HomeMy WebLinkAboutCENTERPOINT PLAZA - PDP - 35-01 - CORRESPONDENCE - (10)TOPIC: Utility plans
67
See plans for additional comments.
102
All work within the Platte River Power Authority non -buildable easement needs to be
approved by Platte River power Authority. They will need to sign the plans showing
they approve of the work and improvements shown within their easement.
120
Add indemnification statement back onto the cover sheet
Department: Light & Power
1
Issue Contact: Bruce Vogel
WILL NEED TO COORDINATE TRANSFORMER LOCATIONS. ANY
MODIFICATIONS TO THE ELECTRIC SYSTEM WILL BE AT THE EXPENSE OF THE
DEVELOPER.
78
Refer to comments of 9-10-2001
Department: Natural Resources
Issue Contact: Doug Moore
71
Existing Tree Schedule information is not clear -
An additional column should be added to explain which trees are being retained,
relocated, replaced, or REMOVED & MITIGATED/ OR NOT MITIGATED.
Example: #19 Cottonwood Stand is being lost due to the construction of the drive isle.
#19 needs to be labeled removed and mitigated to clearly show what is going on and
clearly define what mitigation must be done.
Talked to Louise about this issue on 5/23/02:
Louise will contact Tim Buchanan, the City Forester, to see if the trees that are
proposed for removal need to be mitigated and if so she will clearly show the mitigation
on the plans.
131
Natural Resources has no other issues at this time.
Department: PFA Issue Contact: Michael Chavez
6
Required Access: A fire lane is required. The fire lane shall be visible by painting and
signage, and maintained unobstructed. Minimum turning radius of access roadways must
Page 4
Project: '� aAvr p,,, � PICA r,-),,)i� Date: �610.2
U
Planner: j!40 oP N f Tralic Operations: 6�
Engineer: (�v)ho�
Items Requested
Site land Plat Utili Drainage Rpt Other Items Required
Engineering
Redlined Items Being Returned
Site land Plat UtilityDrainage R t Other Items Being Returned
x
Stormwater
x
x
x
k
Water/Wastewate
x
x
x
-
X
TO( Operations
Trans. Planning
Tran*rt
Natural Resources
Park Planning
Other:
Note: All redlined items should be returned with the resubmitul/ revisions.
-i
Revisions Routing Sheet rim
Off
•
FILE: PROJECT PLANNER
ENGIINEERING: PAVEMENT
BUILDING INSPECTION
ADVANCE PI-4-NNING
WATER CONSERVATION
m
mm
-------_
PUBLIC SERVICE
----
SCHOOLS: • • / •F- / THOMPSON-------------
STATE HIGHWAY DEPARTMENT
m
m
•
-.----.-----RAILROAD:
-
UP or BN/cs
mmmm
1 4M Is l
-----.--
m�s�������
�m
momMmmmmmm
���
lj� 0CZA -�D o u1�i�A:
Planning
1. Due to outstanding issues regarding off -site drainage impacts, Adequate Public
Facilities, permitted land uses, permitted parking numbers, and the possible
need for a revised Transportation Impact Study another round of development
review is needed.
*****************************************************************************
This completes staff comments at this time. Additional comments may be forthcoming.
This development request is subject to the 90-day revision re -submittal (from the
date of this comment letter) as set forth in Section 2.2.11(A) of the Land Use
Code. Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970) 221-6341.
Yours Truly,
*� a —
Steve Olt,
City Planner
Page 9
2. This development is responsible for the design and construction of
improvements to the intersection of Midpoint Drive and Timberline Road to
enable truck movement without driving over curbs.
3. Platte River Power Authority should sign the plans; or, they should at least
provide a letter to the City that clearly states their understanding of the issues
regarding impacts to their�easement. The letter should also address whether or
not they object to the development plans as submitted.
Stormwater
They previously made comments about the off -site flows as they pass through
this site.
2. They cannot make the situation any worse than they already are on adjacent
properties.
3. They cannot add water depth in Timberline Road.
4. They cannot do what they are proposing in the drainage report.
5. Maybe a swale along Timberline Road to Spring Creek is appropriate.
6. This development will have to work with the property owner to the north.
Traffic Operations
The developers can do final compliance for only one building initially, being
Building A or B, and they must build and occupy the first building before a final
plan for a second building can be submitted and evaluated against the Adequate
Public Facilities criteria.
Transportation Planning
1. Bicycle lanes should be striped on Midpoint Drive, if possible. This may require
taking parking off of that street.
Water/Wastewater
1. The sanitary sewer profile is missing. There is information on that sheet but
there is no "picture".
