Loading...
HomeMy WebLinkAboutCENTERPOINT PLAZA - PDP - 35-01 - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject: Planner: Engineer: P Traffic Operations: evlc� �� Date: 503/0 Items Requested � Site [and Plat _My Drainage flpt Other Items Required Engineering x x x 4(��� � Redlined Items Being Returned Site land Plat Utili Drainage R t Other Items Being Returned ,� x x. — x Stormwater x x Water/Wastewate x x x x k X TraIfic Operations Trans. Planning — Transfort — Natural Resources — — Park Planning — — Totals-l"ANAe Other: Note: All redlined items should k returned with the resubmittal/ revisions. A ffec*c 4ez, Al ex at�Ae b -4,k y 41t,� Revisions Routing Sheet 1 • ff FILE: PROJECT PLANNER 1 1 ------------_ • 1 ®--------®®-- ------.------ • • -----.-----STATE -- ADVANCE PLANNING m WATER CONSERVATION' PUBLIC SERVICE IL HIGHWAY DEPARTMENT DITCH COMPANYmomRAILROAD: ���� UP or BN/ S mom m®m���� ml mmmmm� r \/ ,/ V \j J