HomeMy WebLinkAboutTIDAL WAVE CARWASH - PDP - 38-01 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEWU.
no
ance Planning:
3uild to lines will need to be adhered to as specified in the LUC (building
located between 10 and 25 feet behind street right-of-way.
If this is truly a self serve car wash that has no employees that stay on site
for a shift of duty, you may have a justifiable argument why not to provide a
connecting walkway from a "main entrance" to a street sidewalk. More
detailed discussion should take place on how to address this issue.
10. Current Planning:
a. Refer to Section 3 (General Development Standards), and Section 4.17 ( C -
Commercial Zoning District) in the Land Use Code for the standards that
apply to your propose development. The Land Use Code is available to view
on the internet at www.ci.fort-collins.co.us/CITY HALL/CODES.
b. A neighborhood meeting will be required because of the close proximity to
the fox den and neighborhood concern regarding impacts development in the
area may have on the foxes.
c. The land use code states in Section 3.5.3(8)(1) that, "at least one main
entrance of any commercial or mixed -use building shall face and open
directly onto a connecting walkway with pedestrian frontage." You are
proposing the use "minor vehicle repair, servicing, and maintenance," which is
a commercial building. As Advance Planning stated, you may have a valid y_
argument as to why you should not be required to satisfy this standard. We
{
have a process for requesting exceptions to the code. This process is called
a "modification of standards". Please contact me to discuss how to request a
modification if you determine that is the direction you would like to go with �t
this issue.
d. Section 3.5.3(C)(1) of the Land Use Code requires that commercial buildings
cannot exceed a height to width ratio of 1:3. As proposed, the elevations
shown depict a section of building that is more than 3 times wider than it is
tall, therefore this section would need to integrate variation in the massing
including both a change in height and a projecting or recessed element on
the facade.
e. Ron Fuchs was the planner at the conceptual review meeting, but the project
planner from this point on will be Troy Jones.
4
T. .... v.
191
Vastewater Utility:
Ex. Mains: 8-inch water and 8-inch sewer in JFK; 12-inch water and 8-inch
sewer in Troutman.
b. Any existing water/sewer lines which have been extended onto the site must
be used (if properly sized) or abandoned at the main\
c. A sand and oil interceptor will be required.
d. The water conservation standards for landscape and irrigation will apply to
the project.
e. Plant investment fees, water rights and a Warren Lake Trunk sewer repay
will be due at time of building permit.
5. Natural Resources:
a. If there any prairie dogs on site, they will have to be relocated or humainly
eraticated.
b. Trash enclosures should accommodate recycling containers of sufficient size
to accommodate the type of recycling appropriate for the building use, and
dumpsters must be enclosed within a fenced or walled area.
c. We ask that a single trash hauler be used to minimize traffic impacts.
d. Native grasses and plant materials should be used wherever appropriate, and
bluegrasses should be minimized.
e. If construction lasts for more than 6 months, you will have to file a permit
for fugitive dust control with Lorimer County.
6. Fire Department:
a. Contact Ron Gonzales of Poudre Fire Authority for fire code and emergency
access comments.
7. Light and Power:
a. An existing high voltage power line is available at the corner of JFK and
Troutman.
b. There is a pad mounted transformer on site.
c. You will need to fill out a commercial C1 form to estimate the needed
electrical loads.
d. 3 phase power is available.
e. 1,000 amps are available.
8. Transportation:
a. Please contact Kathleen Reavis of the Transportation Planning department
for any questions on sidewalks and pedestrian connectivity requirements.
3
C.
d.
ie land use would be considered "minor vehicle repair, servicing, and
F,luintenance."
Employee parking must be provided.
The layout of the site must meet parking lot layout and landscaping
requirements in the Land Use Code.
2. Stormwater Utility Department:
a. This site is located in the McClellands basin where the new development fees
are $3,717/acre and is subject to reduction based on the runoff coefficient.
(Grid #8P)
b. The standard drainage and erosion control reports and plans are required
and they must be prepared by a professional engineer registered in Colorado.
c. The site is in the HEART S.I.D. (special improvement district). The release
rate requirement is 0.85 cfs/acre using the new rainfall criteria.
d. Water quality extended detention is required.
e. The storm sewer connection is in the south portion of the site, which may
have an easement.
