Loading...
HomeMy WebLinkAboutCENTERPOINT PLAZA - PDP - 35-01 - SUBMITTAL DOCUMENTS - ROUND 4 - TRAFFIC STUDY (3)nczizuuu: signalizea intersections Release 4.1b Analyst: Michael Inter.: Timberline/Prospect Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 11/17/01 Jurisd: Fort Coll' s Period: am pm Year recent or bkgr total v Project 0153 apf E/W St: Prospect N/S St: Timberline SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound 1 I L T R I I L T R I I L T R I I L T I R 1 I No. Lanes 1 1 2 0 I 1 2 0 I 1 1 0 1 1 1 1 I LGConfig I L TR I L TR I L TR I L T R I Volume 1104 933 310 1412 872 35 1448 391 242 1110 368 141 1 Lane Width 112.0 12.0 112.0 12.0 112.0 12.0 112.0 12.0 12.0 1 RTOR Vol 1 0 1 0 1 0 1 0 1 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A P I NB Left A A A Thru P I Thru A A Right P I Right A A Peds X I Peds X WB Left A P I SB Left A A Thru P ( Thru A Right P 1 Right A Peds X I Peds X NB Right I EB Right SB Right A I WB Right Green 14.0 51.0 4.0 21.0 30.0 Yellow 0.0 3.0 0.0 0.0 3.0 All Red 0.0 2.0 0.0 0.0 2.0 Cycle Length: 130.0 Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound L 288 1770 0.42 0.51 24.1 C TR 1337 3407 1.09 0.39 94.1 F 88.7 F Westbound L 288 1770 1.66 0.51 355.0 F TR 1381 3519 0.76 0.39 38.3 D 137.2 F Northbound L 438 1770 1.20 0.43 150.6 F TR 689 1756 1.08 0.39 97.9 F 119.7 F Southbound L 193 1770 0.67 0.28 47.2 D T 430 1863 1.01 0.23 95.2 F 71.5 E R 597 1583 0.28 0.38 28.4 C Intersection Delay = 108.5 (sec/veh) Intersection LOS = F HCS2000: Signalized Intersections Release 4.1b Matthew J. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: (970) 669-2061 Fax: (970) 669-5034 E-Mail: mdelich@frii.com OPERATIONAL ANALYSIS secs TABLE 1 Short Range (2006) Base Condition Peak Hour LOS Delay Morning F 107.6 secs. Afternoon F 108.8 secs. TABLE rip Generation Building B (27,306 S.F.) 710 General Office . 5.0 KSF 11.01 55 1.37 7 0.19 1 0.25 1 1.241 6 150 Warehouse 20.306 KSF 4.96 104 0.37 8 0.08 2 0.12 2 0.39 8 495 Recrealion 2.0 KSF 22.88 46 0.87 2 0.45 1 0.60 1 1.16 2 Total 202 17 4 4 16 TABLE Short Range (2006) Base Condition Plus Building B Peak Hour LOS Delay Increase in Delay Morning F 108.5 secs. 0.8% Afternoon F 110.8 secs. 1.8% APPENDIX B nwzvvv: 5ignaiizea intersections Release 4.1b A>7alyst: Michael Inter.: Timberline/Prospect Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 11/17/01 Jurisd: Fort Col �-B's !2 �/ Period: am pm Year recent short bkgr total B L Project ID 53 apf E/W St: Prospect N/S St: Timberline SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound 1 I L T R I I L T R I I L T R I I L T I R I I No. Lanes 1 1 2 0 1 1 2 0 1 1 1 0 1 1 1 1 I LGConfig I L TR I L TR I L TR I L T R I Volume 1121 925 420 1441 997 78 1407 545 176 165 526 140 I Lane Width 112.0 12.0 112.0 12.0 112.0 12.0 112.0 12.0 12.0 1 RTOR Vol 1 0 1 0 1 0 1 0 I Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 EB Left A P 1 NB Left A A A Thru P 1 Thru A A Right P I Right A A Peds X I Peds X WB Left A A P 1 SB Left A A Thru A P I Thru A Right A P 1 Right A Peds X I Peds X NB Right 1 EB Right SB Right A 1 WB Right Green 4.0 14.0 48.0 4.0 15.0 35.0 Yellow 0.0 0.0 3.0 0.0 0.0 3.0 All Red 0.0 0.0 2.0 0.0 0.0 2.0 Cycle Length: 130.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) V/c g/C Delay LOS Delay LOS Eastbound L 228 1770 0.58 0.42 29.5 C TR 1245 3373 1.19 0.37 133.6 F 125.0 F Westbound L 343 1770 1.38 0.52 231.0 F TR 1670 3501 0.69 0.48 27.8 C 86.9 F Northbound L 357 1770 1.16 0.42 139.5 F TR 690 1794 1.07 0.38 93.4 F 110.0 F Southbound L 193 1770 0.39 0.32 36.1 D T 502 1863 1.23 0.27 168.8 F 130.8 F R 536 1583 0.31 0.34 32.1 C Intersection Delay = 110.8 (sec/veh) Intersection LOS = F HCS2000: Signalized Intersections Release 4.1b Matthew J. