HomeMy WebLinkAboutCENTERPOINT PLAZA - PDP - 35-01 - SUBMITTAL DOCUMENTS - ROUND 4 - TRAFFIC STUDY (3)nczizuuu: signalizea intersections Release 4.1b
Analyst: Michael Inter.: Timberline/Prospect
Agency: Matthew J. Delich, P.E. Area Type: All other areas
Date: 11/17/01 Jurisd: Fort Coll' s
Period: am pm Year recent or bkgr total v
Project 0153 apf
E/W St: Prospect N/S St: Timberline
SIGNALIZED INTERSECTION SUMMARY
I Eastbound
I Westbound
I Northbound
I Southbound 1
I L T R
I
I L T R
I
I L T R
I
I L T
I
R 1
I
No. Lanes
1 1 2 0
I 1 2 0
I 1 1 0
1 1 1
1 I
LGConfig
I L TR
I L TR
I L TR
I L T
R I
Volume
1104 933 310
1412 872 35
1448 391 242
1110 368
141 1
Lane Width
112.0 12.0
112.0 12.0
112.0 12.0
112.0 12.0
12.0 1
RTOR Vol
1 0
1 0
1 0
1
0 1
Duration
0.25
Area
Type: All other
areas
Signal Operations
Phase Combination 1
2
3 4 1
5
6
7 8
EB Left
A
P
I NB
Left
A
A
A
Thru
P
I
Thru
A
A
Right
P
I
Right
A
A
Peds
X
I
Peds
X
WB Left
A
P
I SB
Left
A
A
Thru
P
(
Thru
A
Right
P
1
Right
A
Peds
X
I
Peds
X
NB Right
I EB
Right
SB Right
A
I WB
Right
Green
14.0
51.0
4.0
21.0
30.0
Yellow
0.0
3.0
0.0
0.0
3.0
All Red
0.0
2.0
0.0
0.0
2.0
Cycle Length: 130.0
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 288 1770 0.42 0.51 24.1 C
TR 1337 3407 1.09 0.39 94.1 F 88.7 F
Westbound
L 288
1770
1.66
0.51
355.0
F
TR 1381
3519
0.76
0.39
38.3
D 137.2 F
Northbound
L 438
1770
1.20
0.43
150.6
F
TR 689
1756
1.08
0.39
97.9
F 119.7 F
Southbound
L 193 1770 0.67 0.28 47.2 D
T 430 1863 1.01 0.23 95.2 F 71.5 E
R 597 1583 0.28 0.38 28.4 C
Intersection Delay = 108.5 (sec/veh) Intersection LOS = F
HCS2000: Signalized Intersections Release 4.1b
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
secs
TABLE 1
Short Range (2006) Base Condition
Peak Hour
LOS
Delay
Morning
F
107.6 secs.
Afternoon
F
108.8 secs.
TABLE
rip Generation
Building B (27,306 S.F.)
710
General Office .
5.0 KSF
11.01
55
1.37
7
0.19
1
0.25
1
1.241
6
150
Warehouse
20.306 KSF
4.96
104
0.37
8
0.08
2
0.12
2
0.39
8
495
Recrealion
2.0 KSF
22.88
46
0.87
2
0.45
1
0.60
1
1.16
2
Total
202
17
4
4
16
TABLE
Short Range (2006) Base Condition Plus Building B
Peak Hour
LOS
Delay
Increase in Delay
Morning
F
108.5 secs.
0.8%
Afternoon
F
110.8 secs.
