Utility Plans:
See Civil Engineer comments and plans.
Comments from Staff Review May 8`h, 2002
Engineering:
1. The Site, Landscape and Utility plans have been coordinated to ensure all plans
are consistent.
2. See comment 44 under Engineering.
3. See comment 113 —Current Planning —General
Stormwater:
See Civil Engineer comments.
Traffic Operations:
1. See comment 113 —Current Planning —General
2. Traffic Operations were sent the "highway capacity sheets" on 4/11/02.
3. Engineering to determine.
4. Acknowledged.
Transportation Planning:
Items 1 to 3. Engineering to determine.
Current Planning:
1. Lighting Plan. A revised Lighting Plan was submitted with the last submittal
dated 4/12/02. The Lighting Plan has been revised with the comments from the
Police Department and copies resubmitted.
Department: Water Wastewater
Please see Civil Engineer comments.
Other comments on from the red -lined Site, Landscape, Utility Plans and Building
Elevations:
Landscape Plan:
1. Lot Two: Shrubs have been added to the planting beds on the west side
of the parking lot.
2. Lot One — Trash enclosure east of Building A in parking island.
In the last comments / red lines dated 10/12/01 a trash enclosure was requested
to be closer to Building A. The trash enclosure had to be located so that it would
be accessible and also comply with Section 3.5.1(1) (1).
3. Lot One — Planting bed to south west corner of parking lot (see attached
8'/x x 11) No planting can occur in the upper part of the bed as this will be the
location of a future transformer.
4. Lot Two: Planting north of Building C. Additional planting has been added
around the proposed patio.
5. plant List. Plant species — Buddleia davidii `Argentea' is a plant selected from
the Fort Collins Nursery catalog. Please see attached description.
6. plant symbols have been corrected.
Site Plan.
1. Future sidewalk from south line of Lot One across the Great Western Railroad.
Comment acknowledged.
Building Elevations:
1. Building A. South elevation. No door is at this location. The sidewalk has been
adjusted on the Site Plan.
2. Building C. South elevation. The landscape and planting bed has been
adjusted on the Landscape Plan.
Item 2) Trash area at SW corner to rear of Building B. The light levels have been
increased to the north side of the trash enclosure to ensure adequate light
levels
Item 3) Building A north elevation. All light levels and landscape are acceptable.
The above was discussed and coordinated with Joseph Gerdom on 5/28/02
Topic: Site Plan
100
Lighting see 5- Lighting above.
VF Ripley discussed the landscape materials and the patio layout with Joseph Gerdom
on 5/28/02. The Site Plan shows a low seat wall approximately 16" high on the north
and east sides of the patio. Plant material shown is Hughes Juniper, which at maturity
will be approximately 24" high .Joseph Gerdom agreed that the this should not create a
security problem.
Department: Stormwater Utlity
68
See Civil Engineer comments
69 — Landscape Plan
Glen Stewer from Stormwater Utility confirmed on 5/28/02 that the landscape for the
pond area can be a native dryland seed. No additional landscape will be required.
70
Acknowledged. See Civil Engineers comments.
For all other topics please see civil engineer response.
Department; Transportation Planning
27 — Adequate Public Facilities
See comments under Item 113 - Current Planning. A copy of the meeting memorandum
was sent to Traffic Operations, Engineering, Transportation and Planning summarizing
the meeting and items discussed on 6/5/02.
37 — Bike Lanes
The project does not include Midpoint Drive improvements.
80
This has been corrected on the Utility Plans.
105
A note has been added on the Site Plan concerning the future shared access to the
property to the east.
Topic: Utility Plans
See Civil Engineers response.
Department: Light and Power
Comment 9/10/2001
" Will need to coordinate transformer locations. Any modifications to the electric system
will be at the expense of the developer"
Comment acknowledged.
Department: Natural Resources
71 Existing tree schedule.
VF Ripley met with the City Forester on 5/29/02 to review all the existing trees on the
site and identified on the Landscape Plan. Trees to be retained, replaced, or removed and
mitigated or not mitigated are described in an additional column on the existing trees
schedule. Proposed trees to mitigate those removed are also identified on the proposed
plant list. The format for this was confirmed verbally with Doug Moore on 5/23/02.
