HomeMy WebLinkAboutCENTERPOINT PLAZA - PDP - 35-01 - CORRESPONDENCE - (3)PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: September 4, 2001
TO: Technical Services
PROJECT: #35-01 Centerpoint Plaza PDP, Type I(LUC)
All comments must be received by Steve Olt in Current Planning no
later than the staff review meeting:
October 3, 2001
�- lamZA, mAP
Note- Please identify your. redlines for future reference
0, tl;�-, 90
''
L N ,.r To C
SEP � 5 ?001
Gt)o c o &5 /-3c5-rrc-w(L 72)
S'`F`T�Co2o�T.� As uNo
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970) 221-6750.
Yours Truly,
/6ef'ow"--
STEVE OLT
City Planner
Page 12
14
Issue Contact: Jeff Hill
Water mains within the City of Fort Collins water service area must be designed and
installed with Ductile Iron Pipe.
15
Issue Contact: Jeff Hill
Show and label locations of proposed and existing gas/electric mains.
16
Issue Contact: Jeff Hill
Will fire lines or irrigation taps be required for this development?
17
Issue Contact: Jeff Hill
Provide the sanitary sewer profile at a common engineering scale. Show and label
existing and proposed ground elevations in the sanitary sewer profile view.
18
Issue Contact: Jeff Hill
Insulation is required over all sanitary sewer lines which have less than 4 feet of
cover. Include a detail for the installation of insulation.
19
Issue Contact: Jeff Hill
Include a note in all appropriate views..to core drill all openings into the existing
sanitary sewer manholes.
Department: Zoning
Issue Contact: Gary Lopez
Without retail/office square footage breakdown in bldg. A parking max. unknown
however it appear there may be 1 - 3 spaces above the max. permitted.
Modification might be required.
3
Issue Contact: Gary Lopez
A minimum of 5 HC vehicle spaces will be required. 4 are shown.
4
Issue Contact: Gary Lopez
Landscape assurances required in notes requiring complete landscape installation
prior to issuance of Certificate of Occupancy or escrow/bond/letter of credit received
for 125% of value remaining of landscaping including labor and materials.
Page 11
I have serious concerns regarding this project's anticipated impacts to the
Timberline/Prospect area as they relate to the City's APF ordinance. I would
like to have the applicant meet with Eric Bracke and possible other APF .
28 Issue Contact: Mark Jackson
Timberline sidewalk needs to be continued southward to southern terminus of site
30
pedestrian crossing of BNSF line
Issue Contact: Mark Jackson
Would like to discuss contribution of funds to provide pedestrian crossing of railroad
line at some point in future
31 Issue Contact: Mark Jackson
Lot.1-,Phase 1 parking area has no pedestrian separation or connectivity. Please
provide
33 Issue Contact: Mark Jackson
Please show bicycle parking for Building B. Locate all bicycle parking near primary
entrances to buildings.
37 Issue Contact: Mark Jackson
Please reflect bike lanes as part of Midpoint Drive improvements (8')
Department: Water Wastewater
11
Issue Contact: Jeff Hill
Provide utility easements for all water/sewer mains, curb stops and fire hydrants.
12 Issue Contact: Jeff Hill
The minimum elevation which is acceptable for the connection of a sewer main to a
sewer trunk is at the 3/4 points of each pipe. A minimum cover of 3 feet is required
to assure a rigid asphalt section and to protect the buried pipe.
13
Issue Contact: Jeff Hill
Place curb stops and meter pits adjacent to water mains.
Page 10
25
Issue Contact: Basil Hamdan
Drainage Calculations:
Please recalculate the time of concentration values used. 500 feet is the maximum
allowable overland flow length. Please explain how was the 560 foot value obtained.
26 Issue Contact: Basil Hamdan
Erosion/Sediment Control Comments
• The plan shows straw bales on concrete pans. This doesn't work, please
correct. .
• The erosion control notes are not the current set.
• Calculations indicate "dryland grass". Where is this on the plan, are areas to be
reseeded/mulched, if so where, when (note on the plan)?
