HomeMy WebLinkAboutSIDEHILL (JOHNSON PROPERTY) - ODP - 32-01A - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEWTHE JOHNS0N PROPERTY
FORT COLLINS, COLORADO
jULY 1 8, 2001
LEGAL DESCRIPTION
A TRACT OF LAND SITUATE IN SECTION 20, TOWNSHIP 7 NORTH, RANGE 68 WEST OF THE
6TH P.M., LARIMER COUNTY, COLORADO, WHICH, CONSIDERING THE SOUTH LINE OF SAID
SECTION 20 AS BEARING EAST AND WEST, AND WITH ALL BEARINGS CONTAINED HEREIN
RELATIVE THERETO, IS CONTAINED WITHIN THE BOUNDARY LINES WHICH BEGIN AT A POINT
WHICH BEARS EAST 1337.40 FEET, AND AGAIN N00'51'00"W 1748.80 FEET FROM THE
SOUTHWEST CORNER OF SAID SECTION 20, AND RUNS THENCE N00'51'00"W 1479.02 FEET
TO A POINT ON THE SOUTHERLY RIGHT-OF-WAY LINE OF THE EXISTING RAILROAD; THENCE
ALONG SAID SOUTHERLY RIGHT-OF-WAY LINE, S50012'00"E 5042.05 FEET TO A POINT ON
THE SOUTH LINE OF SAID SECTION 20; THENCE ALONG SAID SOUTH LINE, WEST 2587.66
FEET TO THE SOUTHEAST CORNER OF THE PROPERTY DEEDED TO CARGILL IN BOOK 1383 AT
PAGE 143; THENCE ALONG THE EASTERLY AND NORTHERLY BOUNDARY OF SAID PROPERTY
DEEDED TO CARGILL, N00'34'00"E 339.79 FEET, AND AGAIN N15'14'00'W 193.40 FEET, AND
AGAIN N50'23'00"W 360.30 FEET, AND AGAIN N42'24'00"W 246.15 FEET, AND AGAIN N50'
48'00"W 366.40 FEET, AND AGAIN N38'26'30"W 729.12 FEET, AND AGAIN N77'15'00"W 36.75
FEET TO THE POINT OF BEGINNING,
AND
A TRACT OF LAND SITUATE IN THE WEST ONE-HALF OF SECTION 20, TOWNSHIP 7 NORTH,
RANGE 68 WEST OF THE 6TH P.M., LARIMER COUNTY, COLORADO WHICH CONSIDERING THE
SOUTH LINE OF THE SOUTHWEST ONE- QUARTER OF SAID SECTION 20 AS BEARING N90'
00'00"E AND WITH ALL BEARINGS CONTAINED HEREIN RELATIVE THERETO IS CONTAINED WITHIN
THE BOUNDARY LINES WHICH BEGIN AT THE SOUTHWEST CORNER OF SAID SECTION 20 AND
RUN THENCE N90'00'00"E 1337.40 FEET ALONG THE SOUTH LINE OF THE SAID SOUTHWEST
ONE -QUARTER TO THE SOUTHWEST CORNER OF THE TRACT DESCRIBED IN BOOK 1383 AT
PAGE 143 OF THE LARIMER COUNTY RECORDS; THENCE ALONG THE WEST LINE OF THE SAID
TRACT ALONG AN EXISTING FENCE LINE, N00'51'00"W 1748.80 FEET TO THE NORTHWEST
CORNER OF THE SAID TRACT; THENCE CONTINUING ALONG THE EXISTING FENCE LINE N00'
51'00"W 1480.05 FEET TO A POINT ON THE SOUTHWESTERLY RIGHT-OF-WAY LINE OF THE
BURLINGTON NORTHERN RAILROAD; THENCE ALONG THE SAID RIGHT-OF-WAY LINE N50'11'57"W
1359.36 FEET AND AGAIN ALONG THE ARC OF A 2914.93 FOOT RADIUS CURVE TO THE RIGHT
OF DISTANCE 409.71 FEET, THE LONG CHORD OF WHICH BEARS N46' 10'21 "W 409.38 FEET
TO A POINT ON THE WEST LINE OF THE NORTHWEST ONE -QUARTER OF SAID SECTION 20;
THENCE S00'45'40"E 1730.46 FEET ALONG THE WEST LINE OF THE SAID NORTHWEST
ONE -QUARTER; THENCE S00'35'15"E 2651.99 FEET TO THE POINT OF BEGINNING.
