Loading...
HomeMy WebLinkAboutPARADIGM PROPERTIES - ODP - 29-01A - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSAPPENDIX F mll nl:bLuvu: oignaii.ea inLel6cCLiUn:5 ncicn�c s.+ Analyst: Michael Inter.: Prospect/E. Fr Cage Road Agency: Matthew J. Delich, P_ Area Type: All other c_ as Date: 5/10/02 Jurisd: F t Collins Period: amqv Year long otal bkgrd Project ID: 0225 E/W St: Prospect Road N/S St: East Frontage Road SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound I I L T R I L T R I L T R I L T R I I I I I I No. Lanes I 1 1 1 I 1 1 1 I 1 1 0 1 1 1 0 LGConfig I L T R I L T R I L TR I L TR I Volume I50 595 180 1130 405 75 1460 40 115 170 45 30 1 Lane Width 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 112.0 12.0 RTOR Vol 1 0 1 0 1 0 1 0 I Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A P I NB Left A A A Thru P I Thru A A Right P I Right A A Peds X I Peds X WB Left A P I SB Left A A Thru P I Thru A Right P I Right A Peds X I Peds X NB Right I EB Right A A SB Right I WB Right A Green 6.0 45.0 6.0 12.0 21.0 Yellow 0.0 3.0 0.0 0.0 3.0 All Red 0.0 2.0 0.0 0.0 2.0 Cycle Length: 100.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound L 390 1770 0.14 0.52 13.8 B T 838 1863 0.78 0.45 30.4 C 24.1 C R 1176 1583 0.18 0.68 5.9 A Westbound L 249 1770 0.58 0.52 21.9 C T 838 1863 0.54 0.45 22.4 C 20.8 C R 886 1583 0.09 0.56 10.3 B 'Northbound L 555 1770 0.92 0.40 50.3 D TR 546 1655 0.32 0.33 25.4 C 44.0 D Southbound L 417 1770 019 0.29 26.6 TR 368 1752 0.23 0.21 33.1 Intersection Delay = 29.2 (sec/veh) -C C 29.9 C Intersection LOS = C ' HCS2000: Signalized Intersections Release 4.1b Matthew J. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: (970) 669-2061 Fax: (970) 669-5034 ' E-Mail: mdelich@frii.com OPERATIONAL ANALYSIS Jt- 2 Analyst: Michael Inter.: Prospect/E. Fror' ge Road , Agency: Matthew J. Delich, P.E. Area Type: All other art Date: 5/10/02 Jurisd: F rt Collins Period: ai[ pm Year lon bkgrd total Project D: 0225 ' E/W St: Prospect Road N/S St: East Frontage Road SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound I , I L T R I L T R I L T R I L T R I I I I I I No. Lanes I 1 1 1 1 1 1 1 I 1 1 0 I 1 1 0 I LGConfig I L T R I L T R I L TR I L TR I Volume 125 480 300 1175 655 110 1385 25 90 175 50 20 1 Lane Width 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 112.0 12.0 1 RTOR Vol I 0 I 0 1 0 1 0 1 ' Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 , EB Left A P I NB Left A A A Thru P I Thru A A Right P I Right A A Peds X I Peds X ' WB Left A A P I SB Left A A Thru A P I Thru A Right A P I Right A Peds X I Peds X , NB Right I EB Right A A SB Right I WB Right A Green 6.0 4.0 46.0 6.0 10.0 18.0 Yellow 0.0 0.0 3.0 0.0 0.0 3.0 ' All Red 0.0 0.0 2.0 0.0 0.0 2.0 Cycle Length: 100.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate ,1 Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound L 321 1770 0.09 0.54 14.6 B T 857 1863 0.62 0.46 23.8 C 17.3 B R 1061 1583 0.31 0.67 7.1 A Westbound L 415 1770 0.47 0.57 14.5 B , T 932 1863 0.78 0.50 24.9 C 21.0 C R 966 1583 0.13 0.61 8.3 A Northbound , L 481 1770 0.89 0.35 49.3 D TR 460 1644 0.28 0.28 28.4 C 44.5 D Southbound L 388 1770 0.21 0.26 29.0 C TR 321 1784 0.24 0.18 35.6 D 32.2 C Intersection Delay = 25.3 (sec/veh) Intersection LOS = C , HCS2000: Signalized Intersections Release 4.1b ' Matthew J. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 ' Phone: (970) 669-2061 Fax: (970) 669-5034 E-Mail: mdelich@frii.com OPERATIONAL ANALYSIS , HCS2000: Unsignalized Intersections Release 4.1b TWO-W1. STOP CONTROL SUMMARY Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: 5/10/02 Analysis Time Period: am Prospect/RT-in/RT-out 'Intersection: Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: on total Project ID: 0225 ■ East/West Street: Prospect Road North/South Street: RT-in/RT-out Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments a Major Street: Approach Eastbound Westbound Movement 1 2 3 1 4 5 6 L T R I L T R Volume 805 215 Peak -Hour Factor, PHF 0.91 0.91 Flow Rate, HFR 884 236 'Hourly Percent Heavy Vehicles -- -- Median Type Undivided RT Channelized? No 1 1 'Lanes Configuration T R Upstream Signal? Yes No Minor Street: Approach Northbound Southbound ' Movement 7 8 9 I 10 11 12 L T R I L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles 'Percent Grade (�) Median Storage Flared Approach: Exists? 9 0.90 22 2 .7 Storage 'RT Channelized? No Lanes 1 Configuration R ' Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement 1 4 1 7 8 9 I 10 11 12 Lane Config I R I v (vph) 22 (vph) 410 'C(m) v/c 0.05 95% queue length 0.17 Control Delay 14.3 LOS B ' Approach Delay 14.3 Approach LOS B HCS2000: Unsignalized Intersections Release 4.1b Matthew J. Delich Matthew J. Delich, P.E. 1 ¢► HCS2000: Unsignalized Intersections Release 4.1b TWO-WAY )P CONTROL SUMMARY Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: 5 0/02 Analysis Time Period:(a-s)pm Intersection: Prospect/RT-in/RT-out Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: on total Project ID: 0225 East/West Street: Prospect Road North/South Street: RT-in/RT-out Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement 1 2 3 1 4 5 6 L T R I L T R volume ii5 zuu Peak -Hour Factor, PHF 0.90 0.90 Hourly Flow Rate, HFR 861 222 Percent Heavy Vehicles -- -- -- -- Median Type Undivided RT Channelized? No Lanes 1 1 Configuration T R Upstream Signal? Yes No "Minor Street: Approach Northbound Southbound Movement 7 8 9 1 10 11 12 L T R I L T R Volume 30 Peak Hour Factor, PHF 0.90 Hourly Flow Rate, HFR 33 Percent Heavy Vehicles 2 Percent Grade 0 0 Median Storage Flared Approach: Exists? Storage RT Channelized? No Lanes 1 Configuration R Delay, Queue Length, and Level of Service Approach EB WB Movement 1 4 Lane Config Northbound 1 7 8 9 1 10 R v (vph) 33 C(m) (vph) 414 v/c 0.08 95% queue length 0.26 Control Delay 14.4 LOS B Approach Delay 14.4 Approach LOS B Southbound 11 12 HCS2000: Unsignalized Intersections Release 4.1b Matthew J. Delich Matthew J. Delich, P.E. ¢U nu6zuUU: JignaiizeQ 1nE@rSeCL101i9'.^.t31cc5c iL 'Analyst: Michael Inter.: Prospect/I-25 Ramp Agency: Matthew J. Delich, P._ Area Type: All other a 3s Date: 5/10/02 Jurisd: Fort Collins Period: am Year on bkgrd total Project ID: 0225 E/W St: Prospect Road NIS St: I-25 NB Ramp SIGNALIZED INTERSECTION SUMMARY 1 I Eastbound I Westbound I Northbound I Southbound I I L T R I L T R I L T R I L T R I I I I I I No. Lanes i 1 2 0 I 0 2 1 I 2 0 1 1 0 0 0 1 LGConfig I L T I T R I L R I I Volume 1365 720 I 750 145 1595 300 1 1 Lane Width 112.0 12.0 I 12.0 12.0 112.0 12.0 1 1 RTOR Vol 1- I 0 1 0 I I IDuration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A P I NB Left A Thru A P I Thru Right I Right A Peds X I Peds X ' WB Left I SB Left Thru P I Thru Right P I Right Peds X I Peds X NB Right I EB Right SB Right I WB Right A Green 10.0 48.0 32.0 Yellow 0.0 3.0 3.0 All Red 0.0 2.0 2.0 Cycle Length: 100.0 secs Intersection Performance Summary 'Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound L 414 1770 0.96 0.59 48.3 D T 2053 3539 0.38 0.58 11.4 B 23.8 C Westbound T 1699 3539 0.49 0.48 18.7 B 15.9 B 'R 1346 1583 0.12 0.85 1.3 A Northbound L 1133 3433 0.58 0.33 28.6 C 29.8 C 'R 507 1583 0.66 0.32 32.4 C Southbound ' Intersection Delay = 23.2 (sec/veh) Intersection LOS = C HCS2000: Signalized Intersections Release 4.1b Matthew J. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: (171) 669-2061 Fax: (970) 669-5034 ' E-Mail: mdelich@frii.com OPERATIONAL ANALYSIS 37 Analyst: Michael Inter.: Prospect/I-25 NP 'amp , Agency: Matthew J. Delich, P.E. Area Type: All other art Date: 5/10/02 Jurisd: F t Collins Period:pm Year on bkgrd tota Project D• 0225 ' E/W St: Prospect Road N/S St: I-25 NB Ramp SIGNALIZED INTERSECTION SUMMARY 1 Eastbound I Westbound I Northbound I Southbound I ' I L T R I L T R I L T R I L T R 1 I i I I I No. Lanes 1 1 2 0 1 0 2 1 1 2 0 1 1 0 0 0 I LGConfig I L T I T R I L R Volume 1190 665 I 870 190 1775 310 1 I Lane Width 112.0 12.0 1 12.0 12.0 112.0 12.0 1 I RTOR Vol I 1 0 1 0 1 I Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 , EB Left A P I NB Left A Thru A P 1 Thru Right 1 Right A Peds X I Peds X , WB Left 1 SB Left Thru P 1 Thru Right P 1 Right Peds X 1 Peds X , NB Right 1 EB. Right SB Right 1 WB Right A Green 6.0 48.0 36.0 Yellow 0.0 3.0 3.0 All Red 0.0 2.0 2.0 Cycle Length: 100.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach , Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound L 300 1770 0.68 0.55 20.9 C T 1911 3539 0.37 0.54 13.4 B 15.1 B Westbound T 1699 3539 0.57 0.48 20.0- B 16.5 B R 1409 1583 0.15 0.89 0.7 A Northbound ' L 1270 3433 0.68 0.37 28.0 C 28.0 C R 570 1583 0.60 0.36 28.0 C Southbound ' Intersection Delay = 20.3 (sec/veh) Intersection LOS = C , HCS2000: Signalized Intersections Release 4.1b Matthew J. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive ' Loveland, CO 80538 Phone: (970) 669-2061 Fax: (970) 669-5034 E-Mail: mdelich@frii.com , OPERATIONAL ANALYSIS 3 c� n1;6tuuu: aignaiizeo inLersecLions nexcdse 'Analyst: Michael Agency: Matthew J. Delich, P Date: 5/1/0/02 Period: am6Y p 'Project ID: 0225 E/W St: Prospect Road Inter.: Prospect/I-25 Ramp Area Type: All other as Jurisd: Fort Collins Year lon bkgrd otal N/S St: I-25 SB Ramp SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound I I L T R I L T R I L T R I L T R I I I I I I No. Lanes I 0 2 1 I 1 2 0 1 0 0 0 1 1 0 1 1 LGConfig I T R I L T I I L R I Volume I 865 850 1230 1115 I 1220 230 1 Lane Width 1 12.0 12.0 112.0 12.0 I 112.0 12.0 1 RTOR Vol I 0 1 I 1 0 I Duration 0.25 Area Type: All other areas Signal Operations ' Phase Combination 1 2 3 4 1 5 6 7 8 EB Left I NB Left Thru P I Thru Right P I Right Peds X I Peds X ' WB Left A P I SB Left A Thru A P I Thru Right I Right A Peds X I Peds X NB Right I EB Right A SB Right I WB Right Green 6.0 48.0 36.0 Yellow 0.0 3.0 3.0 All Red 0.0 2.0 2.0 Cycle Length: 100.0 secs _ 'Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS ' Eastbound T 1699 R 1409 Westbound L 320 T 1911 ' Northbound 3539 0.53 0.48 1583 0.63 0.89 1770 0.80 0.55 3539 0.65 0.54 19.3 B 10.9 B 2.3 A 28.4 C 17.1 B 19.0 B 'Southbound L 655 1770 0.37 0.37 23.4 C 24.2 C ' R 570 1583 0.45 0.36 25.0 C Intersection Delay = 15.8 (sec/veh) Intersection LOS = B HCS2000: Signalized Intersections Release 4.1b Matthew J. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: (970) 669-2061 ' E-Mail: mdelich@frii.com Fax: (970) 669-5034 OPERATIONAL ANALYSIS Analyst: Michael Agency: Matthew J. Delich, P.E Date: 5/10/02 Period: m pm Project D: 0225 E/W St: Prospect Road Inter.: Prospect/I-25 SB Ramp Area Type: All other are Jurisd: Fort Collins Year long bkgrd total NIS St: I-25 SB Ramp SIGNALIZED INTERSECTION SUMMARY Eastbound I Westbound I Northbound I Southbound L T R I L T R I L T R I L T R No. Lanes I 0 2 1 ( 1 2 0 I 0 0 0 I 1 0 1 I LGConfig i T R I L T I I L R I Volume 1 640 555 1290 1335 I 1215 350 1 Lane Width 1 12.0 12.0 112.0 12.0 1 112.0 12.0 1 RTOR Vol 1 0 1 1 1 0 1 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 EB Left I NB Left Thru P I Thru Right P I Right Peds X I Peds X WB Left A P I SB Left A Thru A P I Thru Right 1 Right A Peds X I Peds X NB Right I EB Right A SB Right I WB Right Green 6.0 48.0 36.0 Yellow 0.0 3.0 3.0 All Red 0.0 2.0 2.0 Cycle Length: 100.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Ea T 1699 R 1409 Westbound L 389 T 1911 Northbound Southbound 3539 0.42 0.48 17.7 B 10.0+ B 1583 0.44 0.89 1.2 A 1770 0.83 0.55 39.2 D 3539 0.78 0.54 20.3 C 23.7 C L 655 1770 0.36 0.37 23.3 C 27.8 C R 570 1583 0.68 0.36 30.5 C Intersection Delay = 19.5 (sec/veh) Intersection LOS = B HCS2000: Signalized Intersections Release 4.1b Matthew J. