HomeMy WebLinkAboutFOSSIL LAKE P.U.D., SECOND FILING - COUNTY APPROVAL - 33-01E - CORRESPONDENCE - (5)10. Engineering - Please see the attached comment sheet from the Eng.
Department. Sheri e-mailed a copy of them to Northern Engineering.
11. Stormwater - The Stormwater Department will forward comments to you
when they are available.
If you have any questions regarding these comments, please contact me or
any of the departments listed above.
�incerely, I,
Troy nes
City Planner
cc: Applicant
File
3
Snowy Creek Drive (16.6.1). Paint curb red 5 feet back on each side of
ramp to prevent parked cars from blocking ramp access and to increase
the visibility of people crossing the street from the trail (see red lines).
4. Transportation Planning - As discussed at the 4/10/01 City/County
meeting, keep trail along southern property as shown for now. This
includes an enhanced crosswalk where it crosses the street (see
redlines). If Park Planning wants to relocate the trail baled on the
development of Dr. Beard's property, the approved plans can be amended
in the future.
5. Transportation Planning - Regarding developer comments from first round
of reviews. Directional ramps are required in the new Larimer County
Urban Area Street Standards where sidewalks are detached (16.3.1#5).
Designs should be in accordance with the standard drawing 16-4D.
6. Transportation Planning - Please see the Engineering comment #4
regarding the directional sidewalk ramps.
7. Advance Planning - We need to coordinate the boundaries of the zone
districts that will need to be assigned to the property upon annexation.
A meeting has been set up between Advance Planning and Natural
- - -- -Resources-for next week to -determine -what -the -appropriate -zone -district - -
for the property in the Resource Management Area will need to be. At
this point it looks likely that UE may work, but have the applicant check
with us before they proceed with that on the annexation application.
8. Current Planning - Please refer to the attached "Annexation and Zoning
Submittal Requirements" hand out, and the "Submittal Checklist for
Annexation and Zoning" handout to for a detailed list of what to submit
for annexation. Please have the engineering consultant talk to me about
the exact location between zone district boundaries before they spend a
lot of time on them. Note on item 3(c) on the submittal requirements
sheet that we will need a legal description of the boundaries of each of
the proposed zone districts within the area to be annexed.
9. Current Planning - The school and park site is scheduled to go to 2nd
reading of the City Council on May 1, 2001, so this property will be
eligible for annexation very soon. As we get closer to the middle of May,
we need to set up a meeting to discuss the details of the annexation.
Among the items to be discussed should be approproate zone districts
and their specific locations, the details of the petition, who the applicant
will be, fees, etc. Please coordinate these efforts with Troy Jones.
2
Commt y Planning and Environmental rvices
Current Planning
City of Fort Collins
April 13, 2001
Matt Lafferty
Larimer County Planning Department
P.O. Box 1190
Fort Collins, CO 80522-90
City staff has reviewed the proposed Fossil Lake PUD, 2"d Filing that has
been submitted for the Board of County Commissioners and hereby offer
comments.
DEPARTMENTAL CONTACTS:
Current Planning -
Advance Planning -
Engineering Department-
Stormwater Utilities -
Natural Resources Development Planner
Transportation Planning
Traffic Engineering
Park Planning
COMMENTS:
Troy Jones
221-6750
Pete Wray
221-6376
Sheri Wamhoff
221-6605
Basil Hamdan
221-6681
Kim Kreimeyer
221-6750
Tom Reiff
416-2040
Ward Stanford
221-6820
Craig Foreman
221-6618
1, Transportation Planning - As discussed at the City/County staff meeting
on 4/10/01, change the trail note (for the trail in the northeast corner of
the site) to state that the alignment is to be coordinated with Parks and
Recreation and Poudre School District. Trail will be a neighborhood trail,
not part of the city system and will be part of the development.
2. Transportation Planning - Locate enhanced cross walks at the
intersection of Trilby Road and Kechter Road (arterial/collector
intersection). It will also service the trail along the McLelland Ditch for
people crossing either road.
3. Transportation Planning - Locate enhanced cross walks at the Trilby Road
mid -block crossing between cul-de-sacs and the regional trail across
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020