JOHNSON PROPERTY
Overall Concepts for the Master Plan
July 11, 2001
• Come to terms with City on various zoning districts as it related to structure plan.
• Rezone Application/Zoning Map
• ODP Application/Submittal Package
• Planning Commission Hearing for Rezone - City Council- 2 readings for Rezone
• Planning Commission Hearing for ODP
SMW:jsi
S:\WP\PR0JECTS.1-P\Johnson Property comments on master plan.doc
10
JOHNSON PROPERTY
Overall Concepts for the Master Plan
July 11, 2001
f believe Craig Foreman's requested site acreage included area for irrigation pond.
11. Current Planning:
a. Refer to Section 3 (General Development Standards), and Section 4 (Specific Zoning District
Standards) in the Land Use Code for the standards that apply to your proposed
development. The Land Use Code is available to view on the internet at www.ci.fort-
collins.co.us/CITY HALL/CODES.
Comment acknowledged.
b. We need to carefully coordinate the Sharp Point extension to Drake as shown with the
unique needs of the possible historic buffer around the barn site and the possible
preservation of the valley wall. This connection must also be coordinated with Traffic
Operations and Transportation Planning.
Comment acknowledged.
c. We would like to arrange for representatives from the James Company and Downing,
Thorpe & James, Inc. to go on a tour of developments with us. The intent of the tour is to
look at examples of what the City does and does not want with regard to the quality and
configuration of the development.
We attended a tour with Cameron and Troy, visiting three (3) sites the City regards as
quality developments.
d. We encourage working together with Cargil.
We have attempted to work with the Cargif representatives with no success. The will
not be included in our ODP Submittal.
e. The wastewater treatment plant has the need for some substantial buffering around their
facility.
Melinda from the James Company met with Steve Comstock and they discussed the
requested buffer. We are allowing extra open space/detention area between the
wastewater treatment plant and the future residence. We will continue to discuss
buffer zone planting/berming treatment.
The first step we need to all come to terms with together is the appropriate locations for
the various zone districts. Once we work out a zoning solution that both the City and your
team feels comfortable with, the property will officially have to be rezoned. Once the
rezone takes affect, the review and eventual approval of the Overall Development Plan
(ODP) will be the next step. After the approval of the ODP, the site specific plan for a
single phase of development is a Project Development Plan (POP).
Schedule as we understand it.
JOHNSON PROPERTY
Overall Concepts for the Master Plan
July 11, 2001
c. Work with Karen McWilliams, Historic Preservation Planner, regarding these issues. She
was not able to attend the conceptual review meeting, but has been involved in the project.
She has indicated that each site needs a buffer.
We have scheduled several meetings with the Historic Preservation Department, but
they were unable to keep these meeting times. We have hired a Historic Preservation
Consultant and have based our plan on this reports findings. Karen has seen the reports.
10. Park Planning:
The proposed park site is not acceptable for the following reasons:
a. Much of the park site is on top of the natural area buffer requirement for the ditch. We can
be next to such a buffer, but not on top of due to the need to minimize wildlife impact by
people.
We have met with Craig Foreman and discussed his concerns and desires. We have
modified the park location, arrangement, and shape to conform to the park planning
request.
b. The historical farm building cannot be a portion of the park. The cost associated with trying
to utilize such a structure in a park would greatly impact our limited park budget. Again, we
can be next to the site.