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: (970) 669-2061 E-Mail: mdelich@frii.com Fax: OPERATIONAL ANALYSIS (970) 669-5034 3& HCS2uuu: aignaiizen incersec�ions:nci�a�o 1 'Analyst: Michael Inter.: Prospect/W. Fr `age Road Agency: Matthew J. Delich, P._ Area Type: All other a. is Date: 5/10/02 Jurisd: T.Collins Period: am parr Year 2.n bkgrd otal Project ID: 0225 E/W St: Prospect Road N/S St: West Frontage Road ' SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound I I L T R I L T R I L T R I L T R I I I I I I No. Lanes I 1 2 0 I 1 2 1 1 1 1 0 1 2 1 1 1 'LGConfig I L TR I L T R I L TR I L T R I Volume 1205 1230 20 I50 865 430 120 10 60 1425 10 280 1 Lane Width 112.0 12.0 112.0 12.0 12.0 112.0 12.0 112.0 12.0 12.0 1 RTOR Vol 1 0 1 0 1 0 I 0 1 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A P I NB Left A. A Thru P I Thru A Right P I Right A Peds X I Peds X X ' WB Left A P I SB Left A A Thru P 1 Thru A A Right P I Right A A Peds X I Peds X X NB Right I EB Right SB Right A I WB Right A A Green 6.0 46.0 6.0 10.0 22.0 Yellow 0.0 3.0 0.0 0.0 3.0 All Red 0.0 2.0 0.0 0.0 2.0 Cycle Length: 100.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS 'Eastbound L 298 1770 0.77 0.53 27.2 C TR 1624 3531 0.86 0.46 30.0 C 29.6 C Westbound L 233 1770 0.23 0.53 19.1 B T 1628 3539 0.57 0.46 21.1 C 16.8 B 1061 1583 0.43 0.67 7.9 A 'R Northbound L 464 1770 0.05 0.30 24.9 C TR 357 1623 0.22 0.22 32.3 C 30.6 C ' Southbound L 584 3433 0.81 0.17 48.2 D T 596 1863 0.02 0.32 23.3 C 37.1 D R 681 1583 0.46 0.43 20.7 C ' Intersection Delay = 26.5 (sec/veh) Intersection LOS = C ' HCS2000: Signalized Intersections Release 4.1b Matthew J. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 'Phone: (970) 669-2061 E-Mail: mdelich@frii.com Fax OPERATIONAL ANALYSIS (970) 669-5034 Analyst: Michael Agency: Matthew J. Delich, P.E Date: 5/10/02 Period: am pm Project D: 0225 E/W St: Prospect Road Inter.: Prospect/W. Fror'-ge Road Area Type: All other art Jurisd: Fort Collins Year ong bkgrd otal N/S St: West Frontage Road SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound I I L T R I L T R I L T R I L T R I I I I I I No. Lanes 1 1 2 0 I 1 2 1 I 1 1 0 1 2 1 1 I LGConfig I L TR I L T R I L TR I L T R I Volume 1200 820 10 130 1220 435 110 10 50 1325 10 115 1 Lane Width 112.0 12.0 112.0 12.0 12.0 112.0 12.0 112.0 12.0 12.0 1 RTOR Vol I 0 1 0 1 0 1 0 I Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A A P I NB Left A A Thru A P I Thru A Right A P I Right A Peds X 1 Peds X X WB Left A P I SB Left A A Thru P I Thru A A Right P I Right A A Peds X I Peds X X NB Right 1 EB Right SB Right A A I WB Right A A Green 6.0 4.0 48.0 6.0 6.0 20.0 Yellow 0.0 0.0 3.0 0.0 0.0 3.0 All Red 0.0 0.0 2.0 0.0 0.0 2.0 Cycle Length: 100.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound L 305 1770 0.73 0.59 32.6 C , TR 1837 3533 0.50 0.52 15.8 B 19.1 B Westbound L 404 1770 0.08 0.56 10.6 B , T 1699 3539 0.80 0.48 25.9 C 21.3 C R 1029 1583 0.47 0.65 9.2 A Northbound ' L 436 1770 0.03 0.28 26.1 C TR 326 1629 0.21 0.20 33.7 C 32.6 C Southbound , L 446 3433 0.81 0.13 53.0 D T 484 1863 0.02 0.26 27.6 C 43.8 D R 649 1583 0.20 0.41 19.1 B Intersection Delay = 24.0 (sec/veh) Intersection ' LOS = C HCS2000: Signalized Intersections Release 4.1b , Matthew J. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 ' Phone: (970) 669-2061 Fax: (970) 669-5034 E-Mail: mdelich@frii.com OPERATIONAL ANALYSIS , APPENDIX E 33 Analyst: Michael Agency: Matthew J. Delich, P.E. Date: 5/10/02 Period: am Project ID: 0225 E/W St: Prospect Road Inter.: Prospect/E. Fron' ?e Road Area Type: All other arc Jurisd: Fort Collins Year on kgrr total N/S St: East Frontage Road SIGNALIZED INTERSECTION SUMMARY Eastbound I Westbound I Northbound I Southbound L T R I L T R I L T R I L T R No. Lanes 1 1 1 1 I 1 1 1 1 1 1 0 1 1 1 0 1 LGConfig I L T R I L T R I L TR I L TR I Volume 140 585 65 170 440 75 145 20 95 190 20 30 1 Lane Width 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 112.0 12.0 1 RTOR Vol 1 0 1 0 1 0 1 0 1 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1. 2 3 4 1 5 EB Left A P I NB Left A Thru P I Thru A Right P I Right A Peds X 1 Peds X WB Left A P 1 SB Left A Thru P 1 Thru A Right P 1 Right A Peds X 1 Peds X NB Right 1 EB Right SB Right 1 WB Right Green 6.0 54.0 30.0 Yellow 0.0 3.0 3.0 All Red 0.0 2.0 2.0 Cycle Length: 100.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound L 474 1770 0.09 0.61 9.4 A T 1006 1863 0.64 0.54 19.3 B 17.9 B R 855 1583 0.08 0.54 11.3 B Westbound L 366 1770 0.21 0.61 11.9 B T 1006 1863 0.49 0.54 16.0 B 14.9 B R 855 1583 0.10 0.54 11.4 B Northbound L 403 1300 0.12 0.31 24.9 C TR 489 1631 0.26 0.30 26.9 C 26.3 C Southbound L TR 373 1202 509 1695 Intersection Delay 0.27 0.11 = 18.4 0.31 26.4 C . 0.30 25.4 C 26.0 C (sec/veh) Intersection LOS = B ■ ' HCS2000: Signalized Intersections Release 4.1b ' Matthew J. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 ' Phone: (970) 669-2061 Fax: (970) 669-5034 E-Mail: mdelich@frii.com ' OPERATIONAL ANALYSIS' 32, 1 riI.Ozuuu: JlgnatlzCu 13a�c1Dc.ci �.a.� i�cicuo .-.- 'Analyst: Michael Inter.: Prospect/E. Fr- tage Road Agency: Matthew J. Delich, P. Area Type: All other a .s Date: 10/02 Jurisd: Fort C lins Period: a pm Year on kgrd total Project D• 0225 E/W St: Prospect Road N/S St: East Frontage Road SIGNALIZED INTERSECTION SUMMARY ' 1 Eastbound I Westbound I Northbound I Southbound I L T R I L T R I L T R I L T R I I I I I I No. Lanes I 1 1 1 I 1 1 1 I 1 1 0 I 1 1 0 1 'LGConfig I L T R I L T R I L TR I L TR I Volume 110 465 55 1105 685 110 120 10 75 175 10 20 1 Lane Width 112.0 12.0 12.0 112.0 12.0 12.0 112.0 12.0 112.0 12.0 I RTOR Vol 1 0 1 0 1 0 I 0 I ' Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A P I NB Left A Thru P I Thru A Right P I Right A Peds X Peds X ' WB Left A A P I SB Left A Thru A P I Thru A Right A P I Right A Peds X I Peds X ' NB Right I EB Right SB Right I WB Right Green 6.0 4.0 50-0 30.0 Yellow 0.0 0.0 3.0 3.0 All Red 0.0 0.0 2.0 2.0 Cycle Length: 100.0 secs Intersection Performance Summary 'Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound L 348 1770 0.03 0.58 12.5 B T 932 1863 0.55 0.50 19.7 B 18.9 B R 792 1583 0.08 0.50 13.2 B 'Westbound L 475 1770 0.25 0.61 10.8 B T 1006 1863 0.76 0.54 21.2 C 18.8 B R 855 1583 0.14 0.54 11.5 B 'Northbound L 411 1326 0.05 0.31 24.3 C TR 485 1616 0.19 0.30 26.2 C 25.8 C Southbound L 389 1255 0.21 0.31 25.8 C TR 503 1676 0.07 0.30 25.0 C 25.6 C ' Intersection Delay = 19.7 (sec/veh) Intersection LOS = B HCS2000: Signalized Intersections Release 4.1b Matthew J. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 ' Phone: (970) 669-2061 Fax: (970) 669-5034 E-Mail: mdelich@frii.com OPERATIONAL ANALYSIS 31 Analyst: Michael Agency: Matthew J. Delich, P.E Date: 5/10/02 Period: am(O Project ID: 0225 E/W St: Prospect Road Inter.: Prospect/I-25 NB "amp , Area Type: All other are Jurisd: Foxt Collins Year ono kor ,total N/S St: I-25 NB Ramp SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound I I L T R I L T R I L T R I L T R I No. Lanes I I I I I 0 1 I 0 0 0 I I 1 2 0 I 0 2 1 I 2 LGConfig I L T I T R I L R I 1 Volume 1365 530 1 430 85 1660 160 1 I Lane Width 112.0 12.0 I 12.0 12.0 112.0 12.0 1 I RTOR Vol 1 I 0 1 0 1 I Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A P I NB Left A Thru A P I Thru Right I Right A Peds X I Peds X WB Left I SB Left Thru P I Thru Right P I Right Peds X 1 Peds X NB Right I EB Right SB Right I WB Right A Green 6.0 50.0 34.0 Yellow 0.0 3.0 3.0 All Red 0.0 2.0 2.0 Cycle Length: 100.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound L 515 1770 0.77 0.57 27.3 C T 1982 3539 0.29 0.56 11.6 B 18.0 B Westbound T 1770 3539 0.27 0.50 14.8 B 12.5 B R 1409 1583 0.07 0.89 0.7 A Northbound L 1202 3433 0.61 0.35 27.8 C 27.2 C R 538 1583 0.33 0.34 24.9 C Southbound Intersection Delay = 20.1 (sec/veh) Intersection LOS = C HCS2000: Signalized Intersections Release 4.1b , Matthew J. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive ' Loveland, CO 80538 Phone: (970) 669-2061 Fax: (970) 669-5034 E-Mail: mdelich@frii.com ' OPERATIONAL ANALYSIS D hc6zuuu: 6ignalizea lncersecciuii�:=ncloaa y • �� 'Analyst: Michael Inter.: Prospect/I-25 Ramp Agency: Matthew J. Delich, P. Area Type: All other z As Date: 5 10/02 Jurisd: Fort Co lins Period: pm Year ong kgr total Project ID: 0225 E/W St: Prospect Road N/S St: I-25 NB Ramp SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound I I L T R I L T R I L T R I L T R I I I I I I No. Lanes 1 1 2 0 1 0 2 1 1 2 0 1 1 0 0 0 1 'LGConfig I L T I T R I L R I I Volume 1190 405 I 590 135 1815 125 1 I Lane Width 112.0 12.0 I 12.0 12.0 112.0 12.0 1 I 'RTOR Vol 1 I 0 1 0 ( I Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 ' EB Left A P I NB Left A Thru A P I Thru Right I Right A Peds X I Peds X ' WB Left I SB Left Thru P I Thru Right P I Right Peds X I Peds X ' NB Right I EB Right SB Right I WB Right A Green 6.0 48.0 36.0 Yellow 0.0 3.0 3.0 All Red 0.0 2.0 2.0 Cycle Length: 100.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) V/c g/C Delay LOS Delay LOS Eastbound L 412 1770 0.50 0.55 13.4 B T 1911 3539 0.23 0.54 12.1 B 12.5 B ' Westbound T 1699 3539 0.39 0.48 17.3 B 14.2 B 1409 1583 0.11 0.89 0.7 A 'R Northbound L 1270 3433 0.71 0.37 28.9 C 28.1 C 570 1583 0.24 0.36 22.7 C 'R Southbound ' Intersection Delay = 19.6 (sec/veh) Intersection LOS = B ' HCS2000: Signalized Intersections Release 4.1b Matthew J. Delich 'Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: (170) 669-2061 Fax: (970) 669-5034 E-Mail: mdelich@frii.com OPERATIONAL ANALYSIS Zi Analyst: Michael Agency: Matthew J. Delich, P.E. Date: 5/10/02 Period: am Project ID: 0225 E/W St: Prospect Road Inter.: Prospect/I-25 SP -amp Area Type: All other are Jurisd: Fort C lins Year ong bkgrr )total N/S St: I-25 SB Ramp SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound I I L T R I L T R I L T R 1 L T R I No. Lanes I I I I I I 0 2 1 I 1 2 0 I 0 0 0 I 1 0 1 1 LGConfig ( T R I L T I I L R I Volume 1 790 850 1135 955 1 1105 295 1 Lane Width 1 12.0 12.0 112.0 12.0 1 112.0 12.0 1 RTOR Vol 1 0 1 1 1 0 1 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 EB Left I NB Left Thru P I Thru Right P I Right Peds X I Peds X WB Left A P I SB Left A Thru A P I Thru Right I Right A Peds X I Peds X NB Right I EB Right A SB Right WB Right Green 6.0 48.0 36.0 Yellow 0.0 3.0 3.0 All Red 0.0 2.0 2.0 Cycle Length: 100.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eas T 1699 3539 0.48 0.48 18.6 B 10.1 B R 1409 1583 0.63 0.89 2.3 A Westbound L 347 1770 0.43 0.55 13.7 B T 1911 3539 0.56 0.54 15.5 B 15.3 B Northbound Southbound L 655 1770 0.18 0.37 21.4 C 25.7 C R 570 1583 0.58 0.36 27.3 C Intersection Delay = 14.0 (sec/veh) Intersection LOS = B HCS2000: Signalized Intersections Release 4.1b Matthew J. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: (970) 669-2061 Fax: (970) 669-5034 E-Mail: mdelich@frii.com OPERATIONAL ANALYSIS Z% nC6ZUUv: algna-Lizea �nuersec.L:iun� Acxc=�� 5.- Michael Inter.: Prospect/I-25 '- Ramp 'Analyst: Agency: Matthew J. Delich, P., Area Type: All other a .s Date: 5/10/02 Jurisd: Fort Collins Period: ai pm Year on bkgr total Project ID: 0225 E/W St: Prospect Road N/S St: I-25 SB Ramp SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound I ' I L T R I L T R I L T R I L T I R I I I No. Lanes I 0 I I 1 1 1 1 2 0 1 0 0 0 1 1 0 2 1 LGConfig I T R I L T I I L R I Volume 520 555 1210 1195 I 175 405 1 Lane Width 1 12.0 12.0 112.0 12.0 I 112.0 12.0 1 RTOR Vol 1 0 1 I 1 0 I Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3; 4 1 5 6 7 8 ' EB Left s I NB Left Thru P f I Thru ry Right P I Right Peds X Peds X ' WB Left A P I SB Left A Thru A P I Thru Right I Right A Peds X I Peds X ' NB Right I EB Right A SB Right I WB Right Green 6.0 48.0 36.0 Yellow 0.0 3.0 3.0 All Red 0.0 2.0 2.0 Cycle Length: 100.0 secs Intersection Performance Summary Lane Adj Sat !Ratios Lane Group Approach 'Appr/ Lane Group Flow Rate 4 Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound T 1699 3539 0.34 0.48 16.7 B 8.7 A R 1409 1583 0.44 0.89 1.2 A 'Westbound L 446 1770 0.52 0.55 13.6 B T 1911 3539 0.69 0.54 18.1 B 17.4 B ' Northbound 4 Southbound Ili L 655 1770 0.13 0.37 20.9 C 33.6 C ' R 570 1583 0.79 0.36 36.0 D Intersection Delay = 16.9 (sec/veh) Intersection LOS = B ' HCS2000: Signalized Intersections Release 4.1b Matthew J. Delich Matthew J. Delich, P.E. '2272 Glen Haven Drive Loveland, CO 80538 Phone: (970) 669-2061 Fax: (970) 669-5034 ' E-Mail: mdelich@frii.com OPERATIONAL ANALYSIS Analyst: Michael Agency: Matthew J Date: 5/10/02 Period: am Project IDm: 225 E/W St: Prospect Inter.: Prospect/W. Fron�-3e Road Delich, P.E. Area Type: All other are Jurisd: t C ns Year long kgrd total Road NIS St: West Frontage Road SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound I I L T R I L T R I L T, R I L T R I No. Lanes I I 1 2 0 I I 1 2 1 I I 1 1 0 I I 1 2 1 1 1 LGConfig I L TR I L T R I L TR I L T R I Volume 1205 1170 20 150 785 415 120 10 60 1410 10 280 1 Lane Width 112.0 12.0 112.0 12.0 12.0 112.0 12.0 112.0 12.0 12.0 1 RTOR Vol 1 0 1 0 1 0 1 0 1 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A P I NB Left A A Thru P I Thru A Right P 1 Right A Peds X I Peds X X WB Left A P 1 SB Left A A Thru P I Thru A A Right P 1 Right A A Peds X I Peds X X NB Right I EB Right SB Right A I WB Right A A Green 6.0 46.0 6.0 10.0 22.0 Yellow 0.0 3.0 0.0 0.0 3.0 All Red 0.0 2.0 0.0 0.0 2.0 Cycle Length: 100.