HomeMy WebLinkAboutCENTERPOINT PLAZA - PDP - 35-01 - CORRESPONDENCE - (11)75 This development needs to work with the developers of Spring Creek Center in accomplishing the improvements that are needed at the midpoint timberline intersection to accommodate truck traffic at this intersection. improvements to this intersection will be a condition of approval. (per Traffic) Plans for this improvemew will need to be provided and approved prior to final approval of this project if they have not already been received and approved. 106 Once this project has gone to hearing (assuming one building and only one building can be built) the Final Plan submittal will need to only show the work and infrastructure for the one building to be built. All extra stuff and other building sites and services will need to be taken off of the plans. Can only put in the infrastructure for the one building. Because of the APF issues only 1 building can be built - so only 1 building can receive final approval. Thus only that building that receives final approval and its associated needs (sidewalk, parking lot services, driveway, etc) can be built. The rest can not be built or shown on the approved it will not have final approval. When the other building or buildings can be built they will need to come in for final approval with their own set or sets of plans for the improvements needed to serve that building(s). 107 Will need a letter of intent from the adjacent property owner for the off -site easement prior to being scheduled for a hearing. 128 If any of the proposed uses are changed - the traffic studies will need to be updated. Topic: Site Plan 35 Show the future 7-foot sidewalk along Timberline Road. It would be best to not have dual walks along here. Widen out the 5-foot walk on site to meet the 7-foot standard or build and use the 7-foot walk to meet the connection needs you are showing. 5/7/02 Need to show the sidewalk as being built - it will be needed to connect to building B if that is the building to be built. Will need a sidewalk connection that does not cross a drive isle. Topic: Utility plans 67 See plans for additional comments. 102 All work within the Platte River Power Authority non -buildable easement needs to be approved by Platte River power Authority. They will need to sign the plans showing they approve of the work and improvements shown within their easement. 120 Add indemnification statement back onto the cover sheet Department: Light & Power Issue Contact: Bruce Vogel Page 3 C .. REVISION COMMENT SHEET DATE: July 10, 2002 TO: Forestry PROJECT: #35-01 Centerpoint Plaza PDP All comments must be received by Steve Olt no later than the staff review meeting: July 31, 2002 No Comment Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** C.(net 5, S,.....w. 4- A5Li 4L,ti4— S c/vur 1y 4�S grk .5 4 1 S µ i K i- �� c "'<ct l c w 5 I --t 6 -C ..n 1 .-C a 4-- O C^ { .e H 14 51 M T- LA1 5 r C +L�< e 4S4 S i :.4- A, o� i0a m E m d m o t ❑ LL U a u In co 0 a u ❑ C l,-,X F U a co LL vu S A w„ } �5� 1S Ao4— 4u CiA� .ou C� Cu �jNe1 i- ✓�+ o F -ew REC CURRENT P�NN�NG c Date: g— Z g- c Z Signature: Ca a HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _ Plat _ site _ Drainage Report Otlw Ut�7it9 _ Redline UtRity _ landscape 9 Clt 0 Z x N O a 1 134 The drainage re rt arbitrarily reduces the overtopping flows from 417 cfs to 350 cfs based on -spills that would darin' back into Spr' g Creek and then further reduces the flows onto the site to 20% of the leftover flows or roughly 70 cfs. In order to r uce these flows a hydraulic study that shows where the flows would cross Timberline is needed the City can accept these flow number reductions based on simple assumptions that are not supported by documentation. Department: Water Wastewater Issue Contact: Jeff Hill Topic: General 132 Coordinate site, landscape and civil plans to reflect the same information. See site, landscape and utility plans for other comments. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yours Truly, STEVE OLT City Planner Page 6 10 Sprinkler Requirements: Building B and C shall be fire sprinklered. NOTE: Poudre Fire Authority requires a "Knox Box" to be mounted on the front of every new building equipped with a required fire sprinklered system or fire alarm system. 