Page 8
Topic: General
123
Please reflect bike lanes as part of Midpoint Drive improvements (8') Repeat comment.
Midpoint Drive is a Collector roadway.
Department: Water Wastewater. Issue Contact: Jeff Hill
15
Show and label locations of proposed and existing gas/electric mains.
125
Provide a profile of the sanitary sewer main on the profile sheet.
126
Will an irrigation tap be needed for this development?
132
Coordinate Site, Landscape, and Civil plans to reflect the same information. See red -
lined Site, Landscape, and utility plans for other comments.
Topic: Utility plans
89
Label all fitting, valves and lengths of pipe between fitting.
Department: Zoning
Issue Contact: Peter Barnes
Topic: zoning
119
"General retail" is not a permitted use in the E District. They'll need to rephrase this
to "incidental or accessory retail". Separate retail stores are not permitted. Any
retail must be accessory to the office or warehouse uses, e.g. Hawthorne Supply (in
the Collindale Business Park) as an example.
The following concerns and comments were expressed at staff review on July 31, 2002:
Engineering
1. A letter of intent from the property owner to the east is needed for an
easement for the small piece of driveway into Lot 2 of this development.
Page 7
Department: Stormwater Utility
Topic: Erosion and Sediment Control
121
Third Review
July 30, 2002
Issue Contact: Basil Hamdan
There must be a note on the plan indicating clearly what is to be done with reseeding
and mulching. Your note explains what the calculations in the report are for. It should
say something to the effect that all disturbed areas not immediately landscaped must
be reseeded and mulched.
Please indicate that the detention area is to be utilized as a sediment trap (gravel
filter, overexcavation, whatever) during construction.
Topic: Offsite Flows
122
The report states that the low point in the railroad is 100 feet west of Timberline,
that is correct however the Spring Creek Master Plan model shows that the 417 cfs
flows from the low area on the west side of Timberline eventually makes it across
Timberline. If the proposal is to channel the 417 cfs north along Timberline, the
applicant needs to analyze how these flows will make it into the Spring Creek channel
without raising the ponding elevation in Timberline, or increasing the flooding potential
on the adjacent property to the north. Another option is to analyze exactly what
portion of the 417 cfs flows currently make it onto your site and show how you can get
it through your site without negatively impacting neighboring properties. A detailed
hydraulic analysis of the spill across Timberline was done by Northern Engineering
during the analysis of the site to the north. However a spill of 75 cfs was modeled, per
the old rainfall flows. Much of the basic survey information can be used to analyze the
spill with the new 417 cfs flow numbers.
Department: Transportation Planning Issue Contact: Mark Jackson
27
APF Concerns
I have serious concerns regarding this project's anticipated impacts to the
Timberline/Prospect area as they relate to the City's APF ordinance. I would like to
have the applicant meet with Eric Bracke and possible other APF
37
Please reflect bike lanes as part of Midpoint Drive improvements (8')
Page 6
be 20 feet inside and 40 feet outside. All access roadways must bean all weather
driving surface capable of supporting fire apparatus. The surface shall be asphalt,
concrete, or compact road base. Additional surface criteria may be obtained from the
City or County engineering departments. 97 UFC 901.3; 901.4.2; 902.2.1; PFA
Administrative Policy 85-5
NOTE: A fire lane shall be required from the main entrance off Midpoint Drive and
continue through the parking lots of Lot's 1 & 2.
7
Address Numerals: Address numerals shall be visible from the street fronting the
property, and posted with a minimum 10-inch numerals on a contrasting background. 97
UFC 901.4.4
8
Water Supply: No commercial building can be greater then 300 feet from a fire
hydrant. Fire hydrants are required with a maximum spacing of 600 feet along an
approved roadway. Each hydrant must be capable of delivering 1500 gallons of water
per minute at a residual pressure of 20 psi.
97 UFC 901.2.2.2
9
Building Area: Building A exceeds 5000 square feet and must be fire contained or fire
sprinklered.
97 UBC Table 9B
NOTE: Poudre Fire Authority requires a "Knox Box" to be mounted on the front of
every new building equipped with a required fire sprinkler system or fire alarm system.
97 UFC 902.4; PFA Policy 88-20
10
Sprink►er Requirements: Building B and C shall be fire sprinklered. NOTE: Poudre Fire
Authority requires a "Knox Box" to be mounted on the front of every new building
equipped with a required fire sprinklered system or fire alarm system. 97 UFC 902.4;
PFA Policy 88-20
Page 5
74
As was previously discussed this development can provide the city with a cash escrow
for the design and construction of the local street portion of the improvements to
Timberline Road adjacent to the site in lieu of doing this work at this time.