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound L 326 1770 TR 1624 3530 Westbound 0.70' 0.53 21.6 C 0.81 0.46 27.9 C 27.0 C L 233 1770 0.23 0.53 18.1 B T 1628 3539 0.51 0.46 20.2 C 16.0 R 1061 1583 0.42 0.67 7.8 A Northbound L 464 1770 0.05 0.30 24.9 C TR 357 1623 0.22 0.22 32.3 C 30.6 Southbound L 584 3433 0.78 0.17 46.5 D T 596 1863 0.02 0.32 23.3 C 35.8 R 681 1583 0.46 0.43 20.7 C Intersection Delay = 25.0 (sec/veh) Intersection B C D LOS = C HCS2000: Signalized Intersections Release 4.1b ' Matthew J. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive ' Loveland, CO 80538 Phone: (970) 669-2061 Fax: (970) 669-5034 E-Mail: mdelich@frii.com ' OPERATIONAL ANALYSIS 2LP 1 hc6zuuu: oignalizeo 1nLer5eC�i Uil� ncica.�c �.�.. Analyst: Michael Inter.: Prospect/W. Fr tage Road Agency: Matthew J. Delich, P. Area Type: All other a as Date: 5/10/02 Jurisd: F t o lins Period: m Year lon bkgr total am Project 0225 E/W St: Prospect Road N/S St: West Frontage Road SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound I I L T R I L T R L T R I L T R I I No. Lanes I I 1 2 0 I I 1 2 1 I 1 1 1 0 I I 2 1 1 1 LGConfig I L TR I L T R I L TR I L T R I Volume 1200 720 10 130 1150 420 I10 10 50 1305 10 115 1 Lane Width 112.0 12.0 112.0 12.0 12.0 112.0 12.0 112.0 12.0 12.0 1 RTOR Vol 1 0 1 0 1 0 1 0 1 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A A P I NB Left A A Thru A P I Thru A Right A P I Right A Peds X I Peds X X WB Left A P I SB Left A A Thru P Thru A A Right P I Right A A Peds X I Peds X X NB Right I EB Right SB Right A A I WB Right A A Green 6.0 4.0 48.0 6.0 6.0 20.0 Yellow 0.0 0.0 3.0 0.0 0.0 3.0 All Red 0.0 0.0 2.0 0.0 0.0 2.0 Cycle Length: 100.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound L 305 1770 0.73 0.59 32.1 C TR 1837 3532 0.44 0.52 15.1 B 18.8 B 'Westbound L 444 1770 0.07 0.56 10.3 B T 1699 3539 0.75 0.48 24.3 C 20.0+ C R 1029 1583 0.45 0.65 9.0 A Northbound L 436 1770 0.03 0.28 26.1 C TR 326 1629 0.21 0.20 33.7 C 32.6 C ' Southbound L 446 3433 0.76 0.13 49.5 D T 484 1863 0.02 0.26 27.6 C 40.8 D R 649 1583 0.20 0.41 19.1 B Intersection Delay = 22.9 (sec/veh) Intersection LOS = C ' HCS2000: Signalized Intersections Release 4.1b Matthew J. Delich 'Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 'Phone: (970) 669-2061 E-Mail: mdelich@frii.com Fax: (970) 669-5034 OPERATIONAL ANALYSIS i 25 APPENDIX D 2¢ Table 4-3 Fort Collins Motor Vehicle LOS Standards (Intersections %.Land Use (from structure.plan) Commercial. Other corridors within corridors Jntersechor+type. Mixed use Low density mixed Al other districts use residential areas Signalized D E' D D intersections overall Stop sign control NIA F" F'• E (arterial/local--any approach leg) Stop sign control NIA C C C (collectorAocal— any approach leg) ' mitigating measures required considered normal in an urban environment Page 4-22 Larimer County Urban Area Street Standard January 2, 2001 Z'� UNSIGNALIZED INTERSECTIONS Level -of -Service Average Total Delay sedveh A _< 10 B >10and<15 C >15and <<25 D >25and <35 E >35and <50 F > 50 SIGNALIZED INTERSECTIONS Level -of -Service Average Total Delay sec/veh A _< 10 B > 10 and _< 20 C > 20 and < 35 D >35and _<55 E > 55 and < 80 j F > 80 22- HCS2000: Unsignalized Intersections Release 4.1b TWO-Wh STOP CONTROL SUMMARY Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: 5/10 02 Analysis Time Period: am m Intersection: Prospect/E, Frontage Road Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: recent long bkgrd total Project ID: 0225 'East/West Street: Prospect Road North/South Street: East Frontage Road Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement 1 2 3 1 4 5 6 L T R I L T R ' Volume 17 127 19 4 95 4 Peak -Hour Factor, PHF 0.91 0.91 0.91 0.85 0.85 0.85 Hourly Flow Rate, HFR 18 139 20 4 ill 4- Percent Heavy Vehicles 2 2 Median Type Undivided RT Channelized? Lanes 0 1 0 0 1 0 Configuration LTR LTR Upstream Signal? No No Minor Street: Approach Northbound Southbound ' Movement 7 8 9 I 10 11 12 L T R I L T R 22 3 6 0 8 7 'Volume Peak Hour Factor, PHF 0.85 0.85 0.85 0.85 0.85 0.85 Hourly Flow Rate, HFR 25 3 7 0 9 8 Percent Heavy Vehicles 2 2 2 2 2 2 'Percent Grade M 0 0 Median Storage Flared Approach: Exists? No No Storage 'RT Channelized? Lanes 0 1 0 0 1 0 Configuration LTR LTR ' Delay, Approach EB Movement 1 Lane Config LTR Queue Length, and Level of Service WB Northbound Southbound 4 1 7 8 9 I 10 11 12 LTR I LTR I LTR v (vph) 18 4 :35 1 I (vph) 1474 1420 656 715 'C(m) v/c 0.01 0.00 0.05 0.02 95% queue length 0.04 0.01 0.17 0.07 Control Delay 7.5 7.5 10.8 10.2 A A B B 'LOS Approach Delay 10.8 10.2 Approach LOS B B HCS2000: Unsignalized Intersections Release 4.1b Matthew J. Delich Matthew J. Delich, P.E. HCS2000: Unsignalized Intersections Release 4.1b TWO-WAY JP CONTROL SUMMARY Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: 5/10/02 Analysis Time Period: (am)pm Intersection: ospect/E. Frontage Road Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: ecent long bkgrd total Project ID: 0225 East/West Street: Prospect Road North/South Street: East Frontage Road Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement 1 2 3 1 4 5 6 L T R I L T R Volume z lUl 1/ 4 15U J Peak -Hour Factor, PHF 0.85 0.85 0.85 0.88 0.88 0.88 Hourly Flow Rate, HFR 2 118 19 4 170 5 Percent Heavy Vehicles 2 -- -- 2 -- -- Median Type Undivided RT Channelized? Lanes 0 1 0 0 1 0 Configuration LTR LTR Upstream Signal? No No Minor Street: Approach Northbound Southbound Movement 7 8 9 1 10 11 12 L T R I L T R Volume 4 0 4 4 3 5 Peak Hour Factor, PHF 0.85 0.85 0.85 0.85 0.85 0.85 Hourly Flow Rate, HFR 4 0 4 4 3 5 Percent Heavy Vehicles 2 2 2 2 2 2 Percent Grade ($) 0 0 Median Storage Flared Approach: Exists? No No Storage RT Channelized? Lanes 0 1 0 0 1 0 Configuration LTR LTR Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement 1 4 1 7 8 9 1 10 11 12 Lane Config LTR LTR I LTR I LTR v (vph) 2 4 8 12 C(m) (vph) 1401 1447 748 702 v/c 0.00 0.00 0.01 0.02 95% queue length 0.00 0.01 0.03 0.05 Control Delay 7.6 7.5 9.9 10.2 LOS A A A B Approach Delay 9.9 10.2 Approach LOS A B HCS2000: Unsignalized Intersections Release 4.1b Matthew J. Delich Matthew J. Delich, P.E. Z. d HCS2000: Unsignalized Intersections Release 4.1b ' TWO -WA ffOP CONTROL SUMMARY Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: 5/10/02 Analysis Time Period: am o Intersection: Prospect/I-25 NB Ramp Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: recen long bkgrd total Project ID: 0225 'East/West Street: Prospect Road North/South Street: I-25 NB Ramp Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement 1 2 3 1 4 5 6 L T R I L T R ' Volume 206 138 112 12 -Peak-Hour Factor, PHF 0.92 0.92 0.85 0.85 Hourly Flow Rate, HFR 223 149 131 14 Percent Heavy Vehicles 2 -- Median Type Undivided RT Channelized? Lanes 0 1 1 0 Configuration LT TR Upstream Signal? No No ' Minor Street: Approach Northbound Southbound Movement 7 8 9 1 10 11 12 L T R I L T R Volume 461 a�� 25 Peak Hour Factor, PHF 0.89 1-140 0.89 Hourly Flow Rate, HFR 517 28 Percent Heavy Vehicles 2 2 Percent Grade M 0 Median Storage Flared Approach: Exists? Storage RT Channelized? No Lanes 1 1 Configuration L R 0 Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound 1 4 1 7 8 9 1 10 11 12 'Movement Lane Config LT I L R I v (vph) 223 517 28 (vph) 1437 328 898 'C(m) v/c 0.16 1.58 0.03 95% queue length 0.55 30.07 0.10 Control Delay 8.0 302.4 9.1 A F A 'LOS Approach Delay 287.4 Approach LOS F HCS2000: Unsignalized Intersections Release 4.1b Matthew J. Delich Matthew J. Delich, P.E. 1 i9 HCS2000: Unsignalized Intersections Release 4.1b TWO-WAY P CONTROL SUMMARY Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: W10/02 Analysis Time Period;(ay pm Intersection: rospect/I-25 NB Ramp Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: recen long bkgrd total Project ID: 0225 East/West Street: Prospect Road North/South Street: I-25 NB Ramp Intersection Orientation: EW 0 Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement 1 2 3 1 4 5 6 L T R I L T R Volume 67 99 132 27 Peak -Hour Factor, PHF 0.93 0.93 0.85 0.85 Hourly Flow Rate, HFR 72 106 155 31 Percent Heavy Vehicles 2 -- -- -- -- Median Type Undivided RT Channelized? Lanes 0 1 1 0 Configuration LT TR Upstream Signal? No No Minor Street: Approach Northbound Southbound Movement 7 8 9 1 10 11 12 L T R I L T R Volume 630 21 Peak Hour Factor, PHF poae� 0.85 11keo 0.85 Hourly Flow Rate, HFR 741 24 Percent Heavy Vehicles 2 2 Percent Grade (%) 0 0 Median Storage Flared Approach: Exists? Storage RT Channelized? No Lanes 1 1 Configuration L R Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement 1 4 1 7 8 9 1 10 11 12 Lane Config LT I L R I v (vph) 72 741 24 C(m) (vph) 1388 559 948 v/c 0.05 1.33 0.03 95% queue length 0.16 31.56 0.08 Control Delay 7.7 180.7 8.9 LOS A F A Approach Delay 175.3 Approach LOS F HCS2000: Unsignalized Intersections Release 4.1b Matthew J. Delich Matthew J. Delich, P.E. 10 I HCS2000: Unsignalized Intersections Release 4.1b TWO -WA ;TOP CONTROL SUMMARY Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: 5/10 02 Analysis Time Period: am('pm) Intersection: Pro pect/I-25 SB Ramp Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: recen long bkgrd total Project ID: 0225 East/West Street: Prospect Road North/South Street: I-25 SB Ramp Intersection Orientation: EW i Major Street Study period (hrs): 0.25 Vehicle Volumes and Adjustments Approach Eastbound Westbound Movement 1 2 3 1 4 5 6 L T R I L T R Volume Peak -Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type Undivided RT Channelized? ' Lanes Configuration Upstream Signal? 331 670 34 537 0.96 0.96 0.88 0.88 344 697 38 610 1 0 TR No 0 1 LT No Minor Street: Approach Northbound Southbound Movement 7 8 9 1 10 11 12 L T R I L T R 13 118 'Volume Peak Hour Factor, PHF 0.88 0.88 Hourly Flow Rate, HFR 14 134 Percent Heavy Vehicles 2 2 Percent Grade (%) 0 0 Median Storage Flared Approach: Exists? Storage RT Channelized? No Lanes 1 1 Configuration L R ' Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound 1 4 1 7 8 9 1 10 11 12 'Movement Lane Config LT I I L R v (vph) 38 14 134 (vph) 668 151 494 'C(m) v/c 0.06 0.09 0.27 95% queue length 0.18 0.30 1.09 Control Delay 10.7 31.3 15.0- LOS B D B Approach Delay 16.5 Approach LOS C HCS2000: Unsignalized Intersections Release 4.1b ' Matthew J. Delich Matthew J. Delich, P.E: 1 11 RCS2000: Unsignalized Intersections Release 4.1b TWO-WAY )P CONTROL SUMMARY Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: 5/10/02 Analysis Time Period: pm Intersection: rospect/I-25 SB Ramp Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: ecent long bkgrd total Project ID: 0225 East/West Street: Prospect Road North/South Street: I-25 SB Ramp Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement 1 2 3 1 4 5 6 L T R I L T R Volume 162 414 48 713 Peak -Hour Factor, PHF 0.90 0.90 0.87 0.87 Hourly Flow Rate, HFR 180 460 55 619 Percent Heavy Vehicles -- -- 2 -- -- Median Type Undivided RT Channelized? Lanes 1 0 0 1 Configuration TR LT Upstream Signal? No No Minor Street: Approach Northbound Southbound Movement 7 8 9 I 10 11 12 L T R I L T R Volume 5 243 Peak Hour Factor, PHF T�Ao 0.85 0.85 Hourly Flow Rate, HFR kov� { 5 285 Percent Heavy Vehicles 2 2 Percent Grade (%) 0 0 Median Storage Flared Approach: Exists? Storage RT Channelized? Lanes Configuration No 1 1 L R Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement 1 4 17 8 9 1 10 11 12 Lane Config LT ( I L R v (vph) 55 5 285 C(m) (vph) 944 158 375 v/c 0.06 0.03 0.76 95% queue length 0.19 0.10 6.14 Control Delay 9.0 28.5 39.3 LOS A D E Approach Delay 39.1 Approach LOS E HCS2000: Unsignalized Intersections Release 4.1b Matthew J. Delich Matthew J. Delich, P.E. 16 HCS2000: Unsignalized intersections heiease 4.io TWO-WT STOP CONTROL SUMMARY Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. 