HomeMy WebLinkAboutFOSSIL LAKE PDP, 4TH FILING - PDP - 33-01G - CORRESPONDENCE - REVISIONS (4)110. Sheri Wamhoff-Engineering-General (4/9/03) Tricia Kroetch Additional elevations provided as requested. 111. Sheri Wamhoff-Engineering-General (4/9/03) Tricia Kroetch Pans/details have been adjusted for consistency. 112. Sheri Wamhoff-Engineering-General (4/9/03) Tricia Kroetch Dave Brown It is intended that improvements will be constructed to the property line. Applicant is aware of the funding requirement if otherwise. The pending easement agreement with the property owner to the north (see comment #26) does (also) specify attention to final grades. 113. Sheri Wamhoff-Engineering-General (4/9/03) Tricia Kroetch The requested variance regarding minimum vc lengths is being submitted concurrently with this final general submission. 114. Sheri Wamhoff-Engineering-General (4/9/03) Tricia Kroetch Ramp details have been adjusted as requested. 115. Troy Jones -Current Planning -General (4/9103) Dave Brown This project was approved without condition on June 19, 2003. 7/30/2003 Page 3 of 3 90. Sheri Warn hoff-Engineed ng-General (10/30/02) Tricia Kroetch The required 2 feet of cover cannot be maintained at the flowline. The required two feet of cover is achieved in all but three feet of horizontal distance. A variance request in this regard is attached herewith. 96. Tom Reiff -Transportation Planning -Transportation (3/28/03) Dave Brown Applicant has discussed this requirement with Splitgerber Construction, developer (under Larimer County) of the "Hearthside" development to the west of the Fossil Lake PDP 4th. Applicant and Splitgerber have agreed to coordinate to ensure construction of the requested ramp, the location of which is now indicated on the plans submitted herewith. Applicant suggests, given the construction chronology of both developments, that this requirement be included as a condition of both Development Agreements. 97. (Basil Hamdan)-Stormwater Utility (4/8/03) Tricia Kroetch Dave Brown Preliminary hard utility design has already been discussed and planned. No lines are anticipated parallel to Storm 2. L&P lines are located west of Dripping Rock Lane, not on the east side. 98. (Basil Hamdan)-Stormwater Utility (4/8/03) Tricia Kroetch Size and type for all storm sewers and inlets are called out on the plan sets. 99. (Basil Hamdan)-Stormwater Utility (4/8/03) Tricia Kroetch Pipe invert elevations and top of grate elevations are called out on the grading plan. 100. (Basil Hamdan)-Stormwater Utility (4/8/03) Tricia Kroetch 100 year HGL elevations are included on storm sewer profiles. 101. Troy Jones -Current Planning -General (4/9/03) Brad Massey Sheet labels have been changed as requested. 102. Troy Jones -Current Planning -General (4/9/03) Brad Massey Tree species have been adjusted as requested. 103. Terry Farrill-FC-L/SFC-WateNWastewater (4/9/03) No comments outstanding 104. Len Hilderbrand-Xcel Energy (4/9/03) Dave Brown No comment indicated. 105. Len Hilderbrand-Xcel Energy (4/9/03) Dave Brown Applicant has already held preliminary design discussions with Xcel. 106. Len Hilderbrand-Xcel Energy (4/9/03) Dave Brown Applicant is aware of contract and scheduling contacts. Applicant spoke with Xcel representative (again) on 7/22 to confirm present and planned status as okay. The specifics Xcel seeks will not be provided until a valid target start date for actual development is established. 107. Sheri Wamhoff-Engineering-General (4/9/03) Tricia Kroetch Approved variances have been noted. 108. Sheri Wamhoff-Engineering-General (4/9/03)) Tricia Kroetch Brad Massey Directional ramps have been noted as requested. Please see also comment #96. 109. Sheri Wamhoff-Engineering-General (4/9/03) Tricia Kroetch Brad Massey Steps are depicted on site and landscape plans. Final accessibility determinations are pending with Building Inspection. 7/30/2003 Page 2 of 3 FOSSIL LAKE PDP — 4T" FILING — TYPE I (LUC) July 30, 2003 TO: Troy Jones, City Planner FROM: KEM Builders, LLC, Dave Brown RE: Status on Review Comments dated 04/09/2003 — letter from Troy Jones to Brad Massey, Aller-Lingle Architects P.C. (Note: Responses have been placed in numerical order for reference.) # City Contact -Department -Topic Development Team Contact/Respondent Comment status/discussion Development Team: Dave Brown -- KEM Builders, LLC 223-4900 fax: 223-4901 Matt Delich -- Matthew J. Delich, P.E. 669-2061 fax: 669-5034 Patricia Kroetch -- North Star Design 686-6939 fax: 686-1188 Brad Massey -- Aller-Lingle Architects, PC 223-1820 fax: 223-1833 Larry Pepek -- King Surveyors, Inc. 686-5011 fax: 686-5821 Comments have been placed in numerical order for purposes of this response. Item numbers for comments which have been addressed (e.g., are not new or not carried over from previous submissions) have been deleted from this status. Significant modifications have been proposed for the Site Plan, focused on the addition of Fossil Lake Place as a direct access to Ziegler Road. Comments which would be irrelevant under the proposed modifications have also been so noted. 26. Sheri Wamhoff-Engineering-General (9/3/02) Dave Brown Tricia Kroetch Larry Pepek [This comment was retained from the previous review cycle.] The presently -submitted Site Plan does provide for a 20 foot by 51 foot easement at the north end of Dripping Rock Lane, for utility stubs. A letter of intent has been provided and Grantor has approved the easement and agreement. Signature and availability for recordation are less than 30 days outstanding. 70. Troy Jones -Current Planning -General (9/5/02) Dave Brown [This comment was retained from the previous review cycle, pending Applicant's submission of photometric drawings.] Two sets of Lighting Plan drawings (L1 and L2) are submitted herewith. These plans incorporate the additional lighting requested by City staff, general photometric representations, and fixture specifications. In addition, the Landscape Plan reflects changes to tree species at impacted locations as requested by staff. We trust that we will not be "caught in the middle" between landscape review requirements and lighting requirements. 86. Wes Lama rq ue-Sto rmwater Utility -Drainage (11/4/02) Tricia Kroetch WQ outlet structure comments have been addressed, and were included in the amended Utility Plans which were previously submitted. 88. Sheri Wamhoff-Engineering-General (11/6/02) Tricia Kroetch Dave Brown Profiles on this existing irrigation line are included on Sheets 3, 7, and 10 of 14 of the modified Utility Plans submitted herewith. The irrigation piping used is 18" C-905 DR25 PVC. Applicant believes it is fully sufficient, per engineering standards and coverage provided, to hold the standard roadway load. In lieu of acceptance of the above, Applicant proposes: • steel casing -- 30", .375" wall thickness • 18"x30" casing spacers -- P.S.I. Model S12-G2, stainless steel ■ 18"x30" end seals -- P.S.I. Model C • Dressor couplings — ROMAC Model RC-501 7/30/2003 Page 1 of 3