1.8%
APPENDIX B
nwzvvv: 5ignaiizea intersections Release 4.1b
A>7alyst: Michael Inter.: Timberline/Prospect
Agency: Matthew J. Delich, P.E. Area Type: All other areas
Date: 11/17/01 Jurisd: Fort Col �-B's !2 �/
Period: am pm Year recent short bkgr total B L
Project ID 53 apf
E/W St: Prospect N/S St: Timberline
SIGNALIZED INTERSECTION SUMMARY
I Eastbound
I Westbound
I Northbound
I Southbound 1
I L T R
I
I L T R
I
I L T R
I
I L T
I
R I
I
No. Lanes
1 1 2 0
1 1 2 0
1 1 1 0
1 1 1
1 I
LGConfig
I L TR
I L TR
I L TR
I L T
R I
Volume
1121 925 420
1441 997 78
1407 545 176
165 526
140 I
Lane Width
112.0 12.0
112.0 12.0
112.0 12.0
112.0 12.0
12.0 1
RTOR Vol
1 0
1 0
1 0
1
0 I
Duration 0.25
Area
Type: All
other areas
Signal
Operations
Phase Combination
1
2
3
4 1 5
6
7
EB Left
A
P
1 NB Left A
A
A
Thru
P
1 Thru
A
A
Right
P
I Right
A
A
Peds
X
I Peds
X
WB Left
A
A
P
1 SB Left A
A
Thru
A
P
I Thru
A
Right
A
P
1 Right
A
Peds
X
I Peds
X
NB Right
1 EB Right
SB Right
A
1 WB Right
Green
4.0 14.0
48.0
4.0
15.0
35.0
Yellow
0.0 0.0
3.0
0.0
0.0
3.0
All Red
0.0 0.0
2.0
0.0
0.0
2.0
Cycle
Length: 130.0 secs
Intersection
Performance
Summary
Appr/
Lane
Adj Sat
Ratios
Lane
Group
Approach
Lane
Group
Flow Rate
Grp
Capacity
(s)
V/c
g/C
Delay
LOS
Delay
LOS
Eastbound
L
228
1770
0.58
0.42
29.5
C
TR
1245
3373
1.19
0.37
133.6
F
125.0
F
Westbound
L
343
1770
1.38
0.52
231.0
F
TR
1670
3501
0.69
0.48
27.8
C
86.9
F
Northbound
L
357
1770
1.16
0.42
139.5
F
TR
690
1794
1.07
0.38
93.4
F
110.0
F
Southbound
L 193 1770 0.39 0.32 36.1 D
T 502 1863 1.23 0.27 168.8 F 130.8 F
R 536 1583 0.31 0.34 32.1 C
Intersection Delay = 110.8 (sec/veh) Intersection LOS = F
HCS2000: Signalized Intersections Release 4.1b
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
nwzvuu: signaiizea tntersectrons Kelease 4.1b
Jknalyst: Michael Inter.: Timberline/Prospect
Agency: Matthew J. Delich, P.E. Area Type: All other areas
Date: 11/17/01 Jurisd: Fort Col
Period: am Year recent shor bkgr total
Project ID: 0153 apf
E/W St: Prospect N/S St: Timberline
No. Lanes
LGConfig
Volume
Lane Width
RTOR Vol
/AS G�
(�oN c>(-rw)
SIGNALIZED INTERSECTION
SUMMARY
I Eastbound
I Westbound
I Northbound
I Southbound 1
I L T R
I L T R
I L
T R
I L T
R I
I
I 1 2 0
I
1 1 2 0
I
I 1
1 0
I
I 1 1
I
1 I
I L TR
I L TR
I L
TR
I L T
R I
1121 924 420
1431 997 78
1402
544 176
165 526
140 1
112.0 12.0
112.0 12.0
112.0
12.0
112.0 12.0
12.0 1
1 0
1 0
1
0
1
0 1
Duration 0.25
Area
Type: All
other areas
Signal
Operations
Phase Combination
1
2
3 4
1 5
6
7 8
EB Left
A
P
I NB Left A
A
A
Thru
P
I Thru
A
A
Right
P
I Right
A
A
Peds
X
I Peds
X
WB Left
A
A
P
I SB Left A
A
Thru
A
P
I Thru
A
Right
A
P
I Right
A
Peds
X
I Peds
X
NB Right
I EB Right
SB Right
A
I WB Right
Green
4.0 14.0
48.0
4.0
Yellow
0.0 0.0
3.0
0.0
All Red
0.0 0.0
2.0
0.0
Cycle
Intersection
Performance
Summary_
Appr/
Lane
Adj Sat
Ratios
Lane Group
Lane
Group
Flow Rate
Grp
Capacity
(s)
v/c
g/C
Delay LOS
Eastbound
L
228
1770
0.58
0.42
29.5 C
TR
1245
3373
1.19
0.37
133.2 F
Westbound
L 343
TR 1670
Northbound
L 357
TR 690
15.0 35.0
0.0 3.0
0.0 2.0
Length: 130.0 secs