3. Engineering Department:
a. Street Oversizing Fees are $7,208.79 per stall. Check with Matt Baker for
the specific amount of this fee for your project.
b. The project will require a Traffic Impact Study (TI5) that addresses site
access, and all modes of transportation including automobile, bicycle,
pedestrian, and transit. Contact Eric Bracke for the automobile scope and
Kathleen for the pedestrian, bicycle, and transit scope of the study.
c. You will be required to have a Development Agreement, a Development
Construction Permit, and Utility Plans.
d. Additional right-of-way'must be dedicated along JFK and Troutman to
arterial standards (additional 7.5 feet).
e. Additional easement dedications will be required to provide 15 foot utility
easements from the new right-of-way edge.
f. Troutman and JFK will be required to be improved to city standards.
g. The city will need to evaluate access points along JFK and Troutman.
h. Contact Natural Resources (Kim Kriemeyer) regarding foxes and habitat
corridor.
i. More specific comments will be given at the time of submittal.
j. You may not be allowed to have make any new curbcuts on JFK or Troutman. n
The existing drive access will need to be looked at and possibly used as the
primary access to this property.
k. You may be required to improve the Troutman & JFK intersection, depending
on traffic impacts.
I. The Harmony. Corridor plan may require the sidewalk to be 8 feet wide.
2
i
j
ia
r
CONCEPTUAL RE�V1EW 4TA F t'0N4N4EP'�i'S
City of Fort Collins
MEETING DATE
ITEM:
APPLICANT:
LAND USE DATA:
June 12, 2000
Tidal Wave Corwash at the NW corner of JFK Parkway and
Troutman.
Rhey Wright
5238 Fox Hills Drive
Fort Collins, CO 80526
The car wash would have 5 self -serve bays and 2 automatic car wash bays (state of
the art). The property is currently zoned C - Commercial, and is owned by the City
of Fort Collins. Access easements from adjacent properties provide the
opportunity for access onto the property.
DEPARTMENTAL CONTACTS:
Current Planning-
Troy Jones
221-6750
Zoning Department-
Peter Barnes
221-6760
Engineering Department-
Tim Blandford
221-6605
Street Oversizing Coordinator-
Matt Baker
221-6605
Poudre Fire Authority-
Ron Gonzales
221-6570
Stormwater Utility-
Glen Schlueter
224-6065
Water & Sewer Utilities-
Roger Buffington
221-6854
._.._I__..__.. nl__._,_
ivuiurul Resources LlJevelopll-tenl P ica n e
v:. V
Kill, Krell;,>yer
72t._L.7Rn
_ .
Light and Power
Doug Martine
221-6700
Transportation Services (ped. & transit)
Kathleen Reovis
224-6140
Transportation Services (traffic)
Eric Bracke
224-6062
Tronsfort (local bus service)
Gaylene Rossiter
224-6195
Park Planning
Craig Foremean
221-6618
COMMENTS:
Zoning Department:
a. The property is in the C-Commercial zoning district, and is located within the
subarea additionally regulated by the Harmony Corridor Plan.
CO.MNllMf) PLANNING AND ENVIRONMENTAL ',ERVICES 2811Ni Colt-g,!A��c. I';�:.. � � ��I!:ns,�C) l!: � �!_n7-)p
CUI�kE:\'T I'LA\NI:\'G DLPARTINIENT
Comm...tity Planning and Environments --rvices
Current Planning
City of Fort Collins
I Cg�
Rhey Wright
5238 Fox Hills Drive
Fort Collins, CO 80526 .
June 16, 2000
Dear Mr. Wright:
For your information, attached is a copy of the 5taff's comments concerning
the Tidal Wave Car Wash presented before the Conceptual Review Team
on June 12, 2000.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions
to these comments may be made at the time of formal review of this
t
projec . s
P.ru.S3,L�
If you should have any questions regarding these comments or the nexf
steps in the review process, please feel free to call me at 221-6750.
Sin erely,
I
i
Troy . Jo s
City Planner
c.c Eric Bracke, Streets Department
Stormwater Department
Project Planner
File
T.J
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020
g. Mr. Bracke indicated that it would be preferable to close off existing, old/unused
curb cut off Troutman Pkwy. and provide access points from JFK and Troutman
Pkwy along the access drive adjacent to the property.
h. Kim Kriemeyer was contacted regarding the foxes. The only requirement might be
to put in screening material during construction to discourage foxes from entering the
site while under construction.
i./j See "g." above.
k. See "f' above.