'Date Performed: 5/10/02 Analysis Time Period: am 0 Intersection: Prospect/W. Frontage Road Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: recen long bkgrd total Project ID: 0225 East/West Street: Prospect Road 'North/South Street: West Frontage Road Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Movement 1 L Eastbound 2 T 3 R 1 4 I L Westbound 5 T 6 R 'Volume 57 974 3 2 624 29 Peak -Hour Factor, PHF 0.90 0.90 0.90 0.94 0.94 0.94 Hourly Flow Rate, HFR 63 1082 3 2 663 30 Heavy Vehicles 2 -- --, 2 -- -- 'Percent Median Type Undivided RT Channelized? Lanes 0 1 0 0 1 0 Configuration LTR LTR Upstream Signal? No No Minor Street: Approach Northbound Southbound Movement 7 8 9 1 10 11 12 ' L T R I L T R Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade ($) 'Median Storage Flared Approach: Exists? Storage 'RT Channelized? Lanes Configuration Delay, Approach EB Movement 1 'Lane Config LTR v (vph) 63 C(m) (vph) 902 0.Oi 'v/c 95% queue length 0.22 Control Delay 9.3 LOS A Delay 'Approach Approach LOS 5 0 4 23 0 120 0.85 0.85 0.85 0.88 0.88 0.88 5 0 4 26 0 136 2 2 2 2 2 2 0 0 No No 0 1 0 0 1 0 LTR LTR Queue Length, and Level of Service WB Northbound Southbound 4 1 7 8 9 1 10 11 12 LTR I LTR I LTR 2 9 162 643 48 187 0.00 0.19 0.87 0.01 0.61 6.39 10.6 96.6 B5.9 B F F 96.6 85.9 F F HCS2000: Unsignalized Intersections Release 4.1b 'Matthew J. Delich Matthew J. Delich, P.E. HCS2000: Unsignalized Intersections Release 4.1b TWO-WAY 1P CONTROL SUMMARY Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: 5/10/02 Analysis Time Period: am m Intersection: rospect/W. Frontage Road Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: 42Dlong bkgrd total Project ID: 0225 East/West Street: Prospect Road North/South Street: West Frontage Road Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement 1 2 3 1 4 5 6 L T R I L T R Volume 60 567 2 3 922 31 Peak -Hour Factor, PHF 0.89 0.89 0.89 0.85 0.85 0.85 Hourly Flow Rate, HFR 67 637 2 3 1084 36 Percent Heavy Vehicles 2 -- -- 2 -- -- Median Type Undivided RT Channelized? Lanes 0 1 0 0 1 0 Configuration LTR LTR Upstream Signal? No No Minor Street: Approach Northbound Southbound Movement 7 8 9 1 10 11 12 L T R I L T R Volume Peak Hour Factor, PHF Hourly Flow Rate,HFR Percent Heavy Vehicles Percent Grade (%) Median Storage Flared Approach: Exists? Storage 5 2 3 6 0 27 0.85 0.85 0.85 0.85 0.85 0.85 5 2 3 7 0 31 2 2 2 2 2 2 0 0 No Im- RT Channelized? Lanes 0 1 0 0 1 0 Configuration LTR LTR Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement 1 4 1 7 8 9 1 10 11 12 Lane Config LTR LTR I LTR I LTR v (vph) 67 3 10 38 C(m) (vph) 624 945 61 139 v/c 0.11 0.00 0.16 0.27 95% queue length 0.36 0.01 0.54 1.04 Control Delay 11.5 8.8 75.3 40.4 LOS B A F E Approach Delay 75.3 40.4 Approach LOS F E HCS2000: Unsignalized Intersections Release 4.1b Matthew J. Delich Matthew J. Delich, P.E. 11 APPENDIX C 13 ATD Services, Inc. 6214 Secrest Street Arvada, CO.80408ile Name Site Code Start Date Page No :EFRONT&PROSPECTPM :99923778 : 02/07/2002 :2 EAST FRONTAGE RD PROSPEC FRONTAGE RD PROSPECT ft Eastbound Start Time Left ISouft1Po4unihd 7h j Ate' IWm Left Th A' Togl Left t ApP' Total Left Thru 8i9h t App. Total Int. Total t Total t Peak Hour From 04:00 PM to 05:45 PM - Peak 1 or 1 Intersectio 04:15 PM Volume 0 8 7 15 4 97 4 105 24 3 6 33 16 123 16 157 310 Percent 0.0 53.3 46.7 3.8 92.4 3.8 72.7 9.1 18.2 10.2 78.3 11.5 High InL 04:15 PM 04:30 PM 05:00 PM 04:15 PM 04:15 Volume 0 2 3 5 1 27 2 30 4 0 1 5 5 33 5 43 83 Peak Factor 0.750 0.847 0.589 0.913 0.934 EAST FROM FAZE KV ON to �To�d� I0 15 I 0 71 B 0 iw Thu Lao 4 1 L+ l(IMM"Z I Af, !r Nam DZIOU200217;00 UnanNad R T Rir 241 3 ® 33 Out In Tahl EASTFRONTAGERO (2 UM/ 1al uL io.li rnn b. u 4o4 Ujuo ATD Services, Inc. 6214 Secrest Street Arvada, CO.80468e Name : EFRONT&PROSPECTAMI Site Code : 99923778 Start Date : 02/07/2002 Page No :2 Start Time soMbOLM Left Thru Rtgt T�otap� Lit ..wow h T t Total — Left ThN Righ t App. Total Left Thru Righ t App. Total Int. Total peak Hour From 07:00 AM to 08:45 AM - Peak 1 of 1 Intereectio 07:00 AM Volume 4 3 5 12 4 149 5 158 4 0 4 a 2 100 17 119 297 Percent 33.3 25.0 41.7 2.5 94.3 3.2 50.0 0.0 50.0 1.7 07:15 AM 0 14.3 07:15 High Int. 07:15 AM 07:45 AM 07.00 AM 0 0 30 5 Volume 1 2 2 5 0•� 1 39 1 0.841 1 0 0.661 0.835 0.982 Peak Factor ^out In Total I�� 12 Ifi iS J RiChl Ttw Le 4 1 '+ 8I TNormt♦ 07707=0207:00ozm7=2 07.45 Un4Ntto0N m � r a .� �TF► Left Right 4 0 z4 a az Out le Total EAST FRONTAGE RD V •L. lU/ YL 1V 11 U"f 01 V ' jl UUUU ATD Services, Inc. 6214 Secrest Street Arvada, CO.80403 File Name : 25NB&PROSPECTPM Site Code : 99923778 Start Date : 02/06/2002 Page No : 2 NB PROSPECT t25 N8 PROSPECT sot,mbotn,a Westbound Northbound Eastbound Start Tune Left Thru Left Thru ��' left Thru �9h t Total Left -Mru Int t Total Total t Total t Total Peak HOW From U4:UU VM m U.1:43 rrr - remc a u1 a Intersectio 04:45 PM n Volume 0 0 0 0 0 108 11 219 465 2 Percent 0.0 0.0 0.0 0.0 90.8 9.2 94.3 0.4 High Int. 3:45:00 PM 05:30 PM 05:30 PM Volume 0 0 0 0 0 22 5 27 128 1 Peak Factor 0.850 out In Total 72r o a+ 0 0 0 Right Thnr Lan *'1L► 26 493 208 142 0 350 962 5.3 59.4 40.6 0.0 04:45 PM 05:15 8 137 S2 41 0 93 257 0.887 0.921 0.936 �BI°'I NI 0 n a 3 g7/06200217;70 $ 1O n unshm" aN�r ,-V—I o � *,Tr Left ,� TFru Right z 261 �1 493 493 Out In TOW 25 Na W u4/ 1J uc 10:11 FA 04 V 4" ATD Services; Inc. ' 6214 Secrest Street Arvada, CO. 80403 File Name : 25NB&PROSPECTAM Site Code : 99923778 ' Start Date : 02/06/2002 Page No : 2 StartTune } Left I Thru eak Four From 07.00 AM to 08A 1ntersectio 07:00 AM n Volume 0 0 0 - Percent 0.0 0.0 0.0 High Int. 6:45:00 AM Volume 0 0 0 Peak Factor Righ APP• �' Le-tI ThN Right APR• left Thnr LeR ThN t Total Total - PWK 1 Or 1 0 0 132 27 159 635 1 22 658 65 99 0 164 981 0.0 83.0 17.0 96.5 0.2 3.3 39.6 60.4 0.0 07:45 AM 07:30 AM 07:30 AM 07:30 0 0 34 7 41 189 1 5 195 20 24 0 0.846 0• 0 944 0.280 Out to TOM B] 0 Ol Ul B got TM LAB 4J1L+ Dw ,pv� T t jR NOflh t U—� 2 ouoreoaz BroB M 07 N 1p s� .� o 9WQ -1 --:� T F+ Left Thn, p4t dam t 22 �nT Out 1n TOW m NO I V 'l/ 1JI UL xu.ly 11[Y JI V SV. VJVJ ♦•11� J1..1\"Ll\V!l:• V1\v�. ATD Services, Inc. 6214 Secrest Street Arvada, CO.80403 File Name : 25SB&PROSPECTPM Site Code : 99923778 Start Date : 02/06/2002 Page No : 2 SB PROSPECT l25 SB PROSPECT Southbound Westbound Northbound Eastbound Start Time LeR Thru " " Left Thru w9h LeR Thru � APP• t Total Left Thru Righ t t Total t Total PeaK r4our from u4:W m uu uima rrl - r n • v, Intersectio 04:45 PM Volume 13 0 135 148 32 537 0 Percent &B 0.0 91.2 5.6 94.4 0.0 Nigh int. 05:30 PM 05:30 PM Volume 4 0 38 42 12 150 0 Peak Factor 0.881 569 0 0 0 0.0 0.0 0.0 3:45:00 PM 162 0 0 0 0.878 old In TOW 14e us A� Leh 4J 1 L+ T NOM 02AW2M 1 :45 02M@I 0217:30 kahHw ~l I r+ Leh MM mod 0 6 0 661 0 661 in T" QS S5 0 0 324 629 0.0 34.0 66.0 05:00 PM 0 0 83 159 V r 9 App. InL Total Total ' 953 1670 05:30 242 446 0.961 0.936 U-+ / 10/ U4 10. lU 1' A t/ 1 U 404 0000 arxu%-DttVnn ATD Ser IceSI; Inc. 6214 Secrest Street Arvada, CO.80403. File Name : 25SB&PROSPECTAM Site Code : 99923778 . Start Date : 02/06/2002 Page No : 2 Start Time Left Thru Rtgh T� Left I Thn l � I Toml f Left I Thn ` w9c IT�I ' I Left I Thru 1 �y � � Totai � Total eak Hour From 07:00 AM to 08:45 AM - Peak 1 of 1 Intersectlo 07:30 AM n Voiume 4 1 241 246 46 709 0 755 0 0 0 0 0 164 404 568 1569 Percent 1.6 0.4 98.0 6.1 93.9 0.0 0.0 0.0 0.0 0.0 28.9 08:00 AM 71.1 07:30 High InL 07:30 AM 07:30 AM 6:45:00.AM 0 0 0 38 98 136 Votume 3 1 70 74 10 206 0 216 0 0 0.899 0.426 Peak Fador 0.831 0.874 125 sa Qp In TOW 24 24a 2N 1 4 Rq Tern Lett 4j 1 L+ o� T o m s = � 02mer2m0720 /--- e s 021OWN20e:t5 lUmtftd -1 o ap So 8 +n T r eeO 451 0 451 out IN TOW 12556 q 03 10i uc 10: iu roe a, 0 toe 0000 1c. r. uttuw �l.vu. v.. .. ATD Services, Inc. 6214 Secrest Street Arvada, CO.804031e Name : WFRONT&PROSPECTPM Site Code : 99923778 Start Date : 0210712002. Page No :2 WEST FRONTAGERD PROSPECT wrwrnvmi^��� Eastbound Southbound Westbpund Nortbound left Thru Wgh Ate' LeR Thu Rgh App. Left Thru �9h App' Lef 11vu Righ t App. tnt. Total Total Start Time t Total t Total t Total PeaK Hour rrom Iw:w rM m ua:-r3 M7 - rcan , �• , intersectio 05:00 PM n Volume 25 0 120 145 2 606 27 637 5 0 4 9 57 960 3 1020 1811 Percent 17.2 0.0 82.8 0.3 95.4 4.2 55.6 0.0 44.4 5.6 94.1 0.3 High Int. 05:15 PM 05:15 PM 05:45 PM 05:00 PM 05:00 Volume 8 0 30 38 0 158 8 166 2 0 0 2 18 263 1 282 468 Peak Factor 0.884 0.942 0.563 0.904 0.928 Out In TOW ® 1 1 0 25 faR Left ,j 1 L+ T t o� NOAh w� O s ' °• a omo� tTroO �_ � oaoTrm0217'.40 s ^ lUn3hred pCQ u 4,T[4 Left Ttw Rift fil 01 4 Y 14 Out In Total WEST FRONTAGE RD I U4/ la UL io. vo r. v, v YOL uJuo LnL ATD Services, Inc. ' 62U Secrest Street Arvada, CO.804031e Name : WFRONT&PROSPECTAM Site Code : 99923778 Start Date : 02/07/2002 Page No : 2 W EST FRONTAGE RD PRO CT RD WEST FR GE RD PROSPECT RD Eastbound Southbound Westbound Northbound APp. Righ App- Int. Righ App. Righ ARP. start TMe Left Thru Total Left Thm t Total "'t' Left 7hru t Total Left Thru t Total Total t PeaK hour From ui:w wm m uo:nj t Intersecto 07:15 AM Volume 6 0 27 33 3 926 33 962 5 2 3 10 60 574 2 636 1641 Percent 18.2 0.0 81.8 0.3 96.3 3.4 50.0 20.0 30.0 9.4 90.3 0.3 07:30 High Int. 07:15 AM 07:30 AM 07:30 AM 07:15 AM 130 0 143 434 ' Volume 0 0 4 4 1 274 8 283 0.850 1 1 2 4 0.625 13 0.393 0.945 Peak Factor 0.688 Out in Toll ® 93 12a 27 0 a RpN TIIN Lelt 4J 1 L+ fs-1 0 �m A, T w NO h (_ S m 2� 07/07/2002 07:15 '--.— �w "' 02107120020e:00 VlmhiRed � +,Tr ten Tlvu R10t 5 2 31 F-5l 10 15 Out In TOW WEST FRONTAGE RD APPENDIX B M Attachment "B" Transportation Impact Study Pedestrian Analysis Worksheet Origin ,ReqRes Inst Ofc/Bus..'- c6ni'. Ind Other (Project Site-(Speecify).) 'Recreation r `Commercial 4fid ukii A Other '-Y List the pedestrian destinations within 1320' (1.5 miles for schools) of the project boundary in the spaces above. The pedestrian Level of Service for the facility/corridor linking these destinations to the project site will be based on the directness, continuity, types of street crossings, walkway surface condition, visual interest/amenity, and security of the selected route(s). Larimer County Urban Area Street Standards January 2,2001 3 No Text SCALE: 1'=1000' ' PEDESTRIAN/BICYCLE INFLUENCE AREA Attachment "A" Transportation Impact Study Base Assumptions Project Information :. Project Name tFACA 1GNt ?Ro?roe -rtES Project Location $E CoRMSe of �'-ZS t'RoSPc�GT TIS Assumpt.±Dus Type of Study Full: SJG S Intermediate: ,(J p Study Area Boundaries North: PQo3ASC-r South: 5,-tC- East: CA Sr `-R. Qe A O West: WG S-r Fe. "A b Study Years Short Range: Pop 6S ') Long Range _020 Future Traffic Growth Rate P469 AICZT F2ortJTA6 FLAN Study Intersections 1. All access drives 5• ,eosPerr GF. 2. �KoSPEcT��/. F. i' . 6. 3• �2oSPG-zT �s f33 �a.H A s 7. 