HomeMy WebLinkAboutCENTERPOINT PLAZA - FDP - 35-01A - CORRESPONDENCE -ij
Project:
Planner:
Traffic Operations:
Date:
2�5 D 3
Engineer: ' wC` [-4
Items Requested
Redlined Items Being Returned
ATEOther
5
v
.�
�
Items Required
y
�^
a
v
c
� °C
p
Other Items being
Returned
Engineering
x
K
x
-Da sty.
Stormwater
x
X
x
x
x
Water/Wastewater
x
x
X
X
X
Traffic Operations
Transportation Plannin
Tra n sfo rt
Natural Resources
Park Planning
TOTALS
2
'L
Other:
Note: All redlined items should be returned with the resubmittal/revisions.
n
REVISION ROUTING SHEET
PROJECT PLANNER
�eww��wiwwwwwww
ENGINEERINGPAVEMENTwwwwwwwwwww
•
wwwwwwwwwwww
BUILDING-
wwwwwwwwwwww
POWER
����w��wwwwwwww
TECHNICALwwwwwwwwwwww
• •
wwwwwwwwwwww
• - �
wwwwwwwwwwww
..
wwwwwwwwwwww
• • • •
wwwwwwwwwwww
ADVANCE PLANNINGwwwwwwwwwwww
•
wwwwwwwwwwww
- • PLANNING
wwwwwwwwww
• -CONSERVATIONwwwwwwwwwwww
FORM •
wwwwwwwwwwww
wwwwwwwwwwww
PUBLIC SERVICEwwwwwwwwwwww
• • - • • - -
wwwwwwwwwwww
AT = T DIGITAL CABLEwwwwwwwwwwww
llwwie
wwwwwwwwwwww
DITCH COMPANYww
RAILROAD: U• or BNSFwwwwwww�wwiwww
• • . • ....
wwwwwwwwwwww
owwwwwwwww
wwwwwwwww
wwwwwwwwwwww
wwwwwwwwwwww
wwwwwwwwwwww
wwwwwwwwwww
wwwwwwww
wwwww
wwwwwwwwwwww
rd .lr_, q mr:..
4� L4 M.4"m +)
Please doiscuss in your Phase 1 report how off -site flows coming off of Timberline are being handled by this site
Topic: Outlet Structure and spillway
Number: 149 Created: 1 /31 /2003
Please provide a construction level detail of the water quality outlet structure including steel reinforcement. Also
provide a spillway detail with all appropriate elevations and dimensions.
Topic: Storm Sewer Profile
Number: 150 Created: 1/31/2003
Please provide a profile for the proposed 15 ADS pipe on the site.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Plat
Number: 137 Created: 1 /28/2003
Provide a 10 foot wide utility easement (centered on the existing water service) across lot 2 for the existing water
service which extends to lot 3. Define the easements for the curb stops as utility easements. Provide a utility
easement for the required fire hydrant at the end of the proposed water main.
Department: Water Wastewater Issue Contact: Roger Buffington
Topic: Utility plans
Number: 145 Created: 1 /31 /2003
An acceptance has not yet been received for the sewer in Spring Creek Center; therefore, check to determine if the
sewer is existing or if planned for future phases.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Utility plans
Number: 138 Created: 1 /28/2003
No water services are permitted beyond the last fire hydrant. Provide a benched area along the detention pond for the
proposed curb stop and meter pit.
Number: 139 Created: 1 /28/2003
Provide an in -line valve just past the required fire hydrant to facilitate future extension of the water main.
See site, landscape and utility plans for other comments.
Be sure and return all of your redlined plans when you re -submit
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yo s Truly,
S eve Olt W
City Planner
Page 3
Topic: Utility plans
Number: 102 Created: 5/14/2002
All work within the Platte River Power Authority non -buildable easement needs to be approved by Platte River power
Authority. They will need to sign the plans showing they approve of the work and improvements shown within their
easement.
Number: 140 Created: 1 /29/2003
Add the truncated dome details to the plans. Choose the detail you want to add either the CDOT details or the Greeley
details. These will be used until we develop our own.