• The escrow calculations exclude ROW areas and future phases, are these not
going to be disturbed with Phase 1? Please justify.
29
Issue Contact: Basil Hamdan
Plat:
Please provide a drainage easement for the proposed detention pond in Lot 3.
.:
Issue Contact: Basil Hamdan
Water Quality Pond:
Please explain why the water quality pond has concrete pans in it. This seems to
defeat the purpose of a Water Quality Pond.
Please provide a water quality outlet structure for the extended detention pond.
None was shown.
Issue Contact: Basil Hamdan
Landscape Plan:
There is no proposed Landscape Plan for the pond area, please provide one.
70
Issue Contact: Basil Hamdan
Please address all the redlines in plan and report, and return all redlines with your
future submittal.
Department: Transportation Planning
27
APF Concerns
Issue Contact: Mark Jackson
Page 9
Department: Stormwater Utility
20
Issue Contact: Basil Hamdan
Drainage Plans:
Please provide a drainage plan with standard City of Fort Collins requirements such
as drainage basin lines, hydrology summary table, pond summary table, etc....
21
Outfall Issues:
Issue Contact: Basil Hamdan
The text states that the outfall from the site will be to the Poudre river through an
existing drainage swale. Please provide documentation as to the existence and
condition of that swale. Please show this outfall ditch on the plans. Is it on railroad
property ? does it go all the way to the Poudre.River ? Is there an existing drainage
easement for that swale ? is it in good physical condition ? all of these issues need
to be explored and clarified in any future submittal.
22
Issue Contact: Basil Hamdan
Phasing Plan:
The report states that Lot 2 will be developed at a later stage, however no interim
plans were provided. Please submit a phasing plan showing what will be built with
Phase 1, and how the undeveloped portion of the site will be graded in the interim
condition.
23
Issue Contact: Basil Hamdan
Variance Request:
The report requests a variance for the one foot of freeboard requirement on the
pond. since this is a new project, and the variance is not justified in the text, it is not
clear why such a request would be granted.
24 Issue Contact: Basil Hamdan
Grading Plans:
Please extend the existing contours grades at least 50 feet beyond the limits of the
property per City requirements.
There seems to be some proposed grading in the railroad ROW, either provide
written documentation from the railroad company approving such grading or pull
grading off railroad property.
The detention pond seems to be partially in a "non -buildable" PRPA easement.
Please provide written documentation from PRPA allowing the proposed grading in
their easement.
Page 8
an all weather driving surface capable of supporting fire apparatus. The surface shall
be asphalt, concrete, or compact road base. Additional surface criteria may be
obtained from the City or County engineering departments. 97 UFC 901.3; 901.4.2;
902.2.1; PFA Administrative Policy 85-5
7
NOTE: A fire lane shall be required from the main entrance off Midpoint Drive
and continue through the parking lots of Lot's 1 & 2.
Issue Contact: Michael Chavez
Address Numerals: Address numerals shall be visible from the street fronting the
property, and posted with a minimum 10-inch numerals on a contrasting
background. 97 UFC 901.4.4
0
Issue Contact: Michael Chavez
Water Supply: No commercial building can be greater then 300 feet from a fire
hydrant. Fire hydrants are required with a maximum spacing of 600 feet along an
approved roadway. Each hydrant must be capable of delivering 1500 gallons of
water per minute at a residual pressure of 20 psi.
9.7 UFC 901.2.2.2
0
Issue Contact: Michael Chavez
Building Area: Building A exceeds 5000 square feet and must be fire contained or
fire sprinklered.
97 UBC Table 9B
10
NOTE: Poudre Fire Authority requires a "Knox Box" to be mounted on the
front of every new building equipped with a required fire sprinkler system or
fire alarm system. 97 UFC 902.4; PFA Policy 88-20
Issue Contact: Michael Chavez
Sprinkler Requirements: Building B and C shall be fire sprinklered. NOTE: Poudre
Fire Authority requires a "Knox Box" to be mounted on the front of everynew
building equipped with a required fire sprinklered system or fire alarm system. 97
UFC 902.4; PFA Policy 88-20
Department: Police
5
Issue Contact: Joseph Gerdom
Lighting: The following areas have need additional lighting to meet minimal security -
1)area between Bldg A and Bldg B (west) end; 2) trash area at SW corner, and;
3)both access points to Bldg A at north end.
