HomeMy WebLinkAboutMAINSTREET HEALTH & WELLNESS SUITES - FDP - FDP150006 - CORRESPONDENCE -Comment Nui..,er: 8 Cor,..aent Originated: 03/16/2015
03/16/2015: No plans were provided for review.
Topic: Plat
Comment Number: 9 Comment Originated: 03/16/2015
03/16/2015: All reception numbers for documents recorded by separate document
must be added prior to mylars.
Comment Number: 10 Comment Originated: 03/16/2015
03/16/2015: The monument record provided for the northwest comer of section 4
does not match what is shown on the plat. Please confirm which is correct, and
provide a monument record with the correct monument shown.
Topic: Site Plan
Comment Number: 11 Comment Originated: 03/16/2015
03/16/2015: There are line over text issues. See redlines.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson(cafcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/17/2015
03/17/2015: minor redlines to the notes and signing/striping will be provided at the
meeting.
Department: Water -Wastewater Engineering
Contact: Shane Boyle, 970-221-6339, sboyle(&fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/17/2015
03/17/2015: The LCUASS bedding detail shown on Cole's plans is not used for the
City water mains. Please add the City's standard water main bedding detail to the
Cole plans. Also please include all other pertinent City details such as the
appropriate meter pit details, PVC tracer wire, etc.
Page 6 of 6
Comment Nun..,er: 4 Coi,..,ient Originated: 03/17/2015
03/17/2015: It does not appear an underdrain is shown for the paver section just
north of the building. Please revise the plan to include an underdrain or address
how subsurface drainage will be handled in this area.
Comment Number: 5 Comment Originated: 03/17/2015
03/17/2015: The variance request for reduction in the amount of porous pavers for
this site will likely be supported based on the reasoning supplied in the Drainage
Report. A City Alternative Compliance / Variance Application will need to be
submitted as part of the Drainage Report. Please contact me for a copy of this
form.
Comment Number: 6 Comment Originated: 03/17/2015
03/17/2015: Please add a row to the LID table indicating % of porous pavers being
provided with this design.
Comment Number: 7 Comment Originated: 03/17/2015
03/17/2015: The storm sewer stub configuration on the south side of Precision
Drive does not match the development pattern for that area. It would be preferable
to revise these stubs so that each property will be responsible for their portion of the
street right-of-way, but if the developer of this area is proposing to move this
responsibility to other parcels, it may be best to capture this in some form of an
agreement. Further discussion on this issue may be necessary.
Department: Technical Services
Contact: Jeff County, 970-221-6688, icountw'aDfcaov.com
Topic: Building Elevations
Comment Number: 1 Comment Originated: 03/16/2015
03/16/2015: No comments.
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 03/16/2015
03/16/2015: COLE: There are line over text issues. See redlines.
Comment Number: 3 Comment Originated: 03/16/2015
03/16/2015: ASPEN: All reception numbers for documents recorded by separate
document must be added prior to mylars.
Comment Number: 4 Comment Originated: 03/16/2015
03/16/2015: ASPEN: There are line over text issues on sheets 18 & 24. See
redlines.
Comment Number: 5 Comment Originated: 03/16/2015
03/16/2015: ASPEN: Please tie the coordinate values shown on sheets 21-25 for
utilities to the project boundary. We would prefer that this be done by adding
property comer values to each sheet, or showing the property comer values on the
horizontal control plans and adding a note to each sheet with coordinate values.
Topic: Landscape Plans
Comment Number: 6 Comment Originated: 03/16/2015
03/16/2015: COLE IRRIGATION: There are line over text issues. See redlines.
Comment Number: 7 Comment Originated: 03/16/2015
03/16/2015: VIGNETTE: No comments.
Topic: Lighting Plan
Page 5 of 6
Comment Nurk._ar: 1
Cot....ent Originated: 03/18/2015
03/18/2015: Light & Power has existing facilities at the intersection of Technology
Pkwy & Precision Dr. and in the roadway of Ziegler Rd. Power is not readily
available at the proposed site until precision drive is constructed and Light & Power
will extend is facilities with that construction.
Comment Number: 2
Comment Originated: 03/18/2015
03/18/2015: Light & Power will need to break into an existing duct bank in Ziegler
Rd. to extend conduits and power down the proposed Precision Dr. This duct bank
is shown to be out toward the middle of Ziegler beyond the scope of asphalt repairs
shown. Asphalt repairs will need to be broadened to include this construction.
