. The Sidehill Project Development Plan, 1 st Filing complies with all applicable
General Development Standards contained in Article 3 of the Land Use Code.
DECISION
The Sidehill Project Development Plan, 1st Filing #32-01B, is hereby approved by
the Hearing Officer.
Dated this 19th day of August 2003, per authority granted by Sections
1.4.9(E) and 2.1 of the Land Use Code.
Cameron Glos
Current Plann' g Director
Sidehill PDP
Administrative Hearing
Findings, Conclusions, and Decision
June 26, 2003
Page 4 of 5
central gathering space meeting the requisite size. All of the City's block
standards, building frontage, and height requirements will be met. There was no
evidence presented at the public hearing to contradict the Project's compliance
with the Article Four Use or Development standards.
3. Compliance with Article 3 of the Land Use Code — General Development
Standards
The project development plan complies with all applicable sections of Article 3 of
the LUC as explained below.
Landscaping and Tree Protection. The staff report outlines the Project's
compliance with Section 3.2.1 concerning landscaping and tree protection
standards. The requested alternative method of compliance to the street tree
spacing requirements satisfies the purpose of the standard equally well as a plan
that satisfies the standard. There was no evidence introduced at the hearing to
contradict the Staff Report.
Parking and Access. The staff report outlines the Project's compliance with
Section 3.2.2 concerning access, circulation and parking. A total of 350 off-street
parking spaces are required to serve the multi -family units where a total of 407
off-street parking spaces are provided on the subject property. Sufficient
disabled parking spaces are provided. Pedestrian areas are clearly differentiated
from vehicular use areas and all off-street parking spaces have unobstructed
vehicular access to and from the public streets. Therefore, based on the
information presented, the Project complies with Section 3.2.2 of the LUC.
Site Lighting
Section 3.2.4 requires that exterior lighting will be evaluated to ensure that the
functional and security needs of the development are met in a way that does not
adversely affect the adjacent properties or neighborhood. The proposed lighting
fixtures, illuminating parking lots, drive aisles, and walkway areas, has been
designed with a fully shielded light source with a sharp cut-off feature that will
minimize up -light, spill light, glare and unnecessary diffusion on adjacent
properties. Based on the submitted lighting plan, the lighting standards of this
section are met.
Engineering/Subdivision Plat
Division 3.3 sets standards for subdivision plats regarding the general layout of
the lots, roads, driveways, utilities, drainage facilities, and other services within
the proposed development. The Staff Report outlines how the subdivision plat
meets these standards, including the dedication of rights -of -way and easements
necessary to serve the development.
Sidehill PDP
Administrative Hearing
Findings, Conclusions, and Decision
June 26, 2003
Page 3 of 5
Written Comments:
None.
FACTS AND FINDINGS
1. Site Context/Background Information
The surrounding zoning and land uses are as follows:
W: MMN; Timberline Road, proposed Mansion Park P.D.P. (under
development review), LMN; proposed Mansion Park P.D.P. (under
development review),
SW: RL; Meadows East Residential Neighborhood,
S: NC; Drake Road, Undeveloped Neighborhood Commercial Center of
Rigden Farm, MMN; Undeveloped Multifamily property in Rigden Farm,
E: T; Existing farmland, Cargil Seed Research farm,
NE: LMN; Johnson Property O.D.P., I; Johnson Property O.D.P.,UE;
Johnson Property O.D.P.
The property was annexed in November 1997 as part of the Timberline
Annexation and was originally zoned T — Transition. A request to amend the
Structure Plan and rezone the property to LMN and MMN was approved on 2"d
reading by City Council on November 20, 2001.
2. Compliance with Article 4 and the MMN— Medium Density Mixed Use
Zoning District and LMN — Low Density Mixed Use Zoning District
Standards:
The Project Development Plan complies with all applicable requirements of
Article 4 and the MMN and LMN zone districts. The Staff Report summarizes the
PDP's compliance with these standards and no specific evidence was presented
to contradict or otherwise refute the compliance with Article 4 or the MMN or
LMN District Standards. In particular, the proposed multi -family dwellings and
small lot single-family detached dwellings are permitted within the MMN zone
district, and the small lot single-family detached dwellings and single-family
detached dwellings are permitted within the LMN district, subject to an
administrative review. The proposed residential density distribution is consistent
to that approved under the Johnson Property O.D.P. A neighborhood center will
be located less than 3,960 feet from all dwellings within the development and a
small neighborhood park within 1/3 mile. At least 90 percent of the dwelling units
proposed within the MMN-zoned area will be within '/< mile of a private park or
Sidehill PDP
Administrative Hearing
Findings, Conclusions, and Decision
June 26, 2003
Page 2 of 5
SUMMARY OF HEARING OFFICER DECISION: Approval
ZONING DISTRICTS: MMN — Medium Density Mixed Use Neighborhood District and
LMN — Low Density Mixed Use Neighborhood District.
STAFF RECOMMENDATION: Approval
NOTICE OF PUBLIC HEARING: Evidence presented to the Hearing Officer established
no controversy or facts to refute that the hearing was
properly posted, legal notices mailed and notice
published.
PUBLIC HEARING
The Hearing Officer, presiding pursuant to the Fort Collins Land Use Code, opened the
hearing at approximately 4:00 p.m. on August 14, 2003 in Conference Room A, 281 N.
College Avenue, Fort Collins, Colorado.
HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE:
The Hearing Officer accepted during the hearing the following evidence: (1) Planning
Department Staff Report; (2) application, plans, maps and other supporting documents
submitted by the applicant and the applicant's representatives to the City of Fort Collins;
and (3) a tape recording of the public hearing. The LUC, the City's Comprehensive
Plan (City Plan), and the formally promulgated policies of the City are all considered
part of the evidence considered by the Hearing Officer.
The following is a list of those who attended the meeting:
From the City:
Troy Jones, City Planner
From the Applicant:
Jim Postle
Eldon Ward, Cityscape Urban Design
John Beauparlant, The James Company
Sharon Fisher, The James Company
Randall Provencio, JR Engineering
From the Public:
None.
Comi._-,nity Planning and Environment~_ Services
Current Planning
CITY OF FORT COLLINS
City of Fort Collins ADMINISTRATIVE HEARING OFFICER
TYPE I ADMINISTRATIVE HEARING
FINDINGS, CONCLUSIONS AND DECISION
ADMINISTRATIVE HEARING DATE
PROJECT NAME:
CASE NUMBER:
APPLICANT:
OWNER:
HEARING OFFICER:
PROJECT DESCRIPTION:
August 14, 2003
Sidehill Project Development Plan,
1st Filing
#32-01 B
Joe Carter
Cityscape Urban Design
3555 Stanford Road
Fort Collins, CO 80525
The James Company
2919 Valmont Rd., Suite 204
Boulder, CO 80301
Cameron Gloss
Current Planning Director
The Applicant has submitted a Project Development Plan (referred to herein as the
"Project" or the "PDP") for 80 single-family detached dwellings, and 220 multi -family
dwelling units on 39.33 acres. This Project Development Plan (P.D.P.) is the first filing
of the property that gained Overall Development Plan (O.D.P.) approval as the Johnson
Property O.D.P. This proposed development is located at the northeast corner of the
intersection of Drake Road and Timberline Road, and has 25.83 acres in the MMN —
Medium Density Mixed -use Neighborhood zone district, and 13.48 acres in the LMN —
Low Density Mixed -use Neighborhood zone district.
A subdivision plat is part of the PDP application.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020