Loading...
HomeMy WebLinkAboutFOSSIL LAKE PDP, 4TH FILING - PDP - 33-01G - CORRESPONDENCE - TRAFFIC STUDYCO cr) LO Go 0 a O O U O z Uj 0 J W 0 a J 0 N n', N CY Uj a 7 3 W 0.f^ v co 0 6 to CD 6 n rn X Q LL MEMORANDUM TO: Dave Brown, KEM - Fossil Lake LLC City of Fort Collins FROM: Matt Delich -0 DATE: September 24, 2002 SUBJECT: Fossil Lake Condos Transportation Impact Study - Response to staff comments (File: 0236ME01) to This memorandum provides N comment item 19 under the Topic: 0) made by Tom Reiff, Transportation CO cD pertains to the pedestrian level o School, specifically with regard O^i i response to Fort Collins staff Transportation. This comment was Planning Department. This comment of service to the future 2004 High to continuity. ij The pedestrian level of service analysis states that actual z level of service for continuity is not acceptable. This is because athe street system is not complete and, therefore, the sidewalk system is not complete. The route described and mapped to the future 2004 High School is along future Trilby Road, within the Fossil Lake Estates development, crossing Kechter Road to Franz Drive. Franz Drive connects to a future access to the 2004 High School. Construction of Trilby Road is continuing as Fossil Lake Estates is built. There will be sidewalks along this segment of Trilby Road. When the 2004 High School is built, Franz Drive will be built. It will have sidewalks per Fort Collins street standards. Under this circumstance, there will be a continuous sidewalk between Fossil Lake Condos and the 2004 High School. Therefore, the continuity aspect of the pedestrian level of service will be acceptable.