Comment Number: 3
Comment Originated: 03/18/2015
03/18/2015: Temporary construction power to this site could be problematic given
there is no power available until Precision Dr. is constructed and the duct bank in
Ziegler is tapped into and brought down Precision. Contact Light & Power
Engineering @ 970-221-6700 to coordinate power needs.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, ilvnxwiler(ftoudre-fire.org
Topic: General
Comment Number: 1
Comment Originated: 03/18/2015
03/18/2015: PFA recommends relocation of the hydrant on the northwest access
drive to better align with the looped turnaround. Please contact me with any
questions regarding exact location.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, ischlamCcDfcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 03/05/2015
03/05/2015: Erosion Control Plan has redlines that need correcting. Erosion Control
Escrow will need to be recalculated with the changes to the erosion control plan.
Erosion Control Report was not complete and doesn't meet standards even with the
notes attached to the plans. A full erosion control report needs to be completed.
Contact: Shane Boyle, 970-221-6339, sbovle(cDfcgov.com
Topic: General
Comment Number: 2
Comment Originated: 03/17/2015
03/1712015: Please provide more spot elevations on the Grading Plan to better
convey drainage patterns. This includes top and toe of the detention pond and
flowline elevations for all portions of the parking lot. Also, please call out the spillway
limits and elevations on the Grading Plan.
Comment Number: 3
Comment Originated: 03/17/2015
03/17/2015: The note,on the Cole Grading Plan and Utility Plan refer to Aspen plans
for everything outside of the Mainstreet parcel, however it appears there is also
some onsite improvements shown on Aspen's plans that also should be referenced
in this note such as the onsite drainage design, LID improvements, fire hydrant
relocation and 12" water main installation, storm sewer outfall, etc. Please revise
this note to appropriately capture onsite improvements shown on Aspen's plans for
clarity.
Page 4 of 6
Comment Nun._ar: 1
Coi....,ent Originated: 03/17/2015
03/17/2015: The Landscape Plan for Precision Drive shows the installation of trees
and parkway landscaping along the entire portion of Precision Drive (not just
abutting Mainstreet). Is this to be installed with the construction of the road and
Mainstreet? As the plans only show construction of the sidewalk along Mainstreet's
frontage, the installation of the parkway and trees along all of Precision Drive without
providing the sidewalk would seem to be awkward in terms of ensuring irrigation and
parkway aren't impacted by the construction of the walk in the future. If there's an
opportunity to construct all of the sidewalk along both sides of Precision Drive now,
that would certainly be preferable and the placement of parkway and trees
concurrently would then not be a concern.
Comment Number: 2
Comment Originated: 03/17/2015
03/17/2015: The Cole drawings (site and civil) indicate a 15' irrigation easement
behind the Ziegler Road right-of-way. Please indicate this as a 15' existing utility
easement.
Comment Number: 3
Comment Originated: 03/17/2015
03/17/2015: What is the narrow rectangle 40 feet south of the northwest comer of
the site that is shown abutting the sidewalk along Ziegler Road? Any sort of sign or
structure can't abut the sidewalk along Ziegler Road and must be shown with a two
foot offset from the sidewalk.
Comment Number: 4 Comment Originated: 03/17/2015
03/17/2015: The legal descriptions for the offsite easements are under Technical
Services review.
Topic: Site Plan
Comment Number: 5 Comment Originated: 03/17/2015
03/17/2015: The ownership certification on the site plan shows the City as the
owner? Please correct.
Comment Number: 6
Comment Originated: 03/17/2015
03/17/2015: The existing conditions sheet (Sheet 2) isn't typically in the site plan set
and is already included in the civil (utility) plan set.
Department: Internal Services
Contact: Todd Reidenbach, ,
Topic: General
Comment Number: 1
Comment Originated: 03/17/2015
03/17/2015: 1. Addresses will be assigned by the GIS Department after the
plans have met final approval through Development Review and are recorded with
the City.
TODD REIDENBACH, GISP
GIS Mapping Specialist — Information Technology
City of Fort Collins
215 N. Mason St, 3rd Floor
970-416-2483 office
970-221-6329fax
treidenbach@fcgov.com
Department: Light And Power
Contact: Rob Irish, 970-224-6167, rirish(cDfcgov.com
Topic: General
Page 3 of 6
Contact: Marc Virata, S. ,-221-6567, mvirataCa)_fcgov.com
Topic: Construction Drawings
Comment Number: 7 Comment Originated: 03/17/2015
03/17/2015: The onsite (Cole) grading plan appears a little ambiguous as to
whether the existing ditch along the backside of Ziegler is going to be eliminated and
regraded. Distinction perhaps between proposed and existing contour lines might
clarify?