Number: 141 Created: 1 /29/2003
If the off site sewer in Spring Creek Center that this site is tieing into is not completely in the design for the portion that
is not in place needs to be a part of these drawings
Number: 142 Created: 1 /29/2003
Need to provide easements on the plat for the detention to be built with Building A and for the existing services to Lot 3.
Number: 143 Created: 1 /29/2003
Fill out and return the Development Agreement information sheet
Department: Light & Power Issue Contact: Doug Martine
Topic: Plat
Number: 136 Created: 1 /17/2003
A 6 ft. utility easement is required along both sides of the lot lines between lots 1 & 2, and lots 1 & 3. Also, there is an
existing electric transformer adjacent to the west side of the existing building on lot 3. An 8 ft. utility easement centered
on this transformer (and encopmassing the transformer) is required extending to the west property line of lot #3.
Department: Natural Resources
Topic: General
Number: 144
No issues.
Department: Stormwater Utility
Issue Contact: Doug Moore
Created: 1 /30/2003
Issue Contact: Basil Harridan
Topic: Drainage Report
Number: 147 Created: 1 /31 /2003
Please note that the original drainage report for the entire site has not been approved. The text of that reeport which is
included with this Phase 1 submittal contains numerous references to elections that should be removed.
Topic: Erosion and Sediment Control
Number: 146 Created: 1 /31 /2003
Fifth Review
January 28, 2003
CITY OF FORT COLLINS' standard erosion control notes must be on the plan, not Larimer county urban street
standard notes.
Topic: Off -site Easements
Number: 148 Created: 1 /31 /2003
Please document that the off -site irmigation lateral that is being used to carry flows from this site is within a pre-existing
drainage easment or provide such an easement.
Topic: Off -site flows
Number: 151
Created: 1 /31 /2003
Page 2
l.. STAFF PROJECT REVIEW
Citvof Fort Collins
VF RIPLEY ASSOCIATES Date: 2/6/2003
C/O LOUISE HERBERT
401 W. MOUNTAIN, SUITE 201
FORT COLLINS, CO 80521
Staff has reviewed your submittal for CENTERPOINT PLAZA PDP & FINAL COMPLIANCE
- TYPE I (LUC), #35-01/A, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Off -site flows
Number: 152 Created: 2/6/2003
The request for alternative compliance to the City's parking allowance is acceptable based on the methods proposed to
ensure that the "center" area of the parking lot will not be used for parking until Building B is constructed. The
developers are being notified at this time that non-compliance with the Parking Code, by allowing parking in the
aforementioned area when only Building A exists, could result in a citation for non-compliance from the Zoning
Department.
Department: Engineering Issue Contact: Sheri Wamhoff
Topic: General
Number: 41 Created: 10/2/2001
Will need an off -site easement for the driveway construction at the northeast corner of the site.
This easement will need to be provided with the final compliance submittal. If for some reason the easement
can not be obtained, the plan can not be approved as shown and the layout may have to change to accomidate
access requirement. 2/5/03 not yet provided still needed.
Number: 74 Created: 10/5/2001
As was previously discussed this development can provide the city with a cash escrow
for the design and construction of the local street portion of the improvements to
Timberline Road adjacent to the site in lieu of doing this work at this time. 1/29/03 This
cash in leiu of doing the design and improvements shall include the sidewalk along
Timberline Road and the street trees along Timberline. The sidewalk along Timberline
is not needed as a connection to a public walk for Building A, therefore this sidewalk
should not be shown on the utility plans or the site plans.
Number: 75 Created: 10/5/2001
This development needs to work with the developers of Spring Creek Center in
accomplishing the improvements that are needed at the midpoint timberline intersection
to accommodate truck traffic at this intersection. improvements to this intersection will be a
condition of approval. (per Traffic) Plans for this improvemem will need to be provided and approved prior to
final approval of this project if they have not already been received and approved. 2/5/03 The revision to Spring
Creek Center have been approved. The improvements to this intersection will need to be done before a
Certificate of Occcupancy can be obtained by any building in Spring Creek Center or Centerpoint Plaza.
Page 1