HomeMy WebLinkAboutTIDAL WAVE CARWASH - FDP - 38-01A - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEETProject: Tom- Lk�%E_ Date: 7' L
Planner: Traffic Operations: Engineer: 6.1c!'t
Items Requested
Redlined Items Being Returned
01
c
o
a
�°� Y
Other Items Required-r�'5
�?
Cn
[turned
p
rOthe tems being
Engineering
Stormwater
Water/Wastewater
!
1
l
1S
k
Traffic Operations
Transportation Planning
Transfort
Natural Resources
,
Park Planning
TOTALS
Other:
Note: All redlined items should be returned with the resubmittA/revisions.
ITEMWAVE PPP --
DATE RECEIVED: �� 11 �01
w
H
z
°
<
W
a
h
�.
W
aaaz?z
z o
C7
z W
o
w
u W
z a.o
Z
O
Fz
"1 o
�
a
FILE: PROJECT PLANNER
Z
't.
'�•
ENGINEERING PAVEMENT
ZONING
BUILDING INSPECTION
LIGHT & POWER
TECHNICAL SERVICES
FORESTRY
WATER & WASTEWATER/FCLD
PFA
POLICE - LORI DIGLIANI
ADVANCE PLANNING
STREETS
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
US WEST
PUBLIC SERVICE
SCHOOLS: POUDRE / THOMPSON
AT & T DIGITAL CABLE
CDOT
DITCH COMPANY
RAILROAD: UP or BNSF
REA/DOE/PRPA
i 'L
ZT-TH