Comment Number: 8
Comment Originated: 03/17/2015
03/1712015: The construction details for access ramps and drive approaches have
recently been updated in LCUASS. Please update the details on both the Cole and
Aspen sheets using the following link:
http:/Ilarimer. org/engineering/G MARd Stds/2014%20Changes/Standard_Drawi ngs. ht
ml
Comment Number: 9
Comment Originated: 03/17/2015
03/17/2015: The temporary construction easement on the south side of Precision
isn't depicted fully to the east (corresponding with the legal description) on the civil
plans.
Comment Number: 10
Comment Originated: 03/17/2015
03/17/2015: From my point of view, I don't need to have the reception numbers
associated with the offsite easements shown on the civil drawings. Assuming other
departments concur it may be less of a timing issue to not place reception numbers
and leave it at "by separate document."
Comment Number: 11
Comment Originated: 03/17/2015
03/17/2015: The asphalt limits of street patching for Precision Drive out to Ziegler
Road should depict the entire bike lane width for the new street connection.
Comment Number: 12
Comment Originated: 03/17/2015
03/17/2015: For the Precision Drive tie-in to Technology Parkway, I'm
understanding that the existing curb and gutter is to be removed and replaced with a
crosspan. The plans don't depict a standard City crosspan however and appear to
depict a gutter. Please mimic the depiction of the crosspan as was done with the
Ziegler/Precision intersection.
Comment Number: 13
Comment Originated: 03/17/2015
03/17/2015: Please ensure that spot elevations are provided in accordance with
LCUASS 7-27. The Precision/Ziegler and Precision/Technology intersections need
additional spot elevations around the curb returns and specify the transition point to
remove the Precision crown. The Precision/Technology intersection needs
additional spot elevations for the crosspan that's not currently delineated.
Comment Number: 14
Comment Originated: 03/17/2015
03/17/2015: Please indicate the access ramps on the southwest and northwest
comers of Technology Parkway and Precision as being constructed at this time, not
in the future as depicted in the plans. (This comment applies, regardless whether or
not parkway and trees are installed along both sides of the entire Precision Drive
frontage, as previously commented.)
Comment Number: 15
Comment Originated: 03/17/2015
03/17/2015: Please show the irrigation line crossing Precision Drive as being
sleeved from right-of-way to right-of-way.
Topic: General
Page 2 of 6
City of
F6rt
Collins
March 20, 2015
Eric Morff
COLE & ASSOCIATES, INC.
401 S 18TH STREET SUITE 200
St. Louis, MO 63103
RE: Mainstreet Health & Wellness Suites, FDP150006, Round Number 1
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. com/developmenheview
Please see the following summary of comments from City staff and outside reviewing agencies for
your submittal of the above referenced project. If you have questions about any comments, you may
contact the individual commenter or direct your questions through the Project Planner, Noah Beals, at
970-416-2313 or nbeals@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Noah Beals, 970-416-2313, nbealsicDfcaov.com
Topic: General
Comment Number: 1
Comment Originated: 03/17/2015
03/17/2015: Signs and there locations will need to be removed from the plans. Or a
note included that signs and locations are not approved with the Final Plan and will
be approved through a separate sign permit.
Comment Number: 2
Comment Originated: 03/17/2015
03/17/2015: On the elevation sheets there are some notes that refer to a detail but
no detail is included. Please include the details.
Please eliminate the full color elevation and provide note details of the colors on the
other elevation sheets.
Comment Number: 3 Comment Originated: 03/17/2015
03/17/2015: Revise the note on the increase height to indicate P&Z approval.
Comment Number: 4 Comment Originated: 03/20/2015
03/20/2015: Please elminate the existing conditions on the site plan.
Comment Number: 6 Comment Originated: 03/20/2015
03/20/2015: Please add to ornamental trees 15' spacing from the street light along.
Ziegler, to close up the gap of streets.
Comment Number: 6
Comment Originated: 03/20/2015
03/20/2015: Transportation planning stated the sidewalk on Precision Drive does
not need to be completed all the way to Technology Parkway, only along the
frontage of project area.
Department: Engineering Development Review
Page 1 of 6