Loading...
HomeMy WebLinkAboutCENTERPOINT PLAZA - FDP - 35-01A - CORRESPONDENCE -ij Project: Planner: Traffic Operations: Date: 2�5 D 3 Engineer: ' wC` [-4 Items Requested Redlined Items Being Returned ATEOther 5 v .� � Items Required y �^ a v c � °C p Other Items being Returned Engineering x K x -Da sty. Stormwater x X x x x Water/Wastewater x x X X X Traffic Operations Transportation Plannin Tra n sfo rt Natural Resources Park Planning TOTALS 2 'L Other: Note: All redlined items should be returned with the resubmittal/revisions. n REVISION ROUTING SHEET PROJECT PLANNER �eww��wiwwwwwww ENGINEERINGPAVEMENTwwwwwwwwwww • wwwwwwwwwwww BUILDING- wwwwwwwwwwww POWER ����w��wwwwwwww TECHNICALwwwwwwwwwwww • • wwwwwwwwwwww • - � wwwwwwwwwwww .. wwwwwwwwwwww • • • • wwwwwwwwwwww ADVANCE PLANNINGwwwwwwwwwwww • wwwwwwwwwwww - • PLANNING wwwwwwwwww • -CONSERVATIONwwwwwwwwwwww FORM • wwwwwwwwwwww wwwwwwwwwwww PUBLIC SERVICEwwwwwwwwwwww • • - • • - - wwwwwwwwwwww AT = T DIGITAL CABLEwwwwwwwwwwww llwwie wwwwwwwwwwww DITCH COMPANYww RAILROAD: U• or BNSFwwwwwww�wwiwww • • . • .... wwwwwwwwwwww owwwwwwwww wwwwwwwww wwwwwwwwwwww wwwwwwwwwwww wwwwwwwwwwww wwwwwwwwwww wwwwwwww wwwww wwwwwwwwwwww rd .lr_, q mr:.. 4� L4 M.4"m +) Please doiscuss in your Phase 1 report how off -site flows coming off of Timberline are being handled by this site Topic: Outlet Structure and spillway Number: 149 Created: 1 /31 /2003 Please provide a construction level detail of the water quality outlet structure including steel reinforcement. Also provide a spillway detail with all appropriate elevations and dimensions. Topic: Storm Sewer Profile Number: 150 Created: 1/31/2003 Please provide a profile for the proposed 15 ADS pipe on the site. Department: Water Wastewater Issue Contact: Jeff Hill Topic: Plat Number: 137 Created: 1 /28/2003 Provide a 10 foot wide utility easement (centered on the existing water service) across lot 2 for the existing water service which extends to lot 3. Define the easements for the curb stops as utility easements. Provide a utility easement for the required fire hydrant at the end of the proposed water main. Department: Water Wastewater Issue Contact: Roger Buffington Topic: Utility plans Number: 145 Created: 1 /31 /2003 An acceptance has not yet been received for the sewer in Spring Creek Center; therefore, check to determine if the sewer is existing or if planned for future phases. Department: Water Wastewater Issue Contact: Jeff Hill Topic: Utility plans Number: 138 Created: 1 /28/2003 No water services are permitted beyond the last fire hydrant. Provide a benched area along the detention pond for the proposed curb stop and meter pit. Number: 139 Created: 1 /28/2003 Provide an in -line valve just past the required fire hydrant to facilitate future extension of the water main. See site, landscape and utility plans for other comments. Be sure and return all of your redlined plans when you re -submit If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yo s Truly, S eve Olt W City Planner Page 3 Topic: Utility plans Number: 102 Created: 5/14/2002 All work within the Platte River Power Authority non -buildable easement needs to be approved by Platte River power Authority. They will need to sign the plans showing they approve of the work and improvements shown within their easement. Number: 140 Created: 1 /29/2003 Add the truncated dome details to the plans. Choose the detail you want to add either the CDOT details or the Greeley details. These will be used until we develop our own. Number: 141 Created: 1 /29/2003 If the off site sewer in Spring Creek Center that this site is tieing into is not completely in the design for the portion that is not in place needs to be a part of these drawings Number: 142 Created: 1 /29/2003 Need to provide easements on the plat for the detention to be built with Building A and for the existing services to Lot 3. Number: 143 Created: 1 /29/2003 Fill out and return the Development Agreement information sheet Department: Light & Power Issue