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: (970) 669-2061 Fax: (970) 669-5034 E-Mail: mdelich@frii.com OPERATIONAL ANALYSIS nwzvuu: signaiizea tntersectrons Kelease 4.1b Jknalyst: Michael Inter.: Timberline/Prospect Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 11/17/01 Jurisd: Fort Col Period: am Year recent shor bkgr total Project ID: 0153 apf E/W St: Prospect N/S St: Timberline No. Lanes LGConfig Volume Lane Width RTOR Vol /AS G� (�oN c>(-rw) SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound 1 I L T R I L T R I L T R I L T R I I I 1 2 0 I 1 1 2 0 I I 1 1 0 I I 1 1 I 1 I I L TR I L TR I L TR I L T R I 1121 924 420 1431 997 78 1402 544 176 165 526 140 1 112.0 12.0 112.0 12.0 112.0 12.0 112.0 12.0 12.0 1 1 0 1 0 1 0 1 0 1 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A P I NB Left A A A Thru P I Thru A A Right P I Right A A Peds X I Peds X WB Left A A P I SB Left A A Thru A P I Thru A Right A P I Right A Peds X I Peds X NB Right I EB Right SB Right A I WB Right Green 4.0 14.0 48.0 4.0 Yellow 0.0 0.0 3.0 0.0 All Red 0.0 0.0 2.0 0.0 Cycle Intersection Performance Summary_ Appr/ Lane Adj Sat Ratios Lane Group Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Eastbound L 228 1770 0.58 0.42 29.5 C TR 1245 3373 1.19 0.37 133.2 F Westbound L 343 TR 1670 Northbound L 357 TR 690 15.0 35.0 0.0 3.0 0.0 2.0 Length: 130.0 secs Approach Delay LOS 124.7 F 1770 1.35 0.52 217.5 F 3501 0.69 0.48 27.8 C 82.0 F 1770 1.15 0.42 134.3 F 1794 1.07 0.38 93.0 F 107.8 F Southbound L 193 1770 0.39 0.32 36.1 D T 502 1863 1.23 0.27 168.8 F 130.8 R 536 1583 0.31 0.34 32.1 C Intersection Delay = 108.8 (sec/veh) Intersection HCS2000: Signalized Intersections Release 4.1b Matthew J. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 F LOS = F Phone: (970) 669-2061 Fax: (9.10) 669-5034 E-Mail: mdelich@frii.com OPERATIONAL ANALYSIS HCSGuuu: Signalized intersections Release 4.1b Analyst: Michael Inter.: Timberline/Prospect Agency: Matthew J. Delich, P.E_ Area Type: All other areas ?A E Date: 11/17/01 Jurisd: Fort Col s ✓✓✓ Period: am pm Year recent(Ehor •bkgrd total C Project : 0153 apf oA%rj1Y,01j E/W St: Prospect N/S St: Timberline SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound I I L T R I L T R I L T R I L T R 1 No. Lanes I I 1 2 0 I I 1 2 0 I I 1 1 0 I I 1 1 I 1 I LGConfig I L TR I L TR I L TR I L T R I Volume 1104 928 310 1410 872 35 1447 391 242 1109 368 141 1 Lane Width 112.0 12.0 112.0 12.0 112.0 12.0 112.0 12.0 12.0 1 RTOR Vol 1 0 1 0 1 0 1 0 1 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A P I NB Left A A A Thru P i Thru A A Right P I Right A A Peds X I Peds X WB Left A P I SB Left A A Thru P I Thru A Right P I Right A Peds X I Peds X NB Right I EB Right SB Right A i WB Right Green 14.0 51.0 4.0 .21.0 30.0. Yellow 0.0 3.0 0.0 0.0 3.0 All Red 0.0 2.0 0.0 0.0 2.0 Cycle Length: 130.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound L 288 1770 0.42 0.51 24.1 C TR 1336 3406 1.09 0.39 92.7 F 87.4 F Westbound L 288 1770 1.66 0.51 352.0 F TR 1381 3519 0.76 0.39 38.3 D 136.0 F Northbound L 438 1770 1.20 0.43 149.7 F TR 689 1756 1.08 0.39 97.9 F 119.3 F Southbound L 193 1770 0.66 0.28 46.9 D T 430 1863 1.01 0.23 95.2 F 71.4 E R 597 1583 0.28 0.38 28.4 C Intersection Delay = 107.6 (sec/veh) Intersection LOS = F IICS2000: Signalized Intersections Release 4.1b Matthew J. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: (970) 669-2061 Fax: (9.10) 669-5034 E-Mail: mdelich@frii.com OPERATIONAL ANALYSIS APPENDIX A O (O lqt N (O 00 rn qq- m O (h 104/121 928/924 —�- 310/420 m E 35/78 872/997 410/431 '**, f r N It (O O � � � rn v It C7 N Prospect AM/PM N SHORT RANGE (2006) BASE PEAK HOUR TRAFFIC Figure 2 c N E 35/78 872/997 412/441 Prospect 104/121 '**] f r 933/925 r• LO c0 310/420 CO rn v v th N - AM/PM SHORT RANGE (2006) BASE PLUS Figure 3 BUILDING B PEAK HOUR TRAFFIC 0 ITco(O v U') �- N CO M s- � M W J1� 97/112 786/820 - — 283/368 U- 27/61 + 801 /910 327/327 ti f P- Lngt rn rn co ao M CO � AM/PM Prospect A& N RECENT (11/01) PEAK HOUR TRAFFIC Figure 1 criteria, the delay at the Prospect/Timberline intersection could not exceed 109.8 seconds and 111.0 seconds in the respective peak hours. These values reflect a 2 percent increase in delay at this intersection with the current geometry. In the course of conducting these evaluations, it was determined that full development of Centerpoint Plaza (Buildings A, B, and C) would not meet the APF criteria. In fact, development of Buildings A and B would meet the APF criteria in the morning peak hour, but would not meet the APF criteria in the afternoon peak hour. In light of this, an assignment was conducted using just Building B. The trip generation