Loading...
HomeMy WebLinkAboutCENTERPOINT PLAZA REPLAT - FDP - 35-01D - CORRESPONDENCE - REVISIONSDepartment: Zoning Issue Contact: Gary Lopez Topic: Zoning Number: 63 Created: 11 /20/2008 [11/20/081 Looks like the original trash enclosure of the 21.8 K original building will be used for new 48 K building, as well ... is there enough capacity? RESPONSE: The trash enclosure should have enough capacity to serve both buildings. Another round of review is requested. Please see the attached Revision Routing Sheet for the numbers of copies to re -submit. Be sure and return all red -lined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yours Truly, Steve Olt, City Planner cc: Susan Joy Planning & Zoning file #35-011) Number: 61 Created: 11/19/2008 [11/19/081 Please provide documentation in the drainage report on the sizing of the outfall storm sewer from the water quality pond. RESPONSE. A copy of the storm system analysis from the Centerpoint Plaza, Phase 1, Drainage Report Addendum has been added in an appendix. Number: 62 Created: 11/19/2008 [11/19/08] Is there going to be a construction staging pad? A detail was provided. RESPONSE: A Vehicle Tracking Control pad has been added to the Erosion Control plan. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: Water/Wastewater Number: 54 Created: 11/18/2008 [11/18/08] After the 13,000 volt underground electric is field located and shown on the plans, provide a minimum of 10 feet of separation to the proposed water main extension. RESPONSE: The proposed waterline is now at least 10 feet from the power line. Number: 55 Created: 11/18/2008 [11/18/08] The extension the water main currently appears to beat the very edge of the utility easement. A minimum of 10 feet is required from the easement line to the centerline of the water main. RESPONSE: The easement you refer to is the existing easement. The proposed waterline is fully within the proposed easement.. Number. 56 Created: 11/18/2008 [11/18/08] The notes on the fire line and the domestic water service appear to be reversed. RESPONSE: The call -outs have been revised Number. 57 Created: 11/18/2008 [11/18/08] Label the size of the domestic water service. RESPONSE: The size is now indicated on the plans. Number: 58 Created: 11/18/2008 [ 11 / 18/081 See redlined plans for other comments. RESPONSE: Acknowledged Department: Light & Power Issue Contact: Doug Martine Topic: Electric Utility Number: 51 Created: 11 /7/2008 [11/7/081 There is a 13,000 volt underground power line that records indicate is on the westerly side of the driveway (east of the proposed building). This power line needs to be field located and shown on the utility plan. RESPONSE: Field locates are now shown on the plans. Potholing will be necessary to verify depth at the time of construction.. Number: 52 Created: 11 /7/2008 [11/7/081 The developer will need to coordinate a location for an electric transformer on the site. The space required will be approximately 11 ft. x 13 ft. including the required clearances. The transformer must also be within 10 ft. of an all-weather surface accessible to a utility line truck. There is no obvious location on the utility plan for this transformer. RESPONSE: The transformer pad is now shown at the northeast corner of the building between the building and the trash enclosure. Number: 53 Created: 11 /7/2008 [ 11/7/08] A portion of the electric development charges were paid with the development of the existing building to the north. The remaining Light & Power charges, plus costs to modify the existing electric facilities as necessary will be charged to the developer. Light & Power will need a Commercial Service Information form completed and returned to Electric Engineering. RESPONSE: Acknowledged. Department: PFA Issue Contact: Carte Dann Topic: Fire Number: 59 Created: 11 / 19/2008 [11/19/08] PFA has no additional comments or concerns at this time. Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque Topic: Stormwater Number: 60 Created: 11 / 19/2008 [ 11 /19/081 Please provide a design & detail for the scourstop pad per manufacturer's recommendation. Also, please use the scourstop all the way to the drainage pan and remove the rip -rap at the bottom. This area will not withstand the velocity proposed and the 6-inches of topsoil over the rip -rap will likely wash away. RESPONSE: The scourstop coverage has been revised per your comment. Design worksheets for the scourstop product are limited to pipe exit situations. The width of scourstop provided is equivalent to the width necessary given the curb openings.. n___ � STAFF PROJECT REVIEW Cityof Fort Collins RESPONSES: Comment responses are shown in BLUE. Don Tiller 12/01/2008 Staff has reviewed your submittal for CENTERPOINT PLAZA REPLAT - FINAL PLAN, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Susan Joy Topic: Plat Number: 64 Created: 12/1/2008 [12/1/08] From Technical Services: 1. Plat closes good; area good; legal matches plat. 2. See note on Sheet 2 of plat about the W 1/4 corner. To avoid confusion, please add notes as shown or something similar. Number•. 66 Created: 12/1/2008 [12/1/08] PRPA will need to sign the plat since they have an easement on this property. RESPONSE: PRPA signature block has been added to the plat. Number: 67 Created: 12/1/2008 [12/1 /08] Should there not be a note or explanation of what the PRPA easements are for - like, for example, what is the height restriction or what does no -build really mean? RESPONSE: PRPA easements have been revised on the plat. Topic: Utility Plans Number. 65 Created: 12/i/2008 [ 12/1 /08] Improvements are proposed within the PRPA No Build Easement. Will this be an issue? Please place a PRPA signature block on the plan sheets for their signature. Thank you. RESPONSE.- PRPA signature block has been added to the plan sheets. Number. 68 Created: 12/1, 2008 [12/1/08] Please clarify the bottom right hand corner of the project Perhaps Wheeling what the existing surface is would help me see how your project is tying into the existing. 1'ou donhave to get tot) fancy or anvLhing_ Jade. Aist c n%—Iug 7 info to inak4 things a littIC morle Clear. Other than t� t, the plans are ra ulon-1 j 1 hav;- no reffflme- to retu n. RESPONSE: Additional information has been added for clarification.