We have relocated the park to remove the farm buildings from public park.
c. The long, narrow park site does not provide adequate relief from the urban environment;
i.e., noise, traffic, etc. We need a park that is more rectangular or square in shape to
develop a good park for the citizens.
We have modified plan and park accordingly.
d. Level ground is needed for the development of turf areas, ballfields, etc.
We have modified plan and park accordingly.
e. Our fees are based on some street frontage, this proposed layout has way too much street
frontage for our fees to cover.
We are still proposing wrapping the majority of the neighborhood park with street
frontage - we will need to keep talking about this issue.
f. We need to be able to get irrigation water to the park site without pumping. The
development of an irrigation pond on the park site allows us to use raw water. This saves
considerable costs compared to using domestic water to irrigate the park.
r'�
JOHNSON PROPERTY
Overall Concepts for the Master Plan
July 11, 2001
b. Be sure that your internal pedestrian and bicycle circulation provides direct connections to
parks and community facilities.
Major roads within the project will have detached sidewalks and on street bike lanes,
and we have connections to both adjacent residential/commercial projects.
c. Bicycle parking must be provided near building entrances.
Comment acknowledged.
d. Typically pedestrians don't take the longest route. Make sure there are direct connections
from the Drake/Timberline intersection to pedestrian destinations in the site (such as the
linear park, and the Sharp Point crossing of the RR tracks).
Comment acknowledged.
e. There will be high pedestrian crossing demand of Drake Road because the commercial
center in Rigden Farm will be a major destination. Think of a design for pedestrian crossing
of Drake Road.
We agree and we will focus on the final design elements at PDP - comment
acknowledged.
9. Historic Preservation:
a. The proposed plan shows the red house being moved. This is not acceptable from a
Historic Preservation standpoint. The context of the red building as it sits on its site is
significant.
We have proposed a minimum 200' buffer around the red house, including additional
land to the northeast, on the Jessup Farm. We anticipate this building being sold to a
single user office facility with restrictive covenants. The James Company will make
repairs it deems necessary to market the site, at their discretion.
b. Both historic, the red house on Timberline and the white barn on Drake are eligible for
landmark designation, and need to be preserved.
We have provided a buffer zone of 200' from both structures. We anticipate the
Johnson Farm area to be sold as a single family lot with restrictive covenants.
Restrictive covenants for both the red house and white barn will force all future
owners to maintain the barn and house in good condition/no demolition, etc. The
HOA or the city may be the entities to enforce the restrictive covenants for both
lots.
VA
JOHNSON PROPERTY
Overall Concepts for the Master Plan
July 11, 2001
6. Fire Department:
a. The Land Use Code requires that front facades of dwelling units face the adjacent street to
the extent reasonably feasible.
Comment acknowledged.
b. Address must be visible from the street on which each building fronts using a minimum 6"
numerals on a contrasting background.
Comment acknowledged.
c. Private Drives cannot be named, therefore it units do not face a street, addressing becomes
a major problem for emergency services.
Comment acknowledged.
d. Contact Ron Gonzales from the fire department for more information.
Comment acknowledged.
7. Light and Power:
a. There is a system in place along the south side of the property.
Comment acknowledged
b. Our department is working on installing a duct bank along the west side of this property.
Comment acknowledged
c. Coordinate transformer locations with our department. Transformers must be no greater
than 10 feet from a paved surface.
Comment acknowledged
d. Normal development fees apply.
Comment acknowledged
8. Transportation:
a. As shown on your concept drawing, there will be challenges for the proposed Sharp Point
Drive connection to Drake. This connection needs to be carefully coordinated.
What challenges do you forsee? We will be addressing the amount of out thru traffic
and heading in both directions as well as ensuring adequate intersection spacing to
allow left turns on Drake.
