HomeMy WebLinkAboutCENTERPOINT PLAZA - PDP - 35-01 - CORRESPONDENCE - REVISIONS (5)Please call if you have any questions or need further information. Thank you for your consideration and we look forward to working with further you during the development review process. Sincerely VF Ripley Associates Louise Herbert J Items 9-10 Acknowledged. Nothing to address at this time. Department: Stormwater Utility Topic: Erosion and Sediment Control and Offsite Flows See civil engineer's response. Department: Transportation Planning 27 This item was address during the second round of comments dated 5/15/02. VF Ripley called Mark Jackson on 8/13/02 to recheck the issue. Mark Jackson reconfirmed he was satisfied that the APF issues had been addressed. 37 There are no improvements occurring along Midpoint Drive. VF Ripley sent a memo to Mark Jackson 8/24/02 confirming that due to this no bike lanes will be reflected at this time on Midpoint Drive. VF Ripley has had no reply to the memo so we assume that this issue is acceptable. Please see attached memo. Topic: General 123 Bike Lanes. Please see above. Department: Water Wastewater See civil engineer's response. Topic: Utility Plans See civil engineer's response. Department: Zoning Topic: Zoning 119 The uses were reviewed with Planning and Zoning at a meeting on 8/13/02. The permitted uses and parking analysis information has be revised and is shown on the Site Plan. J Topic: Landscape Plan 129 VF Ripley has discussed the landscape comments with Tom McCormick at Platte River Power Authority and removed all the large tress within the easement. Due to the removal of the trees additional shrubs have been added to screen the parking on the south west side of the site. See Landscape Plan. Topic: Site Plan Acknowledged. Please see response under item 124 — Zoning under Current Planning above. Department: Engineering Topic: General See civil engineer's response Topic: Site Plan 35 A 7-foot sidewalk is shown along Timberline. A note has been added to the Site Plan stating that the existing 5-foot existing asphalt walk is to be removed at a future date. This comment was again recheck with Sheri Wamhoffby email on 8/16/02. Sheri confirmed that the note was fine. Please see attached email. Topic: Utility Plans See civil engineer's comment Department: Natural Resources Items 71 and 131 Comments were addressed directly with Doug Moore during the second round of comments dated 5/15/02. Doug Moore reconfirmed that all items have been addressed and there are no further comments. Department: PFA Items 6-7 Acknowledged. Nothing to address at this time. 8 Acknowledged. This has been recheck by the civil engineer. RECEIVED AUG 2 7 2002 &LIRRENT PLANNING „n August 27, 2002 Steve Olt Fort Collins Planning Department 281 North College Avenue Fort Collins, CO 80524 Centerpoint Plaza PDP, Type 1 (LUC), H35-01 Response to staff Project Review comments Dear Steve, VF RIPLEY ASSOCIATES INC. Landscape Architecture Urban Design Planning 401 West Mountain Avenue Suite 201 Fort Collins, CO 80521-2604 PHONE (970) 224-5828 FAX (970) 224-1662 We have reviewed the staff letter dated August 8, 02 and have the following comments: Department: Current Planning: Topic: Zoning 124 The applicant met with Planning and Zoning on 8/13/02 to review the permitted uses and parking. This has been revised in accordance with the permitted and secondary uses in Section 4.22 Employment Zone and parking under Section 3.2.2(K)(2)(a) and are shown on the Site Plan. The building data has been changed to show the building square feet. Topic: General 130 The traffic studies for buildings A and B have been rechecked with the permitted uses and adequate public facilities. Please see attached revised memorandums for each building. 113 Acknowledged. B will be submitted for Final Compliance. 115 A plan titled " Schematic Permitted Parking" has been submitted. This shows the parking and driveways that would be constructed with building B.