Loading...
HomeMy WebLinkAboutCENTERPOINT PLAZA - FDP - 35-01A - CORRESPONDENCE - REVISIONS$TEWAru&ASSOCIATE$ Consulting Engineers and Surveyors REPLY TO PROJECT COMMENTS SHEET FOR PHASE 1, CENTERPOINT PLAZA Staff Comments dated 2/6/03 No. 152 VF Ripley No. 41 See Engineering Reply No. 74 See Engineering Reply No. 75 See Engineering Reply No. 102 See Engineering Reply No. 140 See Engineering Reply No. 141 See Engineering Reply No. 143 See Engineering Reply No. 136 Added 12-foot wide easement (6 foot on each side of Lots 1, 2, and 3 as requested and shown on final plat) No. 144 No Issues No. 146 See Storm drainage Reply No. 148 See Storm drainage Reply No. 151 See Storm drainage Reply No. 149 See Storm drainage Reply No. 150 See Storm drainage Reply No. 137 See Water/Wastewater Reply No. 145 See Water/Wastewater Reply No. 138 See Water/Wastewater Reply No. 139 See Water/Wastewater Reply Jack Blake Stewart & Associates, Inc. February 14, 2003 n� James H. Stewart and Associates, Inc. CENTERPONT PLAZA rcp1.2,,,=.j% Meldrum Street • P.O. Box 429 • Ft. Collins, CO 80522 970/482-9331 • Fax 970/482-9382