June 24, 2002
PROJECT / NO: Centerpoint Plaza PDP
FROM: Louise Herbert — VF Ripley Associates
TO: Eric Bracke — Traffic Operations Department
Sheri Wamhoff - Engineering
Cc: Dick Fisher — Cobalt Design
Kevin Fraser — LLC Fraser and Company Ventures
Matt Delich
Marc Jackson — Transportation Planning
Meeting held on 5/28/02 — 9.00 a.m. at Traffic Operations Department
Re: Adequate Public Facilities.
From the meeting the following was determined:
1) Eric confirmed he had received the information on the highway capacity sheets from the
adequate public facilities analysis.
2) Based on the Traffic Study Memoranda dated April 11,02 both buildings A and B individually
meet the adequate public facilities. Initially, only one building, associated parking and
improvements could be submitted for Final Compliance after the Project Development Plan
approval. The second building, associated parking and improvements could also be submitted
for Final Compliance after the first building had been approved and built. In order to determine
if the second building could proceed with Final Compliance review a revised adequate public
facilities study would need to be submitted to determine if the building would meet the
adequate public facilities at that time.
3) Section 2.2.11 (C) and Section 2.2.11(D)(3) of the Land Use Code outline the time frames
after approval of the Project Development Plan and Final Plan approval.
401 West Mountain Avenue, Suite 201, Fort Collins, Colorado 80521 • 970-224-5828
FAX 970-224-1662 9 E-MAIL vfripley@frii.com