97 UFC 902.4; PFA Policy 88-20 118 Comments dated 10-01-02 still pertain.. Department: Police Issue Contact: Joseph Gerdom Topic: Site Plan 100 May 2002: Inadequate lighting between building A and B. SW trash enclosure light still below minimum (0.7fc). Landscape materials at NE corner of Building A pose potential security risks. Department: Stormwater Utility Issue Contact: Basil Harridan Topic: Erosion and Sediment Control 121 Third Review July 30, 2002 There must be a note on the plan indicating clearly what is to be done with reseeding and mulching. Your note explains what the calculations in the report are for. It should say something to the effect that all disturbed areas not immediately landscaped must be reseeded and mulched. Please indicate that the detention area is to be utilized as a sediment trap (gravel filter, overexcavation, whatever) during construction. 133 Fourth Review August 29, 2002 Need standard City of Fort Collins erosion control notes on the plan. p _[_� Previous note #2 is not addressed. -- jf A1C -it {JAr N COVV �� LA. Q Topic: Mite Flows 122 Please note that this comment is critical for the approval of this project and has yet to be adequately addressed. The report states that the low point in the railroad is 100 feet west of Timberline, that is correct however the Spring Creek Master Plan model shows that the 417 cfs flows from the low area on the west side of Timberline eventually makes it across Timberline. A more detailed hydraulic modeling study is needed to assess how much of that total would make it across this site and what portion of it simply goes down Midpoint or goes north and will continue to do so. If the proposal is to channel the flows that would currently make it to your site north along Timberline, you need to analyze how these flows will make it into the Spring Creek channel without raising the flood depths in Timberline, or increasing the flooding potential on the adjacent property to the north. Another option is to take the flows that currently make it onto this site through and discharge them downstream without causing any adverse impact to neighboring properties. A detailed hydraulic analysis of the spill across Timberline was done by Northern Engineering in conjunction with the analysis of the site to the north. However a spill of 75 cfs was modeled, per the old rainfall flows. Much of the basic survey information can be used to analyze the spill with the new 417 cfs flow numbers. Page 5 WILL NEED TO COORDINATE TRANSFORMER LOCATIONS. ANY MODIFICATIONS TO THE ELECTRIC SYSTEM WILL BE AT THE EXPENSE OF THE DEVELOPER. 78 Refer to coments of 9-10-2001 Department: Natural Resources Issue Contact: Doug Moore Topic: General 131 No Issues at this time. Department: PFA Issue Contact: Michael Chavez 6 Required Access: A fire lane is required. The fire lane shall be visible by painting and signage, and maintained unobstructed. Minimum turning radius of access roadways must be 20 feet inside and 40 feet outside. All access roadways must be an all weather driving surface capable of supporting fire apparatus. The surface shall be asphalt, concrete, or compact road base. Additional surface criteria may be obtained from the City or County engineering departments. 97 UFC 901.3; 901.4.2; 902.2.1; PFA Administrative Policy 85-5 NOTE: A fire lane shall be required from the main entrance off Midpoint Drive and continue through the parking lots of Lot's 1 & 2. 7 Address Numerals: Address numerals shall be visible from the street fronting the property, and posted with a minimum 10-inch numerals on a contrasting background. 97 UFC 901.4.4 8 Water Supply: No commercial building can be greater then 300 feet from a fire hydrant. Fire hydrants are required with a maximum spacing of 600 feet along an approved roadway. Each hydrant must be capable of delivering 1500 gallons of water per minute at a residual pressure of 20 psi. 97 UFC 901.2.2.2 9 Building Area: Building A exceeds 5000 square feet and must be fire contained or fire sprinklered. 97 UBC Table 9B NOTE: Poudre Fire Authority requires a "Knox Box" to be mounted on the front of every new building equipped with a required fire sprinkler system or fire alarm system. 97 UFC 902.4; PFA Policy 88-20 Page 4 Because the ultimate east edge of Timberline Road adjacent to this property is not yet determined the Summit Ash street trees as shown should be moved to the east, 7' off of the west edge of the future 7' wide sidewalk. This will minimize potential adverse impacts to the trees. Please see the red -lined Landscape Plan. 117 The westernmost Marshall's Ash street tree along Midpoint Drive may have to be eliminated due to the possibility that the turning radius from Timberline Road into Midpoint Drive may have to be increased, potentially impacting that tree. 129 A copy of a letter received from Tom McCormick of the Platte River Power Authority is attached to this comment letter. His letter deals primarily with the type of some of the plant materials located within their easement and with safety concerns associated with the location of trash enclosures relative to their easement. Topic: Site Plan 101 The Burlington Northern Railroad, along the southwest side of this site, is now the Great Western Railroad. 