HomeMy WebLinkAboutCENTERPOINT PLAZA - PDP - 35-01 - CORRESPONDENCE - REVISIONS (5)Please call if you have any questions or need further information.
Thank you for your consideration and we look forward to working with further you
during the development review process.
Sincerely
VF Ripley Associates
Louise Herbert
J
Items 9-10
Acknowledged. Nothing to address at this time.
Department: Stormwater Utility
Topic: Erosion and Sediment Control and Offsite Flows
See civil engineer's response.
Department: Transportation Planning
27
This item was address during the second round of comments dated 5/15/02.
VF Ripley called Mark Jackson on 8/13/02 to recheck the issue. Mark Jackson
reconfirmed he was satisfied that the APF issues had been addressed.
37
There are no improvements occurring along Midpoint Drive. VF Ripley
sent a memo to Mark Jackson 8/24/02 confirming that due to this no bike
lanes will be reflected at this time on Midpoint Drive. VF Ripley has had
no reply to the memo so we assume that this issue is acceptable. Please see
attached memo.
Topic: General
123
Bike Lanes. Please see above.
Department: Water Wastewater
See civil engineer's response.
Topic: Utility Plans
See civil engineer's response.
Department: Zoning
Topic: Zoning
119
The uses were reviewed with Planning and Zoning at a meeting on 8/13/02. The
permitted uses and parking analysis information has be revised and is shown on the Site
Plan.
J
Topic: Landscape Plan
129
VF Ripley has discussed the landscape comments with Tom McCormick at Platte River
Power Authority and removed all the large tress within the easement. Due to the removal
of the trees additional shrubs have been added to screen the parking on the south west
side of the site. See Landscape Plan.
Topic: Site Plan
Acknowledged. Please see response under item 124 — Zoning under Current Planning
above.
Department: Engineering
Topic: General
See civil engineer's response
Topic: Site Plan
35
A 7-foot sidewalk is shown along Timberline. A note has been added to the Site Plan
stating that the existing 5-foot existing asphalt walk is to be removed at a future date.
This comment was again recheck with Sheri Wamhoffby email on 8/16/02. Sheri
confirmed that the note was fine. Please see attached email.
Topic: Utility Plans
See civil engineer's comment
Department: Natural Resources
Items 71 and 131
Comments were addressed directly with Doug Moore during the second round of
comments dated 5/15/02. Doug Moore reconfirmed that all items have been addressed
and there are no further comments.
Department: PFA
Items 6-7
Acknowledged. Nothing to address at this time.
8
Acknowledged. This has been recheck by the civil engineer.
RECEIVED
AUG 2 7 2002
&LIRRENT PLANNING
„n
August 27, 2002
Steve Olt
Fort Collins Planning Department
281 North College Avenue
Fort Collins, CO 80524
Centerpoint Plaza PDP, Type 1 (LUC), H35-01
Response to staff Project Review comments
Dear Steve,
VF RIPLEY
ASSOCIATES INC.
Landscape Architecture
Urban Design
Planning
401 West Mountain Avenue
Suite 201
Fort Collins, CO 80521-2604
PHONE (970) 224-5828
FAX (970) 224-1662
We have reviewed the staff letter dated August 8, 02 and have the following comments:
Department: Current Planning:
Topic: Zoning
124
The applicant met with Planning and Zoning on 8/13/02 to review the permitted uses and
parking. This has been revised in accordance with the permitted and secondary uses in
Section 4.22 Employment Zone and parking under Section 3.2.2(K)(2)(a) and are shown
on the Site Plan. The building data has been changed to show the building square feet.
Topic: General
130
The traffic studies for buildings A and B have been rechecked with the permitted uses
and adequate public facilities. Please see attached revised memorandums for each
building.
113
Acknowledged. B will be submitted for Final Compliance.
115
A plan titled " Schematic Permitted Parking" has been submitted. This shows the
parking and driveways that would be constructed with building B.