R
JOHNSON PROPERTY
Overall Concepts for the Master Plan
July 11, 2001
d. From a Natural Resources perspective, a soccer field does not blend well with the notion
sensitive design of the valley wall.
Comment acknowledged. We have changed the park location, arrangement and the
proximity of the soccer field to the valley wall.
e. We are aware of at least one active fox den in the vicinity of the valley wall.
We met with Doug Moore on site and have identified the fox den and will be preserving
it. We will provide a 50' buffer around the den, and coordinate the reconstruction of
the den with natural resources.
f. Buffer zones will be based on the ecological characterization study.
Doug Moore identified one stand of existing Trees as a small woodlot and requested a
25' buffer. We have incorporated this woodlot into park open space and have realigned
the road to prevent any grading disturbance in this area.
g. We need hydrology, groundwater, and water quality information.
See attached report.
h. Depict what type of plantings you intend at the detention ponds.
We intend to use a native plant palette in the detention zone.
i. Provide mitigation plans for any disturbance of existing wetlands.
We have identified the approximate location for on site wetland mitigation
j. There are tree preservation standards in the Land Use Code that will need to be complied
with.
We have met with the city forester, Tim Buchanan, on site to evaluate existing trees.
We have provided a buffer for the existing small wood lot and the only other tree
groundings will be preserved in the farmstead buffer zones. Any individual trees will be
saved or migrated per the Land Use Code and Tim Buchanan.
k. We encourage your voluntary involvement in the green building program when you get to
that stage in your development.
Comment acknowledged.
+i
JOHNSON PROPERTY
Overall Concepts for the Master Plan
July 11, 2001
I. Street connections with Timberline need to align with the street connections approved
across the street with the Spring Creek Farm North ODP.
Yes, we are aligning with Spring Creek.
4. Water and Wastewater Utility:
Location: NW of Drake Road and Timberline Road (L-1 1)
Location: NE of Timberline Road and Drake Road (K-121 K-12/13)
Proposal: Johnson Property Master Plan
Ex. Mains: Water — 24-inch in Timberline, 24-inch in Drake
Sewer — 18/24-inch in Drake, 30/33-inch on NE side of the railroad tracks
Comments: The west portion of the sanitary sewer in Drake is blocked by the large storm
sewer that was installed last year. The City Wastewater Utility is very interested in maintaining
a buffered area in the east part of the development near the Drake Water Reclamation Facility.
Utility coordination will be critical in the early stages of the project layout to assure that
adequate space is left for all underground utilities. Repays will be due for the water mains in
Timberline and Drake. The water conservation standards for landscape and irrigation will apply
to the project. PIF's and water rights will be due at time of building permit. The City is willing
to discuss the possibility of a gray water irrigation for the development. More information will
be needed prior to making a decision regarding the irrigation concept, water rights and fees.
Comment acknowledged
5. Natural Resources:
a. An Ecological Characterization Study is required. Check with Doug Moore about the
specifics of what this report should entail.
Our wildlife study meets the Ecological Characterization Study requirements.
b. The existing wetlands must be delineated.
Yes, wetlands have been delineated and will be shown on the ODA
c. There seems that there may be the political will to preserve the valley wall. Work closely
with the Park Planning and the Natural Resources Departments if you intend to do any
regrading of the valley wall.
We met with Doug Moore as well as Craig Foreman concerning the valley wall. Craig
said he did not want too much of the sloped area to fall within the neighborhood park —
that 2 to 3 acres could be sloped but 5 to 6 acres should be relatively flat. When we
walked the site with Doug Moore, he identified the important areas to save and the
existing trees he would like to see preserved — but we informed him that the northern
113 of the valley wall would need to be lowered. We will be preserving the lower 213
and the very northern section near the Jessup 01n) site.
4
JOHNSON PROPERTY
Overall Concepts for the Master Plan
July 11, 2001
d. Will need to look at improvements that are necessary based on the portion of ground
submitted, traffic impacts, layout and impacts.
