Loading...
HomeMy WebLinkAboutSWIFT ADDITION TO FOSSIL LAKE P.U.D. - COUNTY REFERRAL - 33-01(I) - CORRESPONDENCE - CITY STAFFSeptember 4, 2001 Troy Jones Current Planning City of Fort Collins 281 North College Avenue Fort Collins. Colorado 80521 Project: Swift Addition to Fossil Lake P.U.D. Troy, At the request of the Everitt Companies, Northern Engineering has reviewed the recently revised site plan for The Swift Addition to Fossil Lake PUD. The existing site offers many challenges from a civil engineering standpoint, the largest of which is the earthwork volumes required to provide adequate sewer depths and drainage for the site. We have provided the Everitt Companies with design input in a hope that they could refine the site plan to better solve these complex issues. As mentioned above, the largest design issue affecting the site is the earthwork fill volume required so that adequate sewer depths can be provided for service to the lots while maintaining adequate drainage facilities. The new layout provides street and lot geometry which will allow design of the sewer mains and drainage facilities with minimal fill volumes over the entire site. The new design provides a very sensible solution to these issues while maintaining the same land use and transportation objectives as planned with the preliminary submittal. We feel very confident that the new layout offers a more efficient solution to these design issues. Please feel free to contact our office with additional questions or concerns. Sincerely, GeorgeSchock Vice President 420 SOUTH HOWES, SUITE 202, FORT COLLINS, COLORADO 80521, (970) 221-4158, FAX (970) 221-4159