72 Prairie Dogs - Acknowledged.
Department: PFA
6
The access roadway radii have been changed to 20 feet.
7 to 10. All items acknowledged.
Department: Police
5 - Lighting
Item 1) Area between Building A and B (west) end. Two additional lights have been
added to the south end of Building A which increases the light levels between the
buildings.
Department: Engineering
32 — Adequate Public Facilities
Please see item 113 — Current Planning General.
74
Acknowledged.
75
Acknowledged.
Topic: General
106
Acknowledged.
107
Acknowledged.
Topic: Landscape Plan
44
All Summit Ash street trees have been moved east and are 5' from the back of the
proposed 7' sidewalk. Sheri Wamhoff, confirmed the 5' from back of curb verbally
on 5/22/02.
81
Phasing is shown on the Landscape Plan.
Topic: Plat
See Civil Engineers response.
Topic: Site Plan
35
A 7- foot wide sidewalk is shown along Timberline. A note has been added to the Site
Plan stating that the existing 5-foot existing asphalt walk is to be removed at a future
date.
41
Acknowledged.
79
This has been corrected on the Utility Plans.
from screening under Section 3.2.1 (E) (4) and (6). Planting has been adjusted to the
parking islands as the layout of these has changed.
109
Landscape screening to the loading / service area south of Building B. Planting has been
added to this area per Section 3.2.1 (E) (6).
110
Landscape screening to the 2 trash enclosures south of Building B. Additional planting
has been added.
111
Note #13 on the Landscape Plan general notes. This note has been revised in accordance
with the red -lined comments on the Landscape Plan.
116
All Summit Ash street trees have been moved east and are 5' from the back of the
proposed 7' wide sidewalk. Sheri Wamhoff, from Engineering confirmed the 5' from
back of curb verbally on 5/22/02.
117
The westernmost Marshall's Ash street tree has been removed / eliminated due to the
possibility that the turning radius from Timberline Road into Midpoint Drive may have to
be increased, potentially impacting that tree. Sheri Wamhoff from Engineering confirmed
verbally on 5/22/02 that this tree should be removed from the Landscape Plan for the
above reason.
Topic: Site Plan
101
The Burlington Northern Railroad, along the southwest side of the site has been changed
to the Great Western Railroad.
112
The building use data breakdown as shown on the Site Plan had incorrect information for
Buildings B and C for the estimated employees. This is now correctly shown on the land
use statistics.
114
Based on the information provided by the client on the potential building occupancy
two trash enclosures have been identified as being required for Building B.
I
July 10, 2002
Steve Olt
Fort Collins Planning Department
281 North College Avenue
Fort Collins, CO 80524
Centerpoint Plaza PDP, Type 1 (LUC), #35-01
Response to staff Project Review comments
Dear Steve,
VF RIPLEY
ASSOCIATES INC.
Landscape Architecture
Urban Design
Planning
401 West Mountain Avenue
Suite 201
Fort Collins, CO 80.521-2604
PHONE (970) 224-5828
FAX (970) 224-1662
We have reviewed the staff letter dated May 151h, 02 and have the following comments:
Department: Current Planning:
Topic: General
113 — Adequate Public Facilities.
The applicant met with Traffic Operations Department and Engineering on 5/28/02 to
discuss and determine the status of the adequate public facilities.
Please see attached memorandum. A copy of the memorandum was sent to
Traffic Operations, Engineering, Transportation Planning and Planning on 6/5/02.
115
The emergency and service / delivery access and parking can be constructed for
either Building A or B. The final parking spaces allowed shall be addressed at
Final Compliance for the one building that is allowed to proceed at that time.
Copies of the Alternative Compliance Plan have been resubmitted in accordance
with the routing sheet although this is plan is now not required. Access and parking
will be addressed for the relevant building as mentioned above at Final Compliance.
Topic: Landscape Plan
108
The landscape was reduced so as to meet the landscape budget requirements of the
project. The planting beds against Buildings A and B and a planting bed between the
two crosswalks north of the existing warehouse were the areas where it was identified,
where this could be achieved without impacting the overall planting design or remove