Loading...
HomeMy WebLinkAboutFOSSIL LAKE PDP, 4TH FILING - PDP - 33-01G - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject: Planner: f oa e s Engineer: i 1 Traffic Operations: Date: 1410 Items Requested Site Land Plat Utility Drainage Rpt Other Items Required Engineering Redlined Items Being Returned Site land Plat Utility Drainage fl t Other Items Being Returned itormwater- x Water/Wastewate - Traflic Operations — Trans, Planning <x — Transfort — -- Natural Resources Park Planning Totals Other: Note: All redlined items should be returned with the resubmittal/ revislons, Revisions , 1 ' / ' • • j / all • �� Flu: PROJECT PLANNER IN NO . , s®s®mIN LIGHT & POWER m ON - mm ;. .:. , . oR-O.W. ne©o� o������ PLANNING WATER CONSERVATION..i..� No�� POST OMCE eai���������� PUBLIC SERVICE WON SCHOOLS: POUDRE IPSON ON NO ao�aia�ON m mNo STATE HIGHWAY DEPARTMENT NO m RAILROAD: UP or BN/CS �0����iiiiii� mom WIN �No�iiiiiiii