Approach
Delay LOS
124.7 F
1770
1.35
0.52
217.5
F
3501
0.69
0.48
27.8
C 82.0 F
1770
1.15
0.42
134.3
F
1794
1.07
0.38
93.0
F 107.8 F
Southbound
L 193 1770 0.39 0.32 36.1 D
T 502 1863 1.23 0.27 168.8 F 130.8
R 536 1583 0.31 0.34 32.1 C
Intersection Delay = 108.8 (sec/veh) Intersection
HCS2000: Signalized Intersections Release 4.1b
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
F
LOS = F
Phone: (970) 669-2061 Fax: (9.10) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
HCSGuuu: Signalized
intersections
Release 4.1b
Analyst:
Michael
Inter.:
Timberline/Prospect
Agency:
Matthew J. Delich, P.E_
Area Type:
All other areas
?A E
Date:
11/17/01
Jurisd:
Fort Col s
✓✓✓
Period:
am pm
Year
recent(Ehor •bkgrd total
C
Project
: 0153 apf
oA%rj1Y,01j
E/W St:
Prospect
N/S St:
Timberline
SIGNALIZED INTERSECTION SUMMARY
I Eastbound
I Westbound
I Northbound
I Southbound I
I L T R
I L T R
I L T R
I L T
R 1
No. Lanes
I
I 1 2 0
I
I 1 2 0
I
I 1 1 0
I
I 1 1
I
1 I
LGConfig
I L TR
I L TR
I L TR
I L T
R I
Volume
1104 928 310
1410 872 35
1447 391 242
1109 368
141 1
Lane Width
112.0 12.0
112.0 12.0
112.0 12.0
112.0 12.0
12.0 1
RTOR Vol
1 0
1 0
1 0
1
0 1
Duration 0.25
Area
Type: All
other areas
Signal
Operations
Phase Combination
1
2
3 4
1 5
6
7 8
EB Left
A
P
I NB Left A
A
A
Thru
P
i Thru
A
A
Right
P
I Right
A
A
Peds
X
I Peds
X
WB Left
A
P
I SB Left A
A
Thru
P
I Thru
A
Right
P
I Right
A
Peds
X
I Peds
X
NB Right
I EB Right
SB Right
A
i WB Right
Green
14.0 51.0
4.0 .21.0
30.0.
Yellow
0.0 3.0
0.0
0.0
3.0
All Red
0.0 2.0
0.0
0.0
2.0
Cycle
Length:
130.0 secs
Intersection
Performance
Summary
Appr/
Lane
Adj Sat
Ratios
Lane Group
Approach
Lane
Group
Flow Rate
Grp
Capacity
(s)
v/c
g/C
Delay
LOS
Delay
LOS
Eastbound
L
288
1770
0.42
0.51
24.1
C
TR
1336
3406
1.09
0.39
92.7
F
87.4
F
Westbound
L
288
1770
1.66
0.51
352.0
F
TR
1381
3519
0.76
0.39
38.3
D
136.0
F
Northbound
L
438
1770
1.20
0.43
149.7
F
TR
689
1756
1.08
0.39
97.9
F
119.3
F
Southbound
L
193
1770
0.66
0.28
46.9
D
T
430
1863
1.01
0.23
95.2
F
71.4
E
R
597
1583
0.28
0.38
28.4
C
Intersection Delay
= 107.6
(sec/veh) Intersection
LOS = F
IICS2000: Signalized Intersections Release 4.1b
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061 Fax: (9.10) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
APPENDIX A
O (O
lqt N (O
00 rn
qq- m O
(h
104/121
928/924 —�-
310/420
m
E
35/78
872/997
410/431
'**, f r
N It (O
O � �
� rn v
It C7 N
Prospect
AM/PM
N
SHORT RANGE (2006) BASE
PEAK HOUR TRAFFIC Figure 2
c N
E
35/78
872/997
412/441
Prospect
104/121 '**] f r
933/925 r• LO c0
310/420
CO rn v
v th N
- AM/PM
SHORT RANGE (2006) BASE PLUS Figure 3
BUILDING B PEAK HOUR TRAFFIC
0 ITco(O
v U')
�- N
CO M s-
� M W
J1�
97/112
786/820 - —
283/368
U-
27/61
+ 801 /910
327/327
ti f
P-
Lngt
rn rn
co ao
M CO �
AM/PM
Prospect
A&
N
RECENT (11/01) PEAK HOUR TRAFFIC Figure 1
criteria, the delay at the Prospect/Timberline intersection could not
exceed 109.8 seconds and 111.0 seconds in the respective peak hours. These
values reflect a 2 percent increase in delay at this intersection with the
current geometry.
