January 16, 2002
Page 3 of 3
2. See above for information relative to water quality.
3. Landscape separation — see above.
Engineering
1. See above for discussion on off -site construction easements.
2. Sidewalk and intersection details (ramps) have been added to the plans.
3. The Developer acknowledges that a Development Agreement may be needed for this
project.
Transportation Planning
1. Additional coordination has taken place on pedestrian connectivity and we are confident
this issue has been resolved.
These comments were prepared by JR Engineering and Ed Zdenek. We look forward to working
with the City to finalize this project. If you have any questions or comments, or need additional
information, please do not hesitate to contact me at (970) 491-9888. Thank you.
Sincerely,
DTGDVi
avilockeman, P
Division Manager
cc: Ed Zdenek, ZTI Group
Mr. Steve Olt
January 16, 2002
Page 2 of 3
17 Additional coordination has taken place with Transportation Planning and the sidewalks
as shown are acceptable.
21 The Developer acknowledges that a Development Construction Permit will be required
for the project prior to any construction.
Light and Power
5 No Comments
Natural Resources
10 No issues
PFA
11 No new comments — All previous comments have been addressed or acknowledged.
Police
11 After further discussion, it was determined that the lighting plan was not required.
Stormwater Utility
6 Additional information and requirements relative to development of Lot 2 have been
added to the plans and Drainage Report
7 Additional information has been added to the Drainage Plan and Report for the swale at
the rear of the property.
8 Tree Separation from storm sewer lines - A utility coordination meeting has been set for
Friday, January 18, 2002, to hopefully bring this item to closure.
9 A detail and additional notes have been added from raising the grate on the existing area
inlet.
Transportation Planning
22 An additional bike rack has been added on the west side of the building.
Water / Wastewater
18 Tree Separation from water/wastewater lines - A utility coordination meeting has been set
for Friday, January 18, 2002, to hopefully bring this item to closure.
19 The building envelope for Lot 2 has been removed.
20 Additional utility easements have been added to the enclose all utilities.
Zoning
1 The building envelope for Lot 2 has been deleted.
2 The HC spaces have been relocated at the rear of the building to be adjacent to ramps.
3 Note 13 has been revised as requested.
4 The monument sign has been removed from the elevations.
Additional Comments from Staff Review on October 10, 2001:
Stormwater
1. See previous response for addressing stormwater concerns on Lot 2.
January 16, 2002
J R ENGINEERING
Mr. Steve Olt, Project Planner
City of Fort Collins — CPES
Current Planning
281 North College Avenue
P.O. Box 580
Fort Collins, Colorado 80522
Re: Wards Redevelopment — Responses for October 19, 2001 Review Comments
Dear Steve:
The following are responses to the City's review comment letter of October 19, 2001.
Current Planning
24 Information received in a letter from Burlington Northern
1. Boundary shown on plat is from deed, Title Commitment and previous plat.
Railroad will be coordinated with on this issue.
2.& 3. These items are not being addressed as the City will address these as part of the
Mason Street Corridor Project (per Mark Jackson).
Technical Services
25 1. The legal description is based on the record deed. The property does close based
on the measured dimensions. Our surveyors insist that this is OK. We will
schedule a meeting to discuss.
2. All boundary monuments are now described.
3. The red -lined plat comments have been addressed.
Public Service
26 1. Tree planting within 4 feet of gas lines — A utility coordination meeting has been
set for Friday, January 18, 2002, to hopefully bring this item to closure.
2. The Developer acknowledges that any relocation of gas lines will be at their
expense.
Engineering
13 A copy of the Plat has been added to the Utility Plan set
14 Off -site temporary construction easement have been added to the plans and are being
prepared under separate document.
15 The ramp detail has been modified on the plan set.
16 The Benchmarks have been revised.
2620 F:im 14a,.1:cct Ru:al, Soitc 190. Fun (:,,Ihns, 0 ) 80525
970-491 `I888 • Fax: 970 491 9984 • % ww% ircnginccrinh.com