Page 7
75
Issue Contact: Sheri Wamhoff
This development needs to work with the developers of Spring Creek Center in
accomplishing the improvements that are needed at the midpoint timberline
intersection to accommodate truck traffic at this intersection.
IDER
Issue Contact: Sheri Wamhoff
Need to show the phasing on the utility plans and need to identify/ show the phase
lines on the site and landscape plans. Need to know what utilities, pavement and
improvements are to be built with each phase if the project is to be phased.
Department: Light & Power
1
Issue Contact: Bruce Vogel
WILL NEED TO COORDINATE TRANSFORMER LOCATIONS. ANY
MODIFICATIONS TO THE -ELECTRIC SYSTEM WILL BE AT THE EXPENSE OF
THE DEVELOPER.
Department: Natural Resources
71
Issue Contact: Doug Moore
Existing Tree Schedule information is not clear -
An additional column should be added to explain which trees are being retained,
relocated, replaced, or REMOVED & MITIGATED/ OR NOT MITIGATED.
Example: #19 Cottonwood Stand is being lost due to the construction of the drive
isle. #19 needs to be labeled removed and mitigated to clearly show what is going
on and clearly define what mitigation must be done.
72
Prairie Dogs -
Issue Contact: Doug Moore
Before the commencement of grading or other construction on the development site,
any prairie dogs inhabiting portions of the site within the Limits of Development
(LOD) shall be relocated or eradicated by the developer using city -approved
methods as set forth in Chapter 4 of the City Code. 3.4.1(N)(5)
Department: PFA
[o
Issue Contact: Michael Chavez
Required Access: A fire lane is required. The fire lane shall be visible by painting
and signage, and maintained unobstructed. Minimum turning radius of access
roadways must be 20 feet inside and 40 feet outside. All access roadways must be
Page 6
62 Issue Contact: Sheri Wamhoff
Utility plans
Provide elevations at the driveways. Drainage can not go across the sidewalk (out
the driveway). Need more information on the plans to verify that this is not
occurring.
63
Utility plans
Make sure details are readable.
64
Issue Contact: Sheri Wamhoff
Issue Contact: Sheri Wamhoff
Utility plans
With the standard driveway detail identify that t = 6 inches min.
65
Utility plans
Use new curb and gutter details.
Issue Contact: Sheri Wamhoff
Issue -Contact: Sheri Wamhoff
Utility plans
Provide details 7-20A (vert. curb), 16-1 (standard sidewalk), 16-2 (sidewalk detail),
16-40 (ped. ramp) and 22-1 (trench detail)
67
Utility plans
See plans for additional comments.
74
Issue Contact: Sheri Wamhoff
Issue Contact: Sheri Wamhoff
As was previously discussed this development can provide the city with a cash
escrow for the design and construction of the local street portion of the
improvements to Timberline Road adjacent to the site in lieu of doing this work at
this time.
Page 5
55 Issue Contact: Sheri Wamhoff
Utility plans
Where is the pavement edge behind the existing warehouse? The pavement line
stops at the end of the parking stalls on the east side of the center drive isle running
south.
We
Issue Contact: Sheri Wamhoff
Utility plans
Identify that the sidewalks in front of the parking stalls are 6-foot min.
57
Issue Contact: Sheri Wamhoff
Utility plans
Need to show the patching in the street that will occur with the installation of the
driveway cuts as well as the utility cuts. Add a note that the street is to be repaired/
replaced in accordance with City standards.
58 Issue Contact: Sheri Wamhoff
Utility plans
Identify the driveway widths and the radii used for the access points. R=15 feet from
table 8-2.
59 Issue Contact: Sheri Wamhoff
Utility plans
The sidewalk on midpoint needs to be placed so that the back of walk abuts the new
row edge.
M
Issue Contact: Sheri Wamhoff
Utility plans
Is there an easement needed or existing for the rail spur?