In the course of conducting these evaluations, it was determined that
full development of Centerpoint Plaza (Buildings A, B, and C) would not
meet the APF criteria. In fact, development of Buildings A and B would
meet the APF criteria in the morning peak hour, but would not meet the APF
criteria in the afternoon peak hour. In light of this, an assignment was
conducted using just Building B. The trip generation for Building B is
provided in Table 2. The total floor area in Building B is 27,306 square
feet. As analyzed in this memorandum, the uses within Building B were 5000
square feet of general office, 20,306 square feet of warehouse, and 2000
square feet of indoor recreation. This trip generation was assigned to the
Prospect/Timberline intersection using the accepted trip distribution shown
in the cited TIS. The forecasted (2006) peak hour volumes are shown in
Figure 3. Table 3 shows the intersection level of service and delay using
the volumes shown in Figure 3. Calculation forms are provided in Appendix
B. The increase in delay is 0.8 percent and 1.8 percent in the respective
peak hours'. Based upon this analysis, it is concluded that Centerpoint
Plaza, Building B will meet the APF criteria at the Prospect/Timberline
intersection.
If, after Building B was approved for development by the City of Fort
Collins, Building A was proposed as a PDP or FDP to the City, an APF
analysis would be required. That analysis, like the Building B analysis,
would need to include the current traffic factored to reflect the analysis
year plus all approved developments which are not built at the time of the
Building A proposal. This would include Building B. From the foregoing
analyses reflected in this memorandum, it is likely that Building A would
meet the APF criteria.
MEMORANDUM
0
c�
0
CC)
cc
TO: Kevin Frazier
'
oo
Dick Fisher, Cobalt Design -Build
o
6
Louise Herbert, VF Ripley
Q
ED
City of Fort Collins
O
p
O
U
rn
FROM: Matt Delich may%
•
o
X
<
LL
DATE: August 26, 2002
a
UJ
SUBJECT: Centerpoint Plaza Transportation Impact Study - Building
J
B Adequate Public Facilities Analysis
(File: 0153ME07)
•
w
>
C)
CV
cc Q
(D
This memorandum addresses the adequate public facilities (APF)
z
T
issues at the Prospect/Timberline intersection for Building B within
aCenterpoint
Plaza. The transportation impact study guidelines
=
rn
indicate that significant impact is defined in Section 4.5.2.A.2 in
iii
the "Larimer County Urban Area Street Standards," as follows: "When
w
C7
o
the background traffic conditions (without project traffic) causes
N
an intersection to fail the minimum acceptable level of service
rl-
standards; and when the project traffic causes more than a 2 percent
N
increase in the intersection delay."
The "Centerpoint Plaza Transportation Impact Study," August
2001 demonstrated that all of the key intersections would operate
acceptably with full development of Centerpoint ,Plaza in the short
range (2006) future. Given this analysis timeframe, it was assumed
that the Prospect/Timberline intersection would be improved beyond
that which exists today. This analysis included a number of
developments which have approved overall development plans, but no
approved preliminary development plans or final development plans.
The assumed improvements at the Prospect/Timberline intersection were
reasonable for this analysis.
W
The original cited TIS used base (existing) traffic conditions
n.
z
at the Prospect/Timberline intersection that were dated October 2000.
The analyses contained in this memorandum use more recent traffic
`¢
counts (supplied by the City) dated November 2001. These traffic
Z
counts are shown in Figure 1. These counts indicate that the
U
ZProspect/Timberline
intersection is operating at level of service F
J
Z
during both peak hours with the existing geometry.
W
o
0
a
Since improvements to this intersection are not on a capital
¢
improvement program, City staff requested an APF analysis that
•
0
CL
included existing traffic factored to the year 2006 at 1.5 percent
U)
per year, plus known/approved projects that impact the subject
a
intersection. These projects are: Rigden Farm 6t" Filing, Spring
F
Creek Center, and Midpoint Self Storage. The base (2006) peak hour
W
06
traffic at the Prospect/Timberline intersection is shown in Figure
0
2. The APF analysis must use the existing geometry at the subject
F.
a
intersection. Table 1 shows the intersection level of service and
cc
delay using the volumes shown in Figure 2. Calculation forms are
QH
provided in Appendix A. Clearly, this intersection will operate
C
unacceptably with the existing geometry. In order to meet the APF