Loading...
HomeMy WebLinkAboutSIDEHILL (JOHNSON PROPERTY) - ODP - 32-01A - CORRESPONDENCE - REVISIONS (3)N__SE�AR- BROWN Page 2 The Site is planned to work within the Master Plan. There should be not Drainage Basin Transfers of storm flows. We will show the Master Plan Drainage Basin Lines. Page 9 of 10 Item 17 Drainage Report comments have been addressed. Page 10 of 10 Items 11 & 12 Sear Brown will conduct a study of the area. Feel free to contact Jim Allen -Morley or myself if you have any questions. Sincerely, John Gooch, EIT . Design Engineer ARCI-I IT'ECTURE ENGINEERING PLANNING SEAR -BROWN _ CONSTRUCTION December 11, 2001 RE: ODP Response to Comments Dear Mr. Jones: 5285 McWhinney Blvd., Suite 190 Loveland, CO 80538 970.461.2800 phone 970.461.2801 fax www.searbrown.com The following text contains Sear Brown's responses to the City of Fort Collins comments for the Johnson Farm ODP submittal. ODP Response to Comments: Page 4 of 10 Item 39 Sear -Brown will coordinate with Eric Bracke and Matt Baker regarding the future Timberline Improvements. Page 6 of 10 Item 30 Sear -Brown will plat the neighborhood parkland at the time of the PDP. The location of this land will be decided with the client and the City of Fort Collins. Page 7 of 10 Item 19 Sear -Brown will design the water system to meet these requirements during Project Development Plan and Final Compliance Plan phases. Page 8 of 10 Item 13 Sear -Brown will complete a UDSWMM design for PDP and FCP plans. We have approximated the Increased volume by adding and applying a factor of 1.25. Page 8 of 10 Item 14 Sear -Brown's drainage plan shows a general arrow of the outfall from the pond to the Fossil Creek Reservoir Inlet Ditch. This is the first choice of the outfall and is consistent with the master plan. Page 8 of 10 Item 15 This will not apply, as we are not planning to discharge to the Rigden Farms Pond Page 9 of 10 Item 16