HomeMy WebLinkAboutPARADIGM PROPERTIES - ODP - 29-01A - CORRESPONDENCE -b. The City's 1-25 Corridor Study is going to include design guidelines for
activity centers, which will affect his development. The draft of the
guidelines in on the City's website. City Council will adopt the plan and
guidelines in July, 2001.
C. There will be issues associated with adequate public facilities at the 1-25 &
East Prospect Road interchange. One question is who will pay for the
facilities.
Please contact Ken, at 221-6753, if you have questions about these comments.
8. This development request will be subject to the current Development Review
Fee Schedule that is available in the Current Planning Department office. The
fees are due at the time of submittal of the required documents for the Project
Development Plan and Final Compliance phases of development review by City
staff and affected outside reviewing agencies.
9. This development proposal is subject to the requirements as set forth in the
CityOs LUC, specifically Articles 2. Administration (Development Review
Procedures), Article 3. General Development Standards, and Article 4. [Zoning]
Districts.
10. A neighborhood meeting must be held for this development proposal prior to
formal submittal of any PDP's. Please coordinate this meeting with Steve Olt of
the Current Planning Department. He can be reached at 221-6341.
11. Please Note: If there is a subdivision plat as part of this development request
the following requirement must be met:
The applicant must provide a copy of "Certificate of Taxes Due" with the
mylar of the subdivision plat when it is brought to the City's Current
Planning Department for recording. The certificate may be obtained from
the Larimer County Treasurer's Office and must reflect a zero (0) balance
before the City will accept the mylar. Larimer County is requiring this
document, showing no outstanding property taxes, before they will accept
and record subdivision plats.
6. Katie Moore of the Engineering Department offered the following comments:
a. The standard utility plan submittal requirements will apply to this
development request.
b. Street oversizing fees will apply to this development request. The fees are
based on vehicle trip generation for the proposed land uses in the
development plan. Please contact Matt Baker, at 224-6108, for detailed
information on the fees. The fees will be collected at the time of issuance
of building permits.
C. A Transportation Impact Study (TIS), addressing all modes of
transportation, will be required with your Project Development Plan (PDP)
submittal. Please contact Eric Bracke of the Traffic Operations
Department, at 224-6062, and Mark Jackson of the Transportation
Planning Department, at 416-2029, to determine what information is
needed in the TIS pertaining to Level of Service for vehicle, pedestrian,
bicycle, and transit modes of transportation.
d. There are parking lot setback requirements from adjacent streets.
e. Improvements to the surrounding arterial streets will be necessary. This
development will be responsible for the cost of these improvements.
f. The access points from the frontage road to this development must be
approved by the Colorado Department of Transportation. They will issue
the necessary access permits.
g. Please reference the on -going 1-25 Corridor Study that is available in the
Advance Planning Department.
h. The Larimer County Urban Area Street Standards will apply to this
development proposal. The street design for this development must
comply with these standards.
i. A Development Agreement and a Development Construction Permit will
be required for this development.
Please contact Katie, at 221-6750, if you have questions about these comments.
7. Ken Waido of Advance Planning Department offered the following comments:
a. Part of this property must be annexed into the City before a PDP for this
development can be submitted to the City for review.
d. A fire hydrant must be located within 300' of all buildings and spaced at a
distance of no more than 600' between hydrants.
e. The parking lots must provide 25' inside and 50' outside turning radii.
f. A HAZMATS Study will be required for the convenience store with fuel
sales.
g. Necessary fire lanes throughout the development will be determined with
P D P's.
h. The street name(s) for the internal street must change at the 90 degree
bend.
Please contact Ron Gonzales, at 221-6570, of you have questions about these
comments.
5. Doug Moore of the Natural Resources Department offered the following
comments:
a. A Fugitive Dust Control Permit will be necessary. This permit would be
issued by the Larimer County Environmental Health Department. Please
contact them directly for information about their requirements.
b. Native plant materials and grasses should be incorporated in the
Landscape Plan.
C. Check with Tim Buchanan about the condition of all existing trees if any
are proposed to be removed or relocated. Mitigation may be necessary.
d. The trash enclosures should be designed and constructed to provide for
recycling, with a walk-in side door. Proper screening of the trash
enclosure is required. Try to use one trash hauler for the entire project.
e. If prairie dogs exist on this property they must be relocated or humanely
eradicated prior to any construction occurring on -site, including overlot
grading.
-f. `Adequate bicycle and pedestrian facilities must be provided on the site
and to and from the site.
g. An Ecological Characterization Study may be required to address
wetlands, wildlife, and other natural resource concerns.
Please contact Doug, at 224-6143, if you have questions about these comments.
Please contact Jenny, at 221-6760, if you have questions about these
comments.
2. Roger Buffington of the Water/Wastewater Department indicated that service in
this area will be provided by the ELCO Water District and the Boxelder Sanitation
District. Please contact them directly for their requirements for development.
3. Glen Schlueter of the Stormwater Utility offered the following comments:
a. This site is not in any of the City's present master planned drainage
basins. There is no new development fee but there is no City planned
drainage system, either. It will be up to the developers of this site to
provide a system. Stormwater suggests that the developer's engineer
investigate the options early in the process and work with City staff on
determining the outfall system. The site is in Inventory Grid #16K.
b. The standard drainage and erosion control reports and constructions
plans are required and they must be prepared by a professional engineer
registered in the State of Colorado. A development this size is required to
modeled using a SWMM Model.
C. It doesn't appear that any consideration was given for on -site detention. A
development this intense will generate a lot of runoff and most existing
systems in Larimer County cannot handle the water. The standard release
rate for sites without City master plans is the 2-year historic rate.
d. On -site water quality extended detention is required to treat the runoff.
e. The drainage outfall was identified in a previous submittal as a pipe that
goes under Interstate 25 and through City -owned land on the west side of
the interstate. Easements for the outfall system are required.
Please contact Glen Schlueter, at 224-6065, if you have questions about these
comments.
4. Ron Gonzales of the Poudre Fire Authority offered the following comments:
a. Fire flows of 1,500 gallons per minute at a residual pressure of 20 pounds
per square inch must be provided.
b. Addressing for the buildings, with a minimum of 6" high numerals, must be
visible from the street they front on.
i
C. A number of the buildings will have to be fire sprinklered.
ti.
MEETING DATE
ITEM:
APPLICANT:
LAND USE DATA:
May 21, 2001
Silverhill Mixed -Use Development
Hattman & Associates
c/o Ric Hattman
145 West Swallow Road
Fort Collins, CO. 80525
Request for a mixed -use development on 24.19 acres located at the southeast corner
of Interstate 25 and East Prospect Road, between the interstate highway and the
frontage road. There is one existing 20,000 square foot retail building on the site. The
proposal is for 12 new buildings containing fast food and sit-down restaurants, a
convenience store with fuel sales, hotels, and office/retail/warehouse uses. Access
would be from several points on the frontage road. The property is in the C —
Commercial Zoning District.
COMMENTS:
1. Jenny Nuckols of the Zoning Department offered the following comments:
a. The property is in the C — Commercial Zoning District. The proposed mix
of uses are permitted in the C District, subject to a Planning and Zoning
Board (Type II) review and public hearing as set forth in the City's Land
Use Code (LUC).
b. The first step in the City's formal development review process will be a
complete submittal of a Project Development Plan (PDP) to the Current
Planning Department.
C. Provide a secure bicycle rack near the primary entrances to the buildings.
d. The maximum parking allowances for these non-residential land uses are
set forth in Section 3.2.2(1<)(2) of the LUC.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750
CURRENT PLANNING DEPARTMENT