REPLY TO PROJECT COMMENTS SHEET
FOR
PHASE 1, CENTERPOINT PLAZA
Staff Comments dated 2/6/03
No. 152 VF Ripley
No. 41
See Engineering Reply
No. 74
See Engineering Reply
No. 75
See Engineering Reply
No. 102
See Engineering Reply
No. 140
See Engineering Reply
No. 141
See Engineering Reply
No. 143
See Engineering Reply
No. 136 Added 12-foot wide easement (6 foot on each side of Lots 1, 2, and 3 as requested
and shown on final plat)
No. 144 No Issues
No. 146
See Storm drainage Reply
No. 148
See Storm drainage Reply
No. 151
See Storm drainage Reply
No. 149
See Storm drainage Reply
No. 150
See Storm drainage Reply
No. 137
See Water/Wastewater Reply
No. 145
See Water/Wastewater Reply
No. 138
See Water/Wastewater Reply
No. 139
See Water/Wastewater Reply
Jack Blake
Stewart & Associates, Inc.
February 14, 2003