4. `gosPFrcr1AJ6 12AAA PS 8. Time Period for Study AM: 7:00-9: I Sat Noon:,vo Trip Generation Rates Pep- _T Tc,: Trip Adjustment Factors Passby: P&p ZTe- Captive /,vTeQ -VAL- Market: AlomIAIAc, Overall Trip Distribution AT-(AcoC-;P North South East West Mode Split Assumptions A1A Committed Roadway Improvements AS5VMG /AAV1Z0v,9m&A1r3 To bura)eev.A S&KtcAR To I4A1eMealY Other Traffic Studies :4p ,,- sT,az Areas Requiring Special Study /F;�Osru-T Date: $1, / 0 2 Traffic Engineer: Local Entity Engi Larimer County Urban Area Street Standards January 2, 2001 2 APPENDIX A I IV. CONCLUSIONS This study assessed the impacts of the Paradigm Property on the long range (2025) street system in the vicinity of the proposed development. This is a master transportation impact study, as is appropriate at the overall development plan submittal. When any portion of the Paradigm Property is submitted as a preliminary development plan, a transportation impact study will be prepared. As a result of this analysis, the following is concluded: The development of the Paradigm Property is feasible from a traffic engineering standpoint. At full build -out, the Paradigm Property will generate approximately 11,510 daily motor vehicle trip ends, 973 morning peak hour motor vehicle trip ends, and 877 afternoon peak hour motor vehicle trip ends. Some of these will be passby trip ends. A significant portion of the trips will be oriented to/from I-25. - Current operation at the Prospect/SB I-25 Ramp and Prospect/EFR intersections is acceptable. Current operation at the Prospect/ WFR and Prospect/NB I-25 Ramp intersections is unacceptable. Acceptable operation at an arterial/arterial signalized intersection during the peak hours is defined as level of service D or better overall. Acceptable operation at stop sign controlled intersections during the peak hours is defined as level of service E for any approach leg. Peak hour signal warrants are expected to be met by/before the long range (2025) future at all of the existing key stop sign controlled intersections. With the long range (2025) background traffic, the key intersections will operate acceptably. In the long range future, given full development of the Paradigm ' Property and an increase in background traffic, the key intersections will operate acceptably. The long range geometry is shown in Figure 9. ' - Pedestrian and bicycle level of service analyses should be addressed at the time of a preliminary development plan submittal. ' At the present time, there are no pedestrian or bicycle destinations within 1320 feet of the Paradigm Property. This area is not served by Transfort, nor will it be served by Transfort in the future, according to the Fort Collins Transit Plan. 1 21 The Fort Collins policy regarding adequate public facilities is that if a development generates less than 10,000 trip ends per day, the ' subject intersection must be less than one mile from the site to be an adequate public facilities concern. The Paradigm Property is greater than one mile from the Prospect/Timberline intersection. At full ' development (Table 2), the trip generation will be greater than 10,000 trip ends per day. However, a significant number of these trip ends will be oriented to/from I-25. In addition to this, a PDP proposal for the Paradigm Property would likely be for a portion of the ODP site, which would generate less than 10,000 trip ends per day. Therefore, it is not likely that a PDP proposal for the Paradigm Property would have an adequate public facilities issue pertaining to ' the Prospect/Timberline intersection. There is currently an engineering study underway for improvement ' to Prospect Road between the Cache la Poudre River and Summitview Drive. This is currently a two-lane road segment with a rural cross section. That engineering study is evaluating an improved two-lane cross section and the ultimate four -lane cross section. This will present an opportunity for improved operation in this segment of Prospect Road and at the Prospect/Summitview intersection. It is expected that Prospect Road will have a four -lane cross section, as ' shown on the Fort Collins Master Street Plan, by/before the long range future. 20 1 appropriate to address pedestrian level of service in a master TIS. A detailed pedestrian level of service analysis will be provided in the ' PDP TIS. Bicycle Level of Service There are currently no bicycle destination areas within 1320 feet ' of the Paradigm Property. There are also no existing bicycle facilities within this area. The Fort Collins Bike Map shows that there will be on -street bike lanes along Prospect Road and along I-25. It is not appropriate to address bicycle level of service in a master ' TIS. A detailed bicycle level of service analysis will be provided in the PDP TIS. Transit Level of Service ' Currently, this area is not served by Transfort. The Fort Collins Transit Plan indicates that this area will not be served by Transfort in the long range future. Therefore, a transit level of service analysis is not required. 1 Other Issues tIn the scoping meeting for this transportation impact study, two issues were mentioned. These were: the adequate public facilities ' concern regarding the Prospect/Timberline intersection, and improvements to Prospect Road between the Cache la Poudre River and Summitview Drive. Based upon recent peak hour traffic counts at the Prospect/Timberline intersection, it has been determined that this intersection operates unacceptably. The transportation impact study ' guidelines indicate that significant impact is defined in Section 4.5.2.A.2 in the "Larimer County Urban Area Street Standards," as follows: "When the background traffic conditions (without project traffic) causes an intersection to fail the minimum acceptable level of service standards; and when the project traffic causes more than a 2 percent increase in the intersection delay." As,.has been recognized by the City of Fort Collins, the Prospect/Timberline intersection is currently geometrically deficient. It does not take much site generated traffic to cause a greater than 2 percent increase in delay at this intersection. It is expected that by/before the long range ' future (2025), there will be appropriate geometric improvements at the Prospect/Timberline intersection, such that it will operate acceptably. As such, this intersection will not present adequate public facilities concerns in the long range future. However, when a PDP proposal is put forth for any portion of the Paradigm Property, the Prospect/Timberline intersection may need to be analyzed at the condition that it exists at the time of that development proposal. 19 L to N N w w N L N C C C m Ca O Cm Q 2 m f0 lr` � l0 C �m 0 C O L d LL w w Prospect CO N N o 0 2 � c H +-- - Denotes Lane LONG RANGE (2025) GEOMETRY Figure 9 TABLE 4 Long Range (2025) Total Peak Hour Operation Wye (signal) NB c c 17 0 0 m w 0 LL >(D 3 O Ln Ln � o v 435/430 I� ``' �-1220/865 30/50 200/205 820/1230 0 CD I I 10/20 0 0 Ln LO N w w w CO IV �y N-1335/1115 290/230 190/145 870f750 Prospect 640/865 775/805 555/850 790/5 665/720 —am-10 o/ 200/215 o� o 0 A 0) � U Q S O Z ~ H 7A LONG RANGE (2025) TOTAL PEAK HOUR TRAFFIC 4 N 0 0 Cu CP U- N N W o 11 on5 IN Ln f1 �— 655/405 J j � 175/130 25/50 —f 480/595 i 300/180 a N W N M --w— AM/PM Rounded to Nearest 5 Vehicles Figure 8 TABLE 3 Long Range (2025) Background Peak Hour Operation • .... �rr ��1� /.�^� .�. C � �' � hyc i,.ri� 4i`"y^ ri�5` iZ A Ky(��-Z f3^�+hs -�4F G [Sl,�i.^���2yJ��v`j r .. "vt_.i>n A h ....�5 lx X+v ..�` �, c)4 Z .f-(�'_�.Y 4{i� ii xw� R��R` sa'u> �4 +.+,w� .� n.}a.�T. �.`Y. lt'.J..t 'T t a's fr'i v C i•. �;�?.S t A `F*'1'y�=f, M1 t NAY d. �a l9 3�+' 4 3 W.,y t4 U IV Prospect/WFR (signal) EB B C WB C B NB C C SB D D OVERALL C C Prospect/SB 1-25 Ramp (signal) EB A B WB B B SB C C OVERALL B B Prospect/NB 1-25 Ramp (signal) EB B B WB B B NB C C OVERALL B C Prospect/EFR (signal) EB B B WB B B NB C C SB C C OVERALL B B 16 a (9 0 a� rn c 0 LL N 3 coo 420/415 o " + � t 1150/785 30/50 � 200/205 1 720/1170 —a— 10i20 o o 0 0 �o C 0 CZ hV o / 210/135 135/85 590/430 520/790 —� 555/850 1901365 405/530 —.► N� FQ m da 2m LONG RANGE (2025) BACKGROUND PEAK HOUR TRAFFIC Prospect 10/40 465/585 —.► 55/65 -►-- AM/PM Rounded to Nearest 5 Vehicles a m 0 N 110/75 — 685/440 ./--- 105/70 NO- Ln O 0 a Q C N 0O n Figure 7 the resultant of the trip distribution process. Figure 7 shows the site generated peak hour traffic assignment of The Paradigm Property. Figure 8 shows the long range (2025) total (site plus background) peak hour traffic at the key intersections. Signal Warrants As a matter of policy, traffic signals are not installed at any location unless warrants are met according to the Manual on Uniform Traffic Control Devices. It is expected that peak hour signal warrants will be met by/before the long range (2025) future at all of the key stop sign controlled intersections. Operation Analysis Capacity analyses were performed at the key intersections. The operations analyses were conducted for the long range (2025) analysis. Using the traffic volumes shown , in Figure 6, the key intersections operate in the long range background condition as indicated in Table 3. Calculation forms for these analyses are provided in Appendix D. The key intersections will operate acceptably during the peak hours. Using the traffic volumes shown in Figure 8 and recommended geometrics, the key intersections operate in the long range total condition as indicated in Table 4. Calculation forms for these analyses are provided in Appendix E. ' Geometry The long range (2025) geometry is shown in Figure 9. This geometry assumes that the I-25/Prospect interchange will remain as a diamond interchange. The interchange itself would look similar to the I-25/Harmony interchange, except that the frontage roads would be further away from the ramps at the Prospect Road interchange. Other potential -interchange configurations would be part of a regional undertaking and are beyond the scope of a TIS for a specific development. Pedestrian Level of Service Appendix F shows a map of the area that is within 1320 feet of the Paradigm Property site. There is currently one pedestrian destination within a quarter mile of the Paradigm Property. This is the small commercial/industrial site to the south of the Paradigm Property. There are no pedestrian facilities along any of the streets/roads within the pedestrian influence area., It is not IW91 O ` �— 66/76 101/60 — N N w N w N cm 137/156 79/93 121 /74 -i 259/187 —► N� FQ d� 2� SITE GENERATED PEAK HOUR TRAFFIC 55/61 f 278/317 Pros) 243/114 200/213 f Qj ^a (o ^A`�' N to y U Q O Q' C H rn f— -31 /-34 72/59 12/10 f r 15/10 —► 243l114 —y N 00 v co Ln M --a*— AM/PM Figure 6 v o m M �o o 0 c u_ ° .. �m y �O u_ m w 0 0 u7 O ° -f� Prospect 10/o � ° � O / \ / Z / \ Z Site � .0000, 0 O M NOTE: Passby traffic for appropriate land uses in the Paradigm Property is primarily related to 1-25 ramp traffic. TRIP DISTRIBUTION Figure 5 TABLE 2 Trip Generation g� 17 WN -!u�rtRll 160�1 Parcel A 832 Sit-down Restaurant 6.5 KSF 1 130.34 1 850 14.82 31 4.45 29 6.52 42 4.34 28 Parcel B 832 Sit-down Restaurant 7.5 KSF 1 130.34 1 980 14.82 1 36 14.451 33 16.52 1 49 1 4.34 1 33 Parcel C 846 Gas/C-store 12 positions. 152.84 1 1830 5.43 65 5.21 63 6.60 79 6.60 79 Parcel D 834 Fast-food Restaurant 3.6 KSF 496.12 1 1790 25,43 92 24.43 88 17.41 63 16.07 58 Parcel E 320 Motel 64 rooms 5.63 1 360 0.17 11 0.28 18 0.25 16 0.22 14 Parcel F 320 Motel 66 rooms 5.63 1 370 0.17 11 0.28 18 0.25 17 0.22 15 Parcel G 814 Specialty Retail 20.5 KSF 40.67 1 830 1.92 39 1.44 30 1.11 23 1.48 30 Parcel H 770 Officemarehouse 24.6 KSF 12.76 1 310 1.20 30 0.23 6 0.30 7 0.99 24 Parcel 1 770 OfficeMarehouse 32.7 KSF 12.76 1 420 1.20 39 0.23 8 0.30 10 0.99 32 Parcel J 814 Specialty Retail 16.1 KSF 40.67 1 650 1.92 31 1.44 23 1,111 18 1.48 1 24 'Parcel K 814 Specialty Retail 46.1 KSF 40.67 1 1870 1.92 89 1.44 66 1.11 F-51 -r1-48-] 68 Parcel L 770 Office/warehouse 36.7 KSF 12.76 1 470 1.20 44 0.23 8 0.30 11 0.99 36 Parcel M 814 Specialty Retail 33.3 KSF 40.67 780 1.92 37 1.44 28 1.11 21 1.48 29 Total 11,510 1 555 1 418 1 407 1 470 10 w SITE PLAN PRQ.0PrrT RQAD ARTERIAL STREET C-STORE FAST FOOD FUEL SALES SITE CAR WASH RESTAURANT SITE SITE C D MOTEL SITE A o �y MOTEL N SITE RESTAURANT SITE C 0o r o RETAIL O000000 a SITE 0 OPEN SPACE � d3 STORM OFFICE/ RETAIL /'� DRAINAGE WAREHOUSE V' V SITE SITE t`Q 2 OFFICE/ 0 WAREHOUSE I 4 SITE ' V EXISTING u RETAIL n N SITE 0 OFFICE/ WAREHOUSE RETAIL SITE M SITE K L RETAIL SOUTHEAST FRONTAGE ROAD COLLECTOR ST A& N NO SCALE Figure 4 III. PROPOSED DEVELOPMENT The Paradigm Property is a commercial development, located east of ' Interstate 25 and south of Prospect Road in Fort Collins. Figure 4 shows a site plan of the Paradigm Property development. The development, at the ODP level, will consist of two sit-down restaurants, a fast-food restaurant, a gas/convenience store with 12 fueling positions, two motels, 116,,000 square feet of retail, and 94,000 square feet of office/warehouse. The site plan shows that the site will be accessed via two