HomeMy WebLinkAboutTIDAL WAVE CARWASH - PDP - 38-01 - CORRESPONDENCE - REVISIONS (3)Page 5
Tidal Wave Carwash, PDP
Department: Zoning
4
As was indicated in the first resubmittal, this is all self-service. The auto bays are "automatic
rollover" machines where the customer remains in the car. There are no employees other than
intermittent cleaning and maintenance, therefore there are no parking spaces.
5
As per the first resubmittal, Troy Jones of Current Planning issued an Administrative ruling that
a bicycle parking rack is not required due to the unique characteristics of a self serve carwash.
6
The Site Plan has been modified to remove traffic flow lines as recommended in comment #103
& #115. In addition, a traffic flow diagram has been provided with this resubmittal. We do not
plan to have directional arrows painted on the concrete drive area.
8
The location of all street trees has been coordinated with Tim Buchanan, City Forrester;
Cameron Gloss, Planning Director, Engineering and Excel Energy. The sidewalk at JFK
"pinches down" toward the curb at the required spacing for an additional street tree and it was
concluded an additional tree would not be necessary. In addition, we will trim the existing tree
at the corner of JFK and the driveway to prevent potential sight distance issues as per comment
#112.
Enclosed with this resubmittal are all redlined plans.
Please advise as to the next steps in the process. Thank you.
Sincerely,
Rhey Wright
Tidal Wave Carwash, PDP
Page 4
Tidal Wave Carwash, PDP
29
Done
Department: Excel Energy
76
Trees will meet the 4' minimum standard after determining the actual revised location of the
Troutman Parkway Gas line to be North of the existing sidewalk. This will allow planting of
street trees in the parkway as originally planned.
Department: Natural Resouces
Topic: Possible Wildlife Conflict
109
Acknowledged and confirmed as before.
Department: Transportation Planning
Topic: Site Plan
118
This sidewalk issue has been addressed with the proposed solution as described in the request for
variance to the City Engineering standards presented as part of this resubmittal.
Department: Water Wastewater
62
Per Mr. Roger Buffington's request we have included a plat of the Marketplace PUD property
which adjoins our site. This shows a utility easement extending from the adjoining property to
our site.
Topic: Utility Plans
120
The precise location of the gas line will be determined by Excel Energy through field location
prior to commencing this work and the location of the meter pit. The electric line does not run
through this area.
121
Revised as requested.
Page 3
Tidal Wave Carwash, PDP
Topic: Site Plan
39
The revised Site Plan now includes ROW and Property line weights to the Legend and contour
lines have been removed from both the plan and the legend.
115
Directional arrows have been removed from the Site Plan and included instead on the diagram
referenced in # 103.
Topic: Site/Landscape Plan
41
Existing features are now in a "ghosted" or dashed line weight, drainage easement is labeled and
dimensioned and ROW and Property line weights are on the legend.
110
The ramp and apron on the NE corner is now relabeled per this recommendation.
111
The two ramps on the south side of the property are existing. These line weights are now
ghosted to reflect this information as per the Utility Plans.
113
All contour and grading layers are removed on the revised plans.
116
Done
Topic: Utility Plans
13
The ROW, Utility and Drainage easement dedications were resubmitted on the current form on
1/l/02 with original copies provided to Current Planning. The Drainage easement dedication
exhibits now reflect changes that "close" this area.
15
The NE ramp and apron will be replaced as is reflected on the Utility Plans.
19
Done
Page 2 1
Tidal Wave Carwash, PDP
107
The Landscape and Site Plans now have the same title located in the lower right hand corner as
requested.
108
Acknowledged
125
Acknowledged
124
All redlines have been returned with this resubmittal.
Department: Engineering
117
The Site, Landscape and Utility Plans have now been coordinated to show that there are no
encroachments into the Utility easement. The building has been moved to the North 1' and the
South roof overhang reduced by 1' to avoid any such encroachments.
123
We have submitted a request for variance to the City Engineering standards relating to sidewalks
for both the Troutman and JFK sidewalks as per Susan Joy's recommendation. The variance
request asks for approval to repair and replace as necessary these sidewalks and to retain the 5'
width due to the anticipated ongoing problems with maintenance of a 1' sidewalk "ribbon and
joint" addition.
Topic: Landscape Plan
112
We have met with Excel Energy to precisely locate the gas line, which previously had been
shown in the parkway along Troutman Parkway. This gas line is actually North of the existing
sidewalk, therefore we are able to plant street trees in the parkway as previously shown on the
Landscape Plan. The actual location of the gas line is now shown on Site, Landscape and Utility
Plans. The existing tree on the south corner of the driveway and JFK will be trimmed back as
recommended to eliminate potential sight distance conflicts.
Project: Tidal Wave Carwash, PDP
January 28, 2002
Mr. Troy Jones
City Planner
Current Planning Department
City of Fort Collins
281 North College Ave
Fort Collins, CO 80521
Dear Troy:
The following are responses to the 1/11/2002 Staff Project Review for the above referenced
project:
Department: Current Planning
86
The Site Plan now includes more extensive labeling including concrete, on site curbs, drainage
trickle pans etc.
94
The roof plan and dividing walls for the self serve bays etc. have been removed from the Site
Plan as requested.
95
The Elevations now show an example of the 20' freestanding area light poles. These five poles
are also shown on the Site Plan and the Lighting Plan. In addition, the 10' light poles continue to
be shown on the Elevations for each of the autocashiers.
102
Enclosed is an 8 ''/z" x 11" diagram showing the vehicle drive area and the landscaping within the
vehicle drive area. Square footage measurements of each area and the percentage is also shown
on the diagram and the Site plan.
103
Enclosed is an 8 ''/z" x I I" diagram showing the on site circulation routes. These have been
removed from the Site Plan for clarity. No painted on striping is anticipated on the concrete
drive area.