1. See "f' above.
4. Water & Wastewater Utility.
a.- e. Per Mr. Roger Buffington, City Water and Utilities Manager, there is an 8" sewer
main stubbed in on the property. Dwight in the Water department researched water
access and indicated Applicant could tap into 12" line at the main in Troutman and run
appropriate size line from main to a meter pit on the property eg. 1 '/2". A sand/oil
interceptor system will be used at the carwash and all water fees etc. will be provided
prior to building permit. These Utility connections are shown on the Utility Plans
provided with the application.
5. Natural Resources
a. — d. There are no prairie dogs on the site. The Applicant will arrange for sharing of the
Trash enclosure on the West side of the property, that is now used primarily by a restaurant at
the Marketplace Shopping Center. The landscape plan will indicate the specific plant
materials used throughout. Construction is not anticipated to last longer than 6 months.
6. Fire Dept.
Initial contact with the Fort Collins Fire Dept. indicates the building will not be required to
have a sprinkler system. No other issues were identified.
7. Light and Power.
No issues identified. Applicant will complete a Commercial C1 form to estimate loads.
8. Transportation.
No issues identified.
9. Advance Planning.
a./b. Applicant has met with the Director and satisfied the requirements relating to build to
standards as per the site plan layout. The issue of a "connecting walkway" from a main
entrance has been settled due to a subsequent Code change excluding self serve car washes
from this standard.
10. Current Planning.
a. — e. A neighborhood meeting is scheduled for 9/18/01. Item 10, c. is no longer an issue as
the City Land Use Code has been changed relating to this item. This change excludes self
serve car washes from this code provision. Item 10, d. has been remedied with a redesign of
the building to meet the required height to width ratio standard.
Tidal Wave Carwash
Explanation of How Conceptual Review Issues Addressed
(June 12, 2000 CR letter attached)
COMMENTS:
Zoning Dept.
a. — d. Applicant understands zoning and staff has indicated proposed use fits with "C-
Commercial" as a Type I Review. The carwash will have an employee on site
intermittently (mostly the owner) for maintenance, cleaning etc. All parking lot and
landscaping requirements have been met as per the related site plan and landscape plan
documents and based upon discussions with the Director about additional interior
landscaping and vehicle lanes.
2. Stormwater Utility Department.
a. — e. All drainage/erosion control reports were prepared by North Star Design and are
included with the application. Water quality extended detention is provided per the
above reports.
3. Engineering Dept.
a. Spoke with Matt Baker, Street Oversizing Coordinator on issue of oversizing fees.
Per stall fees of $7208 referenced in Concept Review letter are for "Tunnel" full serve
car washes with much higher volumes than Tidal Wave Project. Per Mr. Baker, the
ITE std. used to develop fee was 108 cars per stall per day. For the six bay Tidal
Wave project this would equate to 648 total cars per day or 236,520 cars per year.
Tidal Wave projections show 15 cars per bay per day / 90 total per day / 32,400 total
per year or approximately 13% of the ITE volumes used to develop the fee. Mr.
Baker indicated that, the City Traffic Engineer could assist with the adjustment and
recalculation based upon these actual, more realistic volumes. In a separate
conversation, the City Traffic Engineer, Mr. Bracke, indicated he would assist with
this calculation.
b. Per Mr. Eric Bracke, , City Traffic Engineer, this project will not require a Traffic
Impact Study. This was confirmed in an e-mail message from Mr. Bracke to Mr.
Troy Jones (Current Planning) on 5/9/01. This e-mail message is enclosed with the
PDP application.
c. Development Agreement, Development Construction Permit and Utility Plans will be
provided.
d. — e. The project site plan indicates the additional 7.5 ft. of right of way along both
Troutman and JFK Parkway property lines. In addition, utility easements will be
dedicated 15 ft. from the new right-of-way edge. These will be dedicated by separate
documentation at the appropriate time (Deed of Dedication, prepared by Applicant).
f. Per discussions with Mr. Tim Blandford, City of Fort Collins Project Engineer, no
improvements re: curb/gutter, intersection are required as these streets were recent
additions in the city. Mr. Blandford indicated that Applicant may be able to achieve
sidewalk standards with "pour to" in 4' sections plus repair of existing sidewalk.
Applicant is prepared to meet City standards for sidewalk improvement and concrete
curbing at entrances from JFK & Troutman.