Contact: Doug Martine Topic: Plat Number: 136 Created: 1 /17/2003 A 6 ft. utility easement is required along both sides of the lot lines between lots 1 & 2, and lots 1 & 3. Also, there is an existing electric transformer adjacent to the west side of the existing building on lot 3. An 8 ft. utility easement centered on this transformer (and encopmassing the transformer) is required extending to the west property line of lot #3. Department: Natural Resources Topic: General Number: 144 No issues. Department: Stormwater Utility Issue Contact: Doug Moore Created: 1 /30/2003 Issue Contact: Basil Harridan Topic: Drainage Report Number: 147 Created: 1 /31 /2003 Please note that the original drainage report for the entire site has not been approved. The text of that reeport which is included with this Phase 1 submittal contains numerous references to elections that should be removed. Topic: Erosion and Sediment Control Number: 146 Created: 1 /31 /2003 Fifth Review January 28, 2003 CITY OF FORT COLLINS' standard erosion control notes must be on the plan, not Larimer county urban street standard notes. Topic: Off -site Easements Number: 148 Created: 1 /31 /2003 Please document that the off -site irmigation lateral that is being used to carry flows from this site is within a pre-existing drainage easment or provide such an easement. Topic: Off -site flows Number: 151 Created: 1 /31 /2003 Page 2 l.. STAFF PROJECT REVIEW Citvof Fort Collins VF RIPLEY ASSOCIATES Date: 2/6/2003 C/O LOUISE HERBERT 401 W. MOUNTAIN, SUITE 201 FORT COLLINS, CO 80521 Staff has reviewed your submittal for CENTERPOINT PLAZA PDP & FINAL COMPLIANCE - TYPE I (LUC), #35-01/A, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: Off -site flows Number: 152 Created: 2/6/2003 The request for alternative compliance to the City's parking allowance is acceptable based on the methods proposed to ensure that the "center" area of the parking lot will not be used for parking until Building B is constructed. The developers are being notified at this time that non-compliance with the Parking Code, by allowing parking in the aforementioned area when only Building A exists, could result in a citation for non-compliance from the Zoning Department. Department: Engineering Issue Contact: Sheri Wamhoff Topic: General Number: 41 Created: 10/2/2001 Will need an off -site easement for the driveway construction at the northeast corner of the site. This easement will need to be provided with the final compliance submittal. If for some reason the easement can not be obtained, the plan can not be approved as shown and the layout may have to change to accomidate access requirement. 2/5/03 not yet provided still needed. Number: 74 Created: 10/5/2001 As was previously discussed this development can provide the city with a cash escrow for the design and construction of the local street portion of the improvements to Timberline Road adjacent to the site in lieu of doing this work at this time. 1/29/03 This cash in leiu of doing the design and improvements shall include the sidewalk along Timberline Road and the street trees along Timberline. The sidewalk along Timberline is not needed as a connection to a public walk for Building A, therefore this sidewalk should not be shown on the utility plans or the site plans. Number: 75 Created: 10/5/2001 This development needs to work with the developers of Spring Creek Center in accomplishing the improvements that are needed at the midpoint timberline intersection to accommodate truck traffic at this intersection. improvements to this intersection will be a condition of approval. (per Traffic) Plans for this improvemem will need to be provided and approved prior to final approval of this project if they have not already been received and approved. 2/5/03 The revision to Spring Creek Center have been approved. The improvements to this intersection will need to be done before a Certificate of Occcupancy can be obtained by any building in Spring Creek Center or Centerpoint Plaza. Page 1