HomeMy WebLinkAboutCENTERPOINT PLAZA - PDP - 35-01 - CORRESPONDENCE - REVISIONSTransportation Planning: Item 27) APF. See comments above. Item 28) Acknowledged. Item 30) These improvements are not to be addressed at this time. Item 31) A 6 foot wide pedestrian sidewalk has been added south of building B across the landscape island. Item 33) The bike parking has been added to building B. Item 34) See civil engineers comments and drawings. Water Wastewater: Item 11) to 19) See civil engineer comments and drawings. Zoning: Item 2) The office, retail and warehouse square footage and parking is shown on the Site Plan. An Alternative Compliance request is attached for the parking lot north and east of buildings A and B. Item 3) An additional HC vehicle space has been added. Item 4) A landscape assurance note has been added to the notes on the landscape plan. Please call if you have any questions regarding the above. Thank you for your consideration and we look forward to working with further you during the development review process. Sincerely VF Ripley Associates Louise Herbert Item 40) The trash enclosure has been relocated so it is outside of the utility easement. Item 41) See civil engineers comments. Item 42) The sidewalk has been relocated. Item 43) The rail spur is existing. Item 44) The landscape has been readjusted. Item 45) Acknowledged. Item 46) to 76) See civil engineers comments and drawings. Light and Power: Item 1) Acknowledged. Natural Resources: Item 71) Additional information has been added to the tree schedule. A total 12 existing trees will be removed. 44 trees will be planted to mitigate the loss of the existing trees. Item 72) Prairie Dogs. No prairie dogs appear to be on the site. Poudre Fire Authority Items 6) to 10) Acknowledged. Police Item 5) Acknowledged. Stormwater Utility Items 20) to 68) See civil engineer comments and drawings. Item 69) The proposed pond will be seeded with an appropriate•dryland native seed. Landscape Plan: a) Shrubs on the north side of the parking lot to buildings A and B are Alpine Current and should provide good winter screening. b) rubs east side of parking lot to building B have been changed to provide -! 1 . 30 ft 'gh screening. w�j�e� e� .��k A6 �/ , 6� c� c) Street trees have been added along Timberline Road. d) Parking lot screening has been added to screen the parking on the south property line adjacent to the Burlington Rail Road. e) The interior parking lot landscape has been checked and meets the 6% per Section 3.2.1 (E) (5) of the Land Use Code. Building elevations and lighting plan: All items have been addressed. Engineering: Item 32) Adequate public facilities. From a meeting held with Current Planning on 11/5/02 it was determined that the project will be able to proceed under the current PDP process with phasing for the three proposed buildings as shown on the Site Plan. Reference to the Land Use Code Section 3.7.3 Adequate Public Facilities Section 3.7.3.Item (C), b) and Article 5 ( page 37). Further traffic impact analysis for buildings A and B have been carried out addressing the adequate public facilities and for each building. Please see attached transportation impact study memorandums. A traffic impact study will be carried out for building C as necessary. Item 34) The I.D. sign has been moved so it is outside of the right of way. Item 35) A single 7-foot wide sidewalk shown. Item 36) The building envelopes have been corrected so they do not overlap into The easement. Item 38) Sidewalks have been adjusted so that all sidewalks are 6 feet in width. Item 39) The drive isle width has been corrected. April 12, 2002 Steve Olt Fort Collins Planning Department 281 North College Avenue Fort Collins, CO 80524 Centerpoint Plaza PDP, Type 1 (LUC), #35-01 Response to staff Project Review comments Dear Steve: We have reviewed the staff letter dated October 12, 2001 and have the following comments: Current Planning: Item 77). Red -lined comments. Site Plan: t�. VF RIPLEY ASSOCIATES INC. Landscape Architecture Urban Design Planning 401 West Mountain Avenue Suite 201 Fort Collins, CO 80521-2604 PHONE (970) 224-5828 FAX (970) 224-1662 a) Building C- north side. A patio has been added which complies with Section 3.5.3 B) 2) d) of the Lands Use Code. b) The relevant sidewalks have been adjusted to be 6 foot wide. c) Bike rack to building B. A bike rack has been added to the northwest corner. d) Lot 3 - existing lot. Peter Barnes in Zoning verbally confirmed on 10/16/01 a Minor Amendment would not be necessary for improvements on lot 3. e) A trash enclosure is shown near to building A.