Comment acknowledged.
e. You will be required to have a Development Agreement, a Development Construction
Permit, and Utility Plans.
This will be specifically addressed during the PDP and FCP submittals.
f. Need to submit any variances to street standards in accordance with the requirements of
the standard. The variance to standards are not considered until we have an actual
submittal and all supporting documents.
This will be specifically addressed during the PDP and FCP submittals.
g. We recommend a utility coordination meeting after submittal to look at serving utilities to
the site.
This will be specifically addressed during the PDP and FCP submittals.
h. Provide street connections in accordance with the code. Connections out to arterials and
connections to adjacent developable property.
Comment acknowledged.
i. Street connections need to be made in accordance with the street standards and need to
align with the collector street connection shown by the Spring Creek North ODP.
We are providing connections at major full movement intersections aligning Spring Creek
and Rigden Farms.
j. As shown on the conceptual drawings, there are a lot of street intersections that do not
meet design standards. Streets can't come into intersections that deviate from 90 degrees
by more than 10 degrees. Need to address sight distance easements with variances at
these points.
Comment acknowledged
k. Drake will be a new street by the time you develop along it. Street cut fees are expensive,
and they will apply in this case.
Comment acknowledged
3
JOHNSON PROPERTY
Overall Concepts for the Master Plan
July 11, 2001
d. The standard drainage and erosion control reports and plans are required and they must be
prepared by a professional engineer registered in Colorado.
Comment acknowledged.
e. There are site releases identified in the Foothills Master Drainage Plan. The lower drainage
basin is identified as outfalling into the Fossil Creek Inlet Ditch after detention. The other
sub -basins to the west also need detention but can outlet into the "North Tributary" storm
sewer.
The ODP Drainage report plan is consistent with this comment.
f. On -site extended detention is required to treat runoff.
This will be specifically addressed during the PDP and FCP submittals.
g. The groundwater depth needs to be considered for detention facilities. This issue has
become an issue on several developments recently.
Comment acknowledged.
h. Using small lots presents some drainage and grading challenges. Therefore, detailed grading
is essential. A common downspout outfall system is something that should be considered
when grading is tight as well as retaining walls. Window wells, side door pads, air
conditioner pads, etc., also present special challenges that needs to be considered with
small lots. Also, since street cross sections are small, there tends to be a need for more
storm sewers.
This will be specifically addressed during the PDP and FCP submittals.
3. Engineering Department:
a. Street Oversizing Fees depend on the quantity of each use proposed. Contact Matt Baker
for details on this fee.
Comment acknowledged.
b. The project will require a Traffic Impact Study (TIS) that addresses site access, and all
modes of transportation including automobile, bicycle, pedestrian, and transit.
Comment acknowledged.
c. The TIS will need to specify the traffic volume on each street to determine the appropriate
street classification (e.g., local, connector, collector, etc.)
Comment acknowledged.
2
MEMORANDUM
DATE: July 18, 2001
TO: Troy Jones
City of Fort Collins
FROM: Greg White - Downing, Thorpe & James, Inc.
Melinda Bartlett - James Company
Jim Allen -Morley - Sear Brown
RE: Response Memo from Overall Concept Review Meeting dated March 26, 2001 for
Johnson Property
1. Zoning Department:
a. No representative from Zoning was present.
Comment acknowledged.
b. The property is located in the T-Transition zone district.
Comment acknowledged.
c. Any development activity would require a rezoning from T.
Comment acknow/edged.
d. Contact Peter Barnes for any questions.
Comment acknow/edged.
2. Stormwater Utility Department:
a. Location: Northeast corner of Drake and Timberline.
Comment acknowledged.
b. This site is in the Foothills drainage basin where the new development fee is $6,525/acre
which is subject to the runoff coefficient reduction.
Comment acknowledged.
c. The site is in inventory grid #131.
Comment acknowledged.