Loading...
HomeMy WebLinkAboutCENTERPOINT PLAZA - PDP - 35-01 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: i' ►���'�1a�1�1 Planner: Engineer:N�—k�t<< T u� Traffic Operations: Ce i G IrCL4�S �a- x v�' Date:• 1O/s/o1 Itemt Requested Site I Land Plat I Utility Drainage R t Other Items Required Redlined Items Being Returned bite Land Plat I Utility Drainage fl t Other items Being Returned Engineering x x 2— Np x x x x Nrmwater x X x x x Hattr/Haittwatei x x K x u Tra fhc Operations Trani. Planning Tranifort Ilatural Resources Park Planning Totals Other: Emit: All redlined items should be returned with the resubmittal/ reMlom. Revisions Routing Sheet -� Item: 1�7��