site accesses to the EFR, and one RT-in/RT-out access to Prospect Road. Since this is an ODP level transportation impact study, a short range analysis was not required. The long range future was assumed to be the year 2025. Trip Generation Trip generation is important in considering the impact, of a development such as this upon the existing and proposed street system. A compilation of trip generation information contained in Trip Generation, 6th Edition, ITE was used to estimate trips that would be generated by the proposed/expected use at this site. Land use codes 832 (Sit-down Restaurant), 834 (Fast-food Restaurant), 846 (Gas/C-store), 320 (Motel), 814 (Specialty Retail), and 770 (Business Park) were used. Table 2 shows the expected trip generation on a daily and peak hour basis. It should be noted that passby trip factors were applied to various land uses within the Paradigm Property. Trip Distribution Directional distribution of the non-passby site generated trips was determined for the Paradigm Property based upon the existing traffic volumes, the location of trip productions for this type of land use, and engineering judgment. Figure 5 shows the trip distributions used for the following analyses. Passby trip adjustments were primarily applied to interstate ramp volumes. Background Traffic Projections Figure 6 shows the long range (2025) background traffic projections. Background traffic projections for the long range future horizon were determined by reviewing traffic forecasts and traffic studies performed for other developments in this area of Fort Collins, review of forecasts in the "North Front Range Regional Transportation Plan, and contact with the North Front Range Transportation & Air Quality Planning Council. Trip Assignment Trip assignment is how the generated and distributed trips are expected to be loaded on the street system. The assigned trips are 8 TABLE 1 Current Peak Hour Operation \rr �}}'��`R ri±' ��§"�}'tG 4 }'4 �{..u^r'�.}� .{�,ry�-l� i #i` W[..���1 1)�f/�t 1 k" ' �,�••Il '19�N��tJ �I�1 ��1111�� �h� $= he. ProspectNVFR (stop sign) NB LT/T/RT F F SB LT/T/RT E F EB LT B A WB LT A B Prospect/SB 1-25 Ramp (stop sign) SB LT D D SB RT E B SB APPROACH E C WB LT A B Prospect/NB 1-25 Ramp (stop sign) NB LT F F NB RT A A NB APPROACH F F EB LT A A Prospect/EFR (stop sign) NB LT/T/RT A B SB LT/T/RT B B EB LT A A WB LT A A Existing Operation The key intersections were evaluated using techniques provided in the 2000 Highway Capacity Manual. Using the volumes shown in Figure 3, the peak hour operation is shown in Table 1. Calculation forms are provided in Appendix C. A description of level of service for signalized and unsignalized intersections from the 2000 Highway Capacity Manual and the Fort Collins Motor Vehicle LOS Standards (Intersections) are also provided in Appendix C. The Prospect/SB I-25 Ramp and Prospect/EFR intersections operate acceptably during both the morning and afternoon peak hours. The Prospect/WFR and Prospect/NB I- 25 Ramp intersections operate unacceptably during the peak hours. Acceptable operation at signalized intersections during the peak hours is defined as level of service D or better overall. Acceptable operation at stop sign controlled intersections during the peak hours is defined as level of service E for any approach leg. Pedestrian Facilities There are no sidewalks in this area of Fort Collins. Bicycle Facilities There are limited bicycle facilities along Prospect Road. There are limited bicycle facilities along the EFR and the WFR. Transit Facilities Currently, this area does not have transit service. 2 N O Q' N N C O LL >N O n oCn 31 /29 N O so — 922/624 3/2 �l 60/57 -� 1 I I I 567/974 2/3 Q o g L a M MI. COO) N a f 713/537 1 / 48/34 27/12 13 132/112 162/331 — 414/670 67/206 99/138 —► �o, ry N N �o BALANCED RECENT PEAK HOUR TRAFFIC Prospect —*-- AM/PM A& N 5/4 --m- 150/95 .— 4/4 Figure 3 cc NO LL C 0 LL N O o Ul) 33/27 4 o m f_ 126/606 3/2 60/57 1 I I 574/1020 2/3 LQ a M 01. vJ� M 709/537 / T 46/32 27/11 132/108 164/324 —� 404/629 65/208 99/142 -�1(01�3 ir N RECENT PEAK HOUR TRAFFIC 4 N m O Qi c w C 0 U- N w C coo 5/4 `n M v 149/97 4/4 Prospect 2/16 f � 100/123 —► 17/18 a a --*-- AM/PM Figure 2 SCALE: 1 "=3000' ' SITE LOCATION Figure 1 3 II. EXISTING CONDITIONS The location of the Paradigm Property site is shown in Figure 1. It is important that a thorough understanding of the existing conditions be presented. ' Land Use Land uses in the area are primarily residential, vacant, and commercial. Residential uses, exist to the north, across Prospect Road, and to the east. Commercial uses exist north and northwest of the site, along both the West Frontage Road and the East Frontage Road. There are intermittent vacant parcels of land between more active parcels. Some of these are in agricultural use. The center of Fort Collins lies to the west of the Paradigm Property. Roads The primary streets near the Paradigm Property site are Prospect Road, the West Frontage Road (WFR), the Southbound I-25 Ramp, the Northbound I-25 Ramp, and the East Frontage Road (EFR). Prospect Road is to the north of the Paradigm Property site. It is an east -west street designated as a four -lane arterial street on the Fort Collins Master Street Plan. Currently in this area, Prospect Road has a two- lane cross section. There are limited bicycle facilities on Prospect Road. The posted speed on Prospect Road, east and west of the I-25 Interchange, is 45 mph. At the I-25 Interchange, the posted speed on Prospect Road is 35 mph. At the key intersections, Prospect Road has single lane approaches. ' The EFR and WFR are approximately 1000 feet from the respective NB I-25 Ramp and SB I=25 Ramp. The Prospect/EFR and Prospect/WFR intersections have stop sign control on the EFR and WFR. The Frontage ' Roads have single lane approaches. The NB and SB I-25 Ramps intersect Prospect Road and are controlled by stop signs. The ramps have one lane approaches, however there are functional right -turn flares on each ramp. Existing Traffic Recent peak hour counts at the Prospect/WFR, Prospect/SB I-25 Ramp, Prospect/NB I-25 Ramp, and Prospect/EFR intersections are shown in Figure 2. Raw traffic count data is provided in Appendix B. The traffic data at the key intersections was collected in February 2002. ' Since these counts were collected on different days, the traffic between the intersections was balanced and is shown in Figure 3. 2 I. INTRODUCTION This transportation impact study addresses the capacity, geometric, and control requirements at and near the proposed development known as the Paradigm Property. The Paradigm Property site is located ' east of Interstate 25 and south of Prospect Road in Fort Collins, Colorado. ' During the course of the analysis, numerous contacts were made with the project developer (Paradigm Property LLC), the project planner (Hattman & Associates), the Fort Collins Transportation Planning staff, and the Fort Collins Traffic Engineering staff. This study generally conforms to the master transportation impact study (TIS) format set forth in the Larimer County Urban Area Street Standards, Chapter 4- Transportation Impact Study, January 2, 2001. This TIS is for an ' overall development plan (ODP) for the Paradigm Property. As such, it only covers full development of the site at the long range future (2 5) When a preliminary development (PDP) for an actual land use(s) is proposed, then a TIS will be required that will evaluate the impacts of just that proposal. That TIS will analyze the impacts in the short range future. As long as the PDP proposal is in substantial agreement with the land uses contained in this master TIS, a long range analysis ' will not be necessary in the PDP TIS. The base assumptions form and related information are contained in Appendix A. The study involved the following steps: - Collect physical, traffic, and development data; Perform trip generation, trip distribution, and trip assignment; ' - Determine peak hour traffic volumes; Conduct capacity and operational level of service analyses on key intersections; ' - Analyze signal warrants; Conduct level of service evaluation of pedestrian, bicycle, and transit modes of transportation. 1 LIST OF FIGURES Figure Page 1. Site Location ........................................ 3 2. Recent Peak Hour Traffic ............................. 4 3. Balanced Recent Peak Hour Traffic .................... 5 4. Site Plan ............................................ 9 5. Trip Distribution .................................... 11 6. Long Range (2025) Background Peak Hour Traffic ....... 12 7. Site Generated Peak Hour Traffic ..................... 14 8. Long Range (2025) Total Peak Hour Traffic ............ 15 9. Long Range (2025) Geometry ........................... 18 APPENDIX A Base Assumptions Form B Recent Peak Hour Traffic C Current Peak Hour Operation/Level of Service Descriptions D Long Range Background Traffic Operation E Long Range Total Traffic Operation F Pedestrian/Bicycle Influence Area TABLE OF CONTENTS Page I. Introduction ......................................... 1 II. Existing Conditions .................................. 2 LandUse ............................................. 2 Roads................................................ 2 Existing Traffic ..................................... 2 ExistingOperation ................................... 6 Pedestrian Facilities ................................ 6 Bicycle Facilities ................................... 6 TransitFacilities ................................... 6 III. Proposed Development ................................. 8 Trip Generation ...................................... 8 Trip Distribution .................................... 8 Background Traffic Projections ....................... 8 TripAssignment ...................................... 8 SignalWarrants ...................................... 13 Operation Analysis ................................... 13 Geometry............................................. 13 Pedestrian Level of Service .......................... 13 Bicycle Level of Service ............................. 19 Transit Level of Service ............................. 19 Other Issues ......................................... 19 IV. Conclusions .......................................... 21 LIST OF TABLES Table Page 1. Current Peak Hour Operation .......................... 7 2. Trip Generation ...................................... 10 3. Long Range (2025) Background Peak Hour Operation ..... 16 4. Long Range (2025) Total Peak Hour.Operation .......... 