61
Issue Contact: Sheri Wamhoff
Utility plans
Will need off -site easements for the sewer connection within the railroad property
and for the driveway access point that partially falls outside the property boundary.
Page 4
L1y
Issue Contact: Sheri Wamhoff
Plat
Show the off -site easements that are needed. Indicate that they are to be provided
by separate document.
47
Issue Contact: Sheri Wamhoff
Plat
Need to provide access easements for the drive isles across Lot 2 as it is the only
access for the other two lots.
48
Issue Contact: Sheri Wamhoff
Plat
Is an easement needed for the sewer line that runs into the site?
49 Issue Contact: Sheri Wamhoff
Plat
Modify the certificate of dedication to meet current language.
50 Issue Contact: Sheri Wamhoff
Plat
Delete one word in the maintenance guarantee language as shown.
51 Issue Contact: Sheri Wamhoff
Utility plans
Provide 2 benchmarks and info.
52
Utility plans
Provide Indemnification statement per 3.3.1.F
53
Utility plans
Provide construction Notes as applicable.
54
Issue Contact: Sheri Wamhoff
Issue Contact: Sheri Wamhoff
Issue Contact: Sheri Wamhoff
Utility plans
Show location and label future walk along Timberline Rd.
Page 3
38 Issue Contact: Sheri Wamhoff
Site Plan
All sidewalks running in front of parking stall must be 6 feet in width minimum. (See
figure 5 article 3 p. 39)
39 Issue Contact: Sheri Wamhoff
Site Plan
The drive isle width in the parking lot for double loaded parking spaces is to be a
minimum of 24 feet. Have one labeled as 23.4 feet.
40 Issue Contact: Sheri Wamhoff
Site Plan
The trash enclosure can not be placed over an easement. The enclosure is
considered a structure and structures are not allowed over easements.
41 Issue Contact: Sheri Wamhoff
Site Plan
Will need an off -site easement for the driveway construction at the northeast corner
of the site.
42 Issue Contact: Sheri Wamhoff
Site Plan
The sidewalk along midpoint needs to be placed so that the back of the walk is along
the new row line.
43
Site Plan
Is the rail spur new or existing?
44
Issue Contact: Sheri Wamhoff
Issue Contact: Sheri Wamhoff
Landscape plan
The trees and landscaping along Timberline road need to be planted so that they are
not where the future walk is to be located or beyond where the potential future curb
line will be based on the major arterial design and the row location.
45
Issue Contact: Sheri Wamhoff
Landscape plan
By combining walks you will have more room for the landscape shown.
Page 2
STAFF PROJECT REVIEW
City of Fork Collins
VF RIPLEY ASSOCIATES Date: 10/12/01
C/O LOUISE HERBERT
401 W. MOUNTAIN, SUITE 201
FORT COLLINS, CO 80521
Staff has reviewed your submittal for CENTERPOINT PLAZA PDP, TYPE I (LUC),
#35-01, and we offer the following comments:
ISSUES:
Department: Current Planning
77
Issue Contact: Steve Olt
The Current Planning Department comments are on red -lined Site, Landscape,
Building Elevations, and Lighting Plans that are being forwarded to the applicant.
Department: Engineering
32
Issue Contact: Sheri Wamhoff
An adequate public facilities (APF) analysis needs to be done for this project as was
identified on Attachment 'A' Transportation Impact Study Base Assumptions of the
TIS. It appears that there will be APF issues on this project. This is needed
before the project can consider going forward.
34
Issue Contact: Sheri Wamhoff
Site Plan
The site plan shows the id sign extending into the row. It can not be placed within
the row.
35
Issue Contact: Sheri Wamhoff
Site Plan
Show the future 7-foot sidewalk along Timberline Road. It would be best to not have
dual walks along here. Widen out the 5-foot walk on site to meet the 7-foot standard
or build and use the 7-foot walk to meet the connection needs you are showing.
W
Issue Contact: Sheri Wamhoff
Site Plan
The building envelopes are shown extending/ overlapping into the easements. This
can not occur.
Page 1
tT