HomeMy WebLinkAboutCENTERPOINT PLAZA - PDP - 35-01 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: i' ►���'�1a�1�1
Planner:
Engineer:N�—k�t<<
T
u�
Traffic Operations: Ce i G
IrCL4�S �a-
x v�'
Date:• 1O/s/o1
Itemt Requested
Site I Land Plat I Utility Drainage R t Other Items Required
Redlined Items Being Returned
bite Land Plat I Utility Drainage fl t Other items Being Returned
Engineering
x
x
2—
Np
x
x
x
x
Nrmwater
x
X
x
x
x
Hattr/Haittwatei
x
x
K
x
u
Tra fhc Operations
Trani. Planning
Tranifort
Ilatural Resources
Park Planning
Totals
Other:
Emit: All redlined items should be returned with the resubmittal/ reMlom.
Revisions Routing Sheet -�
Item: 1�7��