for Building B is provided in Table 2. The total floor area in Building B is 27,306 square feet. As analyzed in this memorandum, the uses within Building B were 5000 square feet of general office, 20,306 square feet of warehouse, and 2000 square feet of indoor recreation. This trip generation was assigned to the Prospect/Timberline intersection using the accepted trip distribution shown in the cited TIS. The forecasted (2006) peak hour volumes are shown in Figure 3. Table 3 shows the intersection level of service and delay using the volumes shown in Figure 3. Calculation forms are provided in Appendix B. The increase in delay is 0.8 percent and 1.8 percent in the respective peak hours'. Based upon this analysis, it is concluded that Centerpoint Plaza, Building B will meet the APF criteria at the Prospect/Timberline intersection. If, after Building B was approved for development by the City of Fort Collins, Building A was proposed as a PDP or FDP to the City, an APF analysis would be required. That analysis, like the Building B analysis, would need to include the current traffic factored to reflect the analysis year plus all approved developments which are not built at the time of the Building A proposal. This would include Building B. From the foregoing analyses reflected in this memorandum, it is likely that Building A would meet the APF criteria. MEMORANDUM 0 c� 0 CC) cc TO: Kevin Frazier ' oo Dick Fisher, Cobalt Design -Build o 6 Louise Herbert, VF Ripley Q ED City of Fort Collins O p O U rn FROM: Matt Delich may% • o X < LL DATE: August 26, 2002 a UJ SUBJECT: Centerpoint Plaza Transportation Impact Study - Building J B Adequate Public Facilities Analysis (File: 0153ME07) • w > C) CV cc Q (D This memorandum addresses the adequate public facilities (APF) z T issues at the Prospect/Timberline intersection for Building B within aCenterpoint Plaza. The transportation impact study guidelines = rn indicate that significant impact is defined in Section 4.5.2.A.2 in iii the "Larimer County Urban Area Street Standards," as follows: "When w C7 o the background traffic conditions (without project traffic) causes N an intersection to fail the minimum acceptable level of service rl- standards; and when the project traffic causes more than a 2 percent N increase in the intersection delay." The "Centerpoint Plaza Transportation Impact Study," August 2001 demonstrated that all of the key intersections would operate acceptably with full development of Centerpoint ,Plaza in the short range (2006) future. Given this analysis timeframe, it was assumed that the Prospect/Timberline intersection would be improved beyond that which exists today. This analysis included a number of developments which have approved overall development plans, but no approved preliminary development plans or final development plans. The assumed improvements at the Prospect/Timberline intersection were reasonable for this analysis. W The original cited TIS used base (existing) traffic conditions n. z at the Prospect/Timberline intersection that were dated October 2000. The analyses contained in this memorandum use more recent traffic `¢ counts (supplied by the City) dated November 2001. These traffic Z counts are shown in Figure 1. These counts indicate that the U ZProspect/Timberline intersection is operating at level of service F J Z during both peak hours with the existing geometry. W o 0 a Since improvements to this intersection are not on a capital ¢ improvement program, City staff requested an APF analysis that • 0 CL included existing traffic factored to the year 2006 at 1.5 percent U) per year, plus known/approved projects that impact the subject a intersection. These projects are: Rigden Farm 6t" Filing, Spring F Creek Center, and Midpoint Self Storage. The base (2006) peak hour W 06 traffic at the Prospect/Timberline intersection is shown in Figure 0 2. The APF analysis must use the existing geometry at the subject F. a intersection. Table 1 shows the intersection level of service and cc delay using the volumes shown in Figure 2. Calculation forms are QH provided in Appendix A. Clearly, this intersection will operate C unacceptably with the existing geometry. In order to meet the APF