112 The proposed amount of new parking spaces on Lots 1 & 2 is 28 spaces over what is allowed by the Land Use Code, based on the parking analysis on the plan. When calculating industrial parking allowances (0.75 spaces per employee) the number of employees should be multiplied by 0.75, not divided. 114 There are two separate trash enclosure locations shown on the south side of Building B on Lot 1. Are both of these trash enclosures needed? Topic: zoning 124 The Site Plan indicates, under the BUILDING USE DATA and Parking Analysis, that there is to be General Retail uses in Buildings A, B, and C. The E - Employment Zoning District does not permit General Retail unless it is located in a Convenience Shopping Center. The Centerpoint Plaza development does not meet the definition of, nor will it function as, a Convenience Shopping Center. The proposed retail uses could be defined as "accessory uses" to principal (primary) uses if they meet the following definition: "Accessory use shall mean a use of land or of a building or portion thereof customarily used with, and clearly incidental and subordinate to, the principal use of the land or building and ordinarily located on the same lot with such principal use." The way the General Retail uses are identified on the Site Plan would indicate that they are intended to be principal (primary) uses not associated with the office or industrial uses. Please refer to Peter Barnes comment (#119) in this comment letter. Department: Engineering Issue Contact: Sheri Wamhoff Topic: General 41 Will need an off -site easement for the driveway construction at the northeast corner of the site. 74 As was previously discussed this development can provide the city with a cash escrow for the design and construction of the local street portion of the improvements to Timberline Road adjacent to the site in lieu of doing this work at this time. Page 2 STAFF PROJECT REVIEW Cih* of Fort Collins VF RIPLEY ASSOCIATES Date: 9/4/2002 C/O LOUISE HERBERT 401 W. MOUNTAIN, SUITE 201 FORT COLLINS, CO 80521 Staff has reviewed your submittal for CENTERPOINT PLAZA PDP, TYPE I (LUC), #35-01, and we offer the following comments: FI-ill *13 Department: Current Planning Issue Contact: Steve Olt 77 The Current Planning Department comments are on red -lined Site, Landscape, Building Elevations, and Lighting Plans that are being forwarded to the applicant. Topic: General 113 The Traffic Operations Department is evaluating and determining if either Building A or Building B can be constructed under the Adequate Public Facilities regulation in the Land Use Code. Definitely only one building can move forward and submit Final Compliance Plans for that portion of the development. The Final Compliance Plans shall reflect only the building, associated parking, and improvements for that building requesting final approval. 115 City staff will not be supporting the Alternative Compliance Request for the "phase 1" parking for either Building A or Building B. Continuous paved access for emergency and service/delivery vehicles can be made for either Building A or Building B without constructing all the parking spaces. Please see Diagrams 1 & 2 that are being forwarded with this comment letter. 130 Depending on what is outcome determined regarding the General Retail land use issue, the Transportation Impact Analysis may have to be modified to reflect traffic impacts associated with this proposed development and how this affects the Adequate Public Facilities issue. Topic: Landscape Plan 108 The landscaping on Lot 1, around Buildings A & B and in the landscaped islands, has been decreased significantly from the first submittal. Why is this? 109 The loading/service area south of Building B is unscreened from Timberline Road. Landscaping meeting the screening requirements of the Land Use Code is needed. 110 More landscape screening is needed around the 2 trash enclosures south of Building B. See the red -lined Landscape Plan. ill Note #13 on the Landscape Plan must indicate that the security for the landscaping is for the materials and installation. Please see the red -lined Landscape Plan. 116 Page 1