17 THE PARADIGM PROPERTY TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2002 Prepared for: Paradigm Properties, LLC P.O. Box 3236 Ventura, CA 93006-3236 Prepared by: MATTHEW J. DELICH, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: 9707669-2061 FAX: 970-669-5034 OQ U:��r cam: within surrounding highway and arterial streets, is a mixed -use development plan that provides 6.4 acres of highway business uses, 5.9 acres of office and retail (with warehouse) uses, and 9.4 acres of open space/storm drainage areas. These proposed land uses provide a logical, tiered transition from the I-25/Prospect Road interchange to the frontage road and; ultimately, to less intense land uses such as limited industrial, employment, and residential to the east and south of this property. Because the entire ON is within 1,320 feet (1/4 mile) of the centerline of I-25, all site specific project development plans will be subject to the adopted Development Standards for the I-25 Corridor set forth in Division 3.9 of the Land Use Code. .J Staff's Evaluation of the I-25 Subarea Plan As previously stated, the Paradigm Properties, ODP site is a part of a larger delineated Activity Center located at the I-25 and Prospect Road interchange on the "Draft" Land Use Plan in the Fort Collins I-25 Subarea Plan. This delineated Activity Center is on the east side of I-25 and consists of about 31 acres at the northeast corner of the interchange and about 150 acres at the southeast corner of the interchange, with both areas being in the Commercial Corridor. The Paradigm Properties, ODP is the northwest 23.8 acres of 150 acres (about 1/4 section) at the southeast corner of the interchange. The entire 23.8-acre ODP is in the C - Commercial Zoning District in the City of Fort Collins and the remainder of the 1/4 section is in Lorimer County (currently zoned Commercial and FA1 Farming). There are existing residential, commercial, and agricultural uses on the multiple properties in Lorimer County. In Section 5.2 Land Use Plan Objectives, Designation of Activity Centers in the I-25 Subarea Plan it states that activity centers are designated along I-25 at the Prospect Road and Mulberry Street (State Highway 14) interchanges. These areas are intended to evolve as concentrated areas of mixed -use development with high visibility and increased levels of activity, with more integrated appearance. The designated 180-acre Activity Center delineated on the east side of I-25 at the Prospect Road interchange is as follows: It is entirely in a Commercial Corridor in the Subarea Plan; • is entirely in a Commercial Corridor District on the City's adopted Structure Plan; • the properties currently within the City of Fort Collins are zoned C - Commercial; and • the properties currently within Lorimer County are zoned C - Commercial and FA1 - Farming. The Commercial Corridors and Commercial Districts do not preclude a broad range of a mix of uses that may look like and function as an "activity center". The Paradigm Properties, ODP, being a 24-acre parcel almost completely contained H Policy I-25-LU-1.1 The I-25 subarea will focus on several activity centers surrounded by residential neighborhoods. Activity centers should be designed so that new development can support efficient alternative modes of transportation. Activity centers should provide a mix of urban uses, including employment, commercial, and residential area. - C. Community Appearance and Design Principle I-25-CAD-1: The subarea's community entryways from I-25 should be designed to create a sense of place and positive entry experience. Policy I-25-CAD-1.1 Development in the subarea will provide for attractive gateways to the City from the subarea's I-25 interchanges and overpasses at Harmony Road, Prospect Road, Mulberry Street, Vine Drive, Mountain Vista Drive, and Carpenter Road, and their arterial corridors leading in from the highway. • Locational Standards for Activity Centers and Industrial Zoning - Both the Regional Corridor Plan and the I-25 Subarea Plan call for Activity Centers to be located in geographic specific locations. To implement these placement standards, changes need to be made to the Employment and Commercial zone districts. Since there is Industrial zoning within the subarea as well, an applicability cross- reference will be added to the zone district standards. The proposed solution is to add standards to the Employment and Commercial districts that state that any development within one - quarter mile of the I-25 right-of-way shall be subject to the new Development Standards for the I-25 Corridor. • Section 6.3 Street Network and Functional Classifications The Draft Recommended Roadway Network Plan and the Proposed Corridor Improvements Plan in the I-25 Subarea Plan identify East and West Prospect Road to improved to a 4-lane arterial roadway. Improvements to East Prospect Road are only to be for the 1 mile section between I-25 and County Road 5. • Section 6.5 Bicycle Routes The Recommended Bike and Transit Network Plan in the I-25 Subarea Plan does not show a Bicycle Route out to the I-25 & Prospect Road interchange. The closest bicycle routes to this area are on East Mulberry Street and along the Cache La Poudre River. • Section 6.6 Transit Service The Recommended Bike and Transit Network Plan in the I-25 Subarea Plan does not show Feeder Transit service to the I-25 & Prospect Road interchange. There is only Regional Transit shown along I-25. The Subarea Plan does indicate that transit services within the subarea will be provided consistent with the 2010 Transit Service Levels identified in the Transfort Strategic Plan (2002). As land use intensifies within the I-25 corridor, future analysis will determine appropriate transit service within the subarea. The area will likely contain additional Transit Center/Park and Ride facilities located at or near the I-25 interchanges. • Section 7.3 I-25 Subarea Principles and Policies A. Land use Principle I-25-LU-1: The I-25 subarea will have a balance of residential, commercial, employment, and civic land uses and facilities. R� Employment/Industrial Districts • The existing Anheuser Busch facility, and other industrial and business uses located in the vicinity of Highway 14, establish the core of future industrial and employment uses in the I-25 corridor. All planned employment/industrial areas east of I-25 are located within 1/2 mile of the highway, with most being located within 1/4 mile of the highway. • Section 5.3 Zoning Plan C - Commercial: A district for the location of community and regional retail uses, offices, and personal and business services. The zone also permits creative forms of housing. E - Employment: A district for the location of light industrial, research activities, offices and institutions. Supporting uses such as hotels, restaurants, convenience shopping, child care and housing are also permitted. Supporting uses will not be allowed within 1/4 mile of the I-25 highway. I - Industrial: A zone for the location of manufacturing, warehousing and distribution, indoor and outdoor storage, and a wide range of commercial and industrial operations. Supporting uses such as convenience shopping, child care and housing are also permitted. Supporting uses will not be allowed within 1/4 mile of the I-25 highway. 5 • The I-25 subarea will be unique to Fort Collins, combining a mix of uses including residential and commercial development, and open' lands. Care will also be given to incorporating land use patterns in the subarea into the larger Fort Collins community. The development pattern will be clearly thought out, allowing for a compatible mix of uses, both existing and planned, while avoiding the wall-to-wall commercial development that is commonly seen elsewhere along interstate corridors. • Commercial uses in the subarea will combine a variety of business types and sizes, allowing for a range of commercial activity and job opportunities. The subarea will have planned commercial and employment centers as well as areas for smaller business operations. • Section 5.2 Land Use Plan Objectives Designation of Activity Centers. The I-25 Subarea Plan designates activity centers along I-25 at the Prospect Road and Mulberry Street (State Highway 14) interchanges. These areas are intended to evolve as concentrated areas of mixed -use development with high visibility and increased levels of activity, with more integrated appearance. • Section 5.3 Land Use Classifications - Commercial Corridors • Commercial Corridor areas near the I-25/Prospect Road interchange are, for the most part undeveloped. While this classification is typically the location for highway business and auto -related uses, they also represent opportunities over time to transform existing developed areas into mixed -use, multi - modal centers which relate better to the overall community vision for Fort Collins. 4 • Section 2.3 Existing Structure Plan and Zoning Patterns In the Existing Structure Plan section it states, in part, that "The existing Structure Plan (adopted as a component of City Plan) for the subarea envisions a series of areas of activity along the I-25 corridor (see Structure Plan map). These areas of activity include the Harmony Road employment corridor, major employment and commercial uses at Prospect Road, existing commercial and industrial uses at I-25/Mulberry Street (Highway 14), and a major employment/industrial district with supporting commercial uses at Mountain Vista Drive". • Section 3.2 Land Use In the Pattern of New Development section it states, in part, that "The Northern Colorado Regional Communities I-25 Corridor Plan promoted the concept of "activity centers" to be the focal points for intense mixed -use development and the promotion of alternative modes of transportation. The specific location of these activity centers falls to this I-25 Subarea Plan". • Section 3.5 Community Image and Design - In the Interchange Area Development section it states "The planning area includes all of the major gateways and corridors into the City from I-25. Consideration should be given to how the character and design of commercial areas, especially at Prospect and Mulberry, relate to community entranceways. Also, which interchanges are appropriate to become the location of activity centers to be the focal points for intense mixed -use development and the promotion of alternative modes of transportation". • Section 4.2 I-25 Subarea Plan Vision The Vision describes the general overall land use scenario for the subarea when it is built out. 3 • In the Land Use Goals it states, in part, that "The I-25 Subarea will have planned commercial and employment centers that provide- central locations for commercial uses". • In the Executive Summary it states, in part, that: - "Two mixed -use activity centers are identified for the planning area, one at the I-25/Mulberry Street interchange and the other at the I- 25/Prospect Road interchange. The northeast quadrant of the I- 25/Mulberry Street interchange is also planned for the potential location of a regional/community shopping center". "Employment and industrial districts adjacent to I-25 are to be designed in such a manner as to maintain a perception of openness through the corridor". "Secondary uses (retail and highway oriented commercial uses) typically permitted in industrial and employment districts will be required to be set back at least on -quarter (1/4) mile from I-25 in order to avoid the development of a "commercial strip" appearance along the highway". - "Low -density, detached single-family residential development is to be prohibited within one -quarter (1/4) mile of I-25 through various means, including zoning patterns and land use restrictions". • Section 2.2 Existing Land Use Patterns This section, in part, states that "The primary clusters of non- residential urban development include a mix of commercial and industrial uses at the I-25/Mulberry Street (Highway 14) interchange, some limited commercial uses along the frontage road at the I-25/Prospect Road interchange, and urban residential development at Waterglen, located north of Vine Drive adjacent to I- 25, and along Mulberry Street east of the highway". 2 City of Fort Collins Comn. Aty Planning and Environment:. .ervices Current Planning MEMORANDUM Date: January 15, 2004, Public Hearing To: Planning and Zoning Board Members From: Stephen Olt, Current Planning,,O, Re: Paradigm Properties, Overall Development Plan (ODP) - #29-01A The Paradigm Properties, ODP was discussed at the October 16, 2003, Planning and Zoning Board public hearing. This is a 23.8-acre ODP containing commercial, office, lodging, restaurant, and retail uses at the southeast corner of the Interstate 25 (I-25) and Prospect Road interchange. Approximately 98% of the ODP (23.4 acres of the total of 23.8 acres)is contained within the surrounding street network of I-251 East Prospect Road, and the Frontage Road. The property is zoned C - Commercial in the City of Fort Collins and is in the Commercial Corridor District on the City's adopted Structure Plan. As part of the discussion during the public hearing on October 16th, a member of the Planning and Zoning Board suggested that this property is identified as an Activity Center in the Fort Collins I-25 Subarea Plan. It is shown to be only a part of a larger delineated Activity Center on the "Draft" Land Use Plan in the Subarea Plan. This delineated Activity Center is on the east side of I-25 and consists of about 31 acres at the northeast corner of the interchange and about 150 acres at the southeast corner of the interchange, with both areas being in the Commercial Corridor. • In the I-25 Subarea Vision it states, in part, that "Commercial uses in the I-25 Subarea will combine a variety of business types and sizes allowing for a range of commercial activity and job opportunities". 