75
This development needs to work with the developers of Spring Creek Center in
accomplishing the improvements that are needed at the midpoint timberline
intersection to accommodate truck traffic at this intersection. Improvements to this
intersection will be a condition of approval. (per Traffic) Plans for this improvement
will need to be provided and approved prior to final approval of this project if they
have not already been received and approved.
106
Once this project has gone to hearing (assuming one building and only one building can
be built) the Final Plan submittal will need to only show the work and infrastructure for
the one building to be built. All extra stuff and other building sites and services will
need to be taken off of the plans. Can only put in the infrastructure for the one
building.
Because of the APF issues only 1 building can be built - so only 1 building can receive
final approval. Thus only that building that receives final approval and its associated
needs (sidewalk, parking lot services, driveway, etc) can be built. The rest can not be
built or shown on the approved plans. When the other building or buildings can be built
they will need to come in for final approval with their own set or sets of plans for the
improvements needed to serve that building(s).
107
Will need a letter of intent from the adjacent property owner for the off -site
easement prior to being scheduled for a hearing.
128
If any of the proposed uses are changed - the traffic studies will need to be updated.
Topic: Site Plan
35
Show the future 7-foot sidewalk along Timberline Road. It would be best to not have
dual walks along here. Widen out the 5-foot walk on site to meet the 7-foot standard
or build and use the 7-foot walk to meet the connection needs you are showing. 5/7/02
Need to show the sidewalk as being built - it will be needed to connect to building B if
that is the building to be built. Will need a sidewalk connection that does not cross a
drive isle.
Page 3
113
The Traffic Operations Department has evaluated whether either Building A or
Building B can be constructed under the Adequate Public Facilities regulation in the
Land Use Code. They have determined that only one of the two aforementioned
buildings can move forward and submit Final Compliance Plans (Site Plan, Landscape
Plan, Building Elevations, utility plans, etc.) for that portion of the development. The
Final Compliance Plans shall reflect only the building, associated parking, and
improvements for that building requesting final approval.
115
City staff would support the Alternative Compliance Plan for the "Phase 1" parking for
either Building A or Building B. However, the plan as submitted does not clearly
indicate the vehicle use areas (driveways and parking) that would be constructed with
either Building A or Building B. Apparently the plan that was resubmitted has not
changed much from the original plan. Please see Diagrams 1 & 2 that are being
forwarded with this comment letter.
Topic: Landscape Plan
129
A copy of a letter received from Tom McCormick of the Platte River Power Authority
is attached to this comment letter. His letter deals primarily with the type of some of
the plant materials located within their easement and with safety concerns associated
with the location of trash enclosures relative to their easement.
Topic: Site Plan
112
The proposed amount of new parking spaces on Lots 1 & 2 (Buildings A, B, and C) is the
number allowed by the Land Use Code, based on the parking analysis on the plan.
However, depending on what is decided regarding the proposed "General Retail' uses in
each building, the numbers may have to be recalculated based on the ultimate amount
of floor area for each use.
Department: Engineering Issue Contact: Sheri Wamhoff
Topic: General
41
Will need an off -site easement for the driveway construction at the northeast corner
of the site.
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
r�
VF RIPLEY ASSOCIATES Date: 8/6/2002
c/o Louise Herbert
401 West Mountain Avenue, Suitei201
Fort Collins, CO. 80521
Staff has reviewed your submittal for CENTERPOINT PLAZA PDP, TYPE I (LUC),
#35-01, and we offer the following comments:
ISSUES:
Department
Topic: zoning
124
Current Planning
Issue Contact: Steve Olt
The Site Plan indicates, under the BUILDING USE DATA and Parking Analysis, that
there is to be General Retail uses in Buildings A, B, and C. The E - Employment Zoning
District does not permit General Retail unless it is located in a Convenience Shopping
Center. The Centerpoint Plaza development does not meet the definition of, nor will it
function as, a Convenience Shopping Center. The proposed retail uses could be defined
as "accessory uses" to principal (primary) uses if they meet the following definition:
"Accessory use shall mean a use of land or of a building or portion thereof
customarily used with, and clearly incidental and subordinate to, the principal
use of the land or building and ordinarily located on the same lot with such
principal use."
The way the General Retail uses are identified on the Site Plan would indicate that
they are intended to be principal (primary) uses not associated with the office or
industrial uses. Please refer to Peter Barnes comment (#119) in this comment letter.
Topic: Genera/
130
Depending on what outcome is determined regarding the General Retail land use issue,
the Transportation Impact Analysis may have to be modified to reflect traffic impacts
associated with this proposed development and how this affects the Adequate Public
Facilities issue.
Page 1