281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020 i l PARCEL-S MOTEL THREE STORY 16.000 S.F. 6 �S0 UK / SITE PARCEL - 4 j SOA25 6 MOTEL S.P. THREE STORY �� _ / 1000UNITSF SITE 1 � (_,_ S� O S.F. -PARCEL-3 000 0000 IUE �irfl9'.2'.R'LY•�dCPai9'J'a1L7PtS .""" VZ7tPb _ E�.l'JrLP.i ..4 ARTERIAL STRGET_._. 0-60 000QQFI 4RCEL-L UN RESTAURANT' JOO S.F. j SITE j.,,,TTTTT ._ SITE S.F. t 1 �TE' J 28TF PARCEL - II3 noc i OPEN SPACE A 5PEcu,� N°RES'14W1 I I / h j O PUBLIC PLAZA ADEQUATE PUBLIC FACILITIES DRIVE -UP p •,, s, I'•""'"4'1G'o"i.CElJ�d L.000 S.P. 10 D 0 0 0 0 O 0 O O 00. O ^,F,At:'? Q o, SITE � O ..o..4L..o . ro, �......,.... e•... co,f ip or00_ 31.00 0-PAR -9 -PARCELS 4 try O �'�'�'�' 0 01 RETAIL / / FAST ROOD t iI WS 000 5 FE — 9.500 / j F'•`P'MeoPii iTwT.n LO.e Y M. L�o we �..� o•„•.... C �••� •.o.�n ux. ���,� T.rNO•� Yx. -e—e- xATufAL w. ux. �I�I— a.cTffoAL Lw. T. aI•.nATlox Lm. •n"ilul�ai aau 0 n ou ax //�� LO�aLATn. liV LAND USE uae {un.n .{•IC♦fl T Ya„o a MPW V. U/p V. W e i a OPoO .!. 4Gxe V. \e { f •0000 V. Mll/1 V. \.T C .TM.'Y appp V. 'N.TO V. 3M I 1C00 V. OA V. .L { OIwK1 f MJOO .J. 4iC0 V. 1Y lI a Mp V. 1.11e V. LI �.wTp cK�u{ I •uae u. Tn- .Isuc nAaA LM u. us or{xrAv i a p\pMTW.�AxA1�I�IAAf�•J� �Tbl V..TN .O .TY{T. • MIW V. W {oa. o.oloxnow TRNe aw.eo •e. IPl1PY .l. 1400 { / PARCEL - I EXISTING RETAIL ' SINGLE STORY 30.000 S.F. SITE 13.030 5. . o{L — 00� SITE S.F. I 0I 31•L1C - p I A l 5-F O gF. t L PARCEL - 14 141 PA EL % y �t OPEN SPACE �������� 10 ja PARCEL _..... L OFFIC RETAIaloo _.-. . ..... SHE 24.000 F. SITE O 4L,4B0 S.F. j -- 6...r 1 � b��0�'�MS.�•�+wY •'u4•iti 1.N•w� x`a yy r��iy�/'Y� •Y� ••la yy�p•'pp Y x M IwY ± f .IV120 V. I f W.'•'911 L Y'N! u ....yew M.1.ly ti EXISTING CIT7 .Ti4{' }•u'7 u w ..a . ram. TS u V x..a....N ..�.wi.w.. ^M �m' i�oa'•'e..•t'w KFW-r».wu w .mow OY MW Ynw F M 00'sm MIL Iw u • Yw . A ICCESS MA i '1y7PL�eld� v6;T1 w M VICINITY MAP I'b ,cue im.-uoo rt. O / e ADJACENT �\ 0 .j. TA SITE ACCESS ` o�,tyi• y � ' E 12i ' PROJECT NOTES PARADIGM PROPERTIES �eUTNEAST FRONTAGE ROAD ��� �•�•..u...e4 u' a u . �_ '-' OVERALL DEVELOPMENT • 1Ai°'• PROJEC E%ISTING OTE9 CONTINUED OTT 7tHFLiN01 •��.or PLAN aCAIeIK-y9rt EXISTING CITY` �'�"'• LIMITS a.1 F.90 u �F HATTHAN ASSOCIATES Architecture do Planning "oyW•�^rp� I '` SITE 115 7Swallow Rod FL CoasColoed0o.87ADJJACENT ACCESS "x F:f.Siu• "�' :AAR4tLF'Ao$• 970.2297395 Fu 2Obt1 #29-01 A Paradigm Properties ODP Type II (LUC) 5/23/02 N 1 inch : 1000 feet Paradigm Properties Overall Development Plan - #29-01A January 15, 2004 P & Z Meeting Page 5 Section 3.7.3(E)(1)(a) states: "For transportation facilities, at a minimum, the city shall require that, at the time of issuance of any Building Permit issued pursuant to a site specific development plan, all necessary facilities and services, as described in Section (D)(1) above, are either: in place and available to serve the new development in accordance with the development agreement, or 2. funding for such improvements has been appropriated by the city or provided by the developer in the form of either cash, nonexpiring letter of credit, or escrow in a form acceptable to the city." The City's LUC states that a site specific development plan shall mean and be limited to a final plan as approved pursuant to this Land Use Code. Therefore, the Paradigm Properties ODP may be reviewed and approved by the Planning and Zoning Board at this time, with the knowledge that subsequent Final Compliance plans for the Paradigm Properties cannot be approved by the City until the aforementioned Adequate Public Facilities requirements are satisfied. The ODP notes that infrastructure features are found to be deficient or substandard to the current City urban development standards. It further notes that the property owner will work with the Colorado Department of Transportation and the City of Fort Collins with respect to improvements to the transportation systems in the area. FINDINGS OF FACT/CONCLUSIONS: In evaluating the request for the Paradigm Properties, ODP, staff makes the following Findings of Fact: • The request is in compliance with the applicable criteria and standards in the Land Use Code. • The request is supported by the adopted Fort Collins 1-25 Subarea Plan and Design Standards. RECOMMENDATION: Staff recommends that the Planning and Zoning Board approve the Paradigm Properties Overall Development Plan - #29-01A. Paradigm Properties Overall Development Plan - #29-01A January 15, 2004 P & Z Meeting Page 4 f. Section 3.6.4 - Transportation Level of Service Requirements The Traffic Operations and Engineering Departments have reviewed the Transportation Impact Study that was submitted to the City for review and have determined that the vehicular, pedestrian and bicycle facilities proposed with this ODP are consistent with the standards contained in Part II of the City of Fort Collins Multi -modal Transportation Level of Service Manual. g. Consistency with the Drainage Basin Master Plan The Paradigm Properties ODP is consistent with the Boxelder Creek Drainage Basin Master Plan. Consistency with the Fort Collins 1-25 Subarea Plan: The Fort Collins 1-25 Subarea Plan, recently adopted by City Council, identifies the area on the Paradigm Properties ODP as Commercial Uses. The proposed land uses are consistent with the adopted plan. Any future development on this site will be subject to the 1-25 Subarea Plan Design Standards. 3. Transportation: The primary access to the property and various land uses will be via future streets and drives internal to the site from the existing Frontage Road along the east and south sides of the property. The proposed ODP shows the arterial and collector street network and proposed access points (graphically shown with arrows) for local streets. The actual local street and drive locations and alignments will be determined with site specific project development plans. Actual physical development on the Paradigm Properties at this time would result in a reduction in the levels of transportation services in the area because of deficiencies associated with the Interstate 25 & Prospect Road interchange. In Section 3.7.3 -Adequate Public Facilities in the LUC, under Section 3.7.3(C)(2)(b) it states: "No site specific development plan or Building Permit shall be approved or issued in a manner that will result in a reduction in the levels of service below the adopted. level of service standards for the affected facility." Paradigm Properties Overall Development Plan - #29-01A January 15, 2004 P & Z Meeting Page 3 • Parcel 4 ..... Proposed Motel (Lodging Establishment) ........ (Type 1) • Parcel 5 ..... Proposed Motel (Lodging Establishment) ........ (Type 1) • Parcel 6 ..... Proposed Sit -Down (Standard) Restaurant ...... (Type 1) • Parcel 7 ..... Proposed Convenience Store w/ Fuel Sales .... (Type 1) • Parcel 8 ..... Proposed Offices ....................................... (Type 1) • Parcel 9 ..... Proposed Retail/Warehouse ........................ (Type 1) • Parcel 10 ... Proposed Retail/Warehouse ........................ (Type 1) • Parcel 11 ... Proposed Offices ....................................... (Type 1) • Parcel 12 ... Proposed Retail ......................................... (Type 1) • Parcels 13 & 14 ..... Proposed Open Space ..................... (Type 1) The proposed land uses are consistent with the permitted uses in the C - Commercial District. b. Section 3.2.2(C)(6) - Direct On -site Access to Pedestrian and Bicycle Destinations The Paradigm Properties, ODP provides a multi -modal corridor through the site, from two access points onto the Frontage Road, and several bicycle/pedestrian routes that connect the various uses to one another as well as to the street network and surrounding properties in the area. C. Section 3.4.1(E) - Establishment of Buffer Zones There are no natural habitats and features on this site that require the establishment of buffer zones. d. Section 3.6.1 - Compliance with the Master Street Plan Other than 1-25 and Prospect Road (a minor 2-lane arterial) along the west and north sides of the Paradigm Properties, there are no streets shown on the Master Street Plan within the area of the ODP. Access to the property will be only from the Frontage Road at points that are consistent with the State Highway Access Control Code. e. Section 3.6.3(A) through (F) - Street Pattern and Connectivity Standards The locations and spacing of the proposed access points to and from the site and adjacent properties are consistent with the requirements for the various types of street intersections as set forth in this section of the LUC. Paradigm Properties Overall Development Plan - #29-01A January 15, 2004 P & Z Meeting Page 2 COMMENTS: 1. Background: The surrounding zoning and land uses are as follows: N: C; undeveloped, existing agriculture S: C; existing agriculture, residential, and commercial in Larimer County E: C; existing agriculture, residential, and commercial in Larimer County W: C; existing City of Fort Collins Resource Recovery Farm The property was annexed into the City with the Interstate Associates Annexation (7.5 acres) in August, 1989 and the Paradigm Properties Annexation (16.8 acres) in January, 2002. The existing Fort Collins Motor Sports retail establishment, shown as Parcel 1 (approximately 2.5 acres) on the Paradigm Properties, ODP, was developed in Larimer County. The remainder of the property is undeveloped. 2. Land Use: Compliance with the City of Fort Collins Land Use Code: As set forth in Section 2.3.2(H), an ODP shall comply with the following criteria: a. Section 2.3.2(H)(1) - Consistency with zone district standards (Article 4) and general development standards (Article 3) This is a request for approval of an ODP for land uses permitted in the C - Commercial Zoning District, as defined in Section 4.17(B)(2) - Administrative Review (Type 1) and 4.17(B)(3) - Planning and Zoning Board Review (Type 11) of the City of Fort Collins LUC. The proposed uses are lodging establishments, standard restaurants, fast food w/ drive -up restaurants, office, retail, and convenience retail store w/ fuel sales. The area for the ODP is comprised of existing (Fort Collins Motor Sports) and proposed commercial development on 24 acres located at the southeast corner of -the Interstate 25 & Prospect Road interchange. The breakdown of the parcels and existing/proposed land uses is as follows: • Parcel 1 ..... Existing Retail ........................................... (Type 1) • Parcel 2 ..... Proposed Fast Food Restaurant w/ Drive -up ... (Type II) • Parcel 3 ..... Proposed Fast Food Restaurant w/ Drive -up ... (Type II) ITEM NO. 6 MEETING DATE 1/15/04 STAFF Steve Olt City of Fort Collins PLANNING AND ZONING BOARD STAFF REPORT PROJECT: Paradigm Properties, Overall Development Plan - #29-01A APPLICANT: Hattman Associates c/o Ric Hattman 145 West Swallow Road Fort Collins, CO. 80525 OWNER: Paradigm Properties P.O Box 3236 Ventura, CA. 93006-3236 PROJECT DESCRIPTION: This is a request for approval of an Overall Development Plan (ODP) for permitted land uses as defined in Section 4.17(B)(2) - Administrative Review and 4.17(B)(3) - Planning and Zoning Board Review of the City of Fort Collins Land Use Code (LUC). The area for the ODP is comprised of existing (Fort Collins Motor Sports) and proposed commercial development on 24 acres located at the southeast corner of the Interstate 25 & Prospect Road interchange. The proposed uses are lodging establishments, standard and fastfood (with drive-ins) restaurants, office, retail, and convenience retail store with fuel sales. The property is zoned C — Commercial. RECOMMENDATION: Approval EXECUTIVE SUMMARY: The Paradigm Properties, ODP complies with the applicable review criteria, including the C - Commercial Zoning District standards, general development standards, street connectivity standards; and, the adopted Master Street Plan, Boxelder Creek Drainage Master Plan, and the 1-25 Subarea Plan. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750 PLANNING DEPARTMENT