HomeMy WebLinkAboutRIVERBEND - PDP - 39-01 - CORRESPONDENCE - (5)them recorded before the plat is filed. If not, just label as "by separate
document".
07/30/02: Repeat - outstanding item since 10/16/01.
111
03/19/02: Correct the title. Remove the word "subdivision". Title needs to be
consistent among the drawings.
07/30/02: Repeat comment. Please remove the word "subdivision" from the
title.
137
See redlines for several typo's and missing items.
140
From Technical Services: Re -label Buildings B and C. Buildings are labeled in a
clockwise direction.
141
From Technical Services: Add Vicinity Map.
Topic: Utility Plans
19
10/16/01: Cover Sheet, pg 2: Update the General Notes. See Appendix El.
Complete lines 19 and 40.
03/19/02: Provide line 48 of the General Notes. Either "NA" or list the
variances if applicable.
07/30/02: Thanks, but see redlines : )
22
10/16/01: Cover Sheet: Provide the typical street section (Detail 7-8F w/out
the sidewalk on one side) being proposed. Sections include appropriate
horizontal and vertical dimensions and cross slopes.
Page 4
to emphasize the pedestrian area. These parking stalls are not designed for
pedestrian movement.
Topic: Site Plan
139
The walkway or treated pavement in front of the garages needs to clearly
delineate the.pedestrian area. Since the driveways are treated the same as the
walkway or pedestrian area, the walk needs to emphasize the pedestrians by
such means as grade separation from the street, such as a roll over curb, or
other means to identify the pedestrian area from the automobile.
This development request is subject to the 90-day revision re -submittal
requirement, from the date of this letter, as set forth in Section
2.2.11(A) of the Land Use Code. The number of each document to re -submit
is on the attached Revision Routing Sheet. Be sure and return all of your
redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to
this project, please feel free to call me at 221-6341.
Yours Truly,
AWW-
Steve Olt
City Planner
Page 7
Natural Resources property and for the drainage easement before the public
hearing can commence. Repeat 8/6/02
Topic: Erosion/Sediment Control
130
Repent Comment - 8/7/02 kl
1. The legend symbol for silt fencing doesn't match the plan symbol.
2. What is to protect the existing pond to the south from sedimentation from
the installation of the 15" RCP WQ pond outlet pipe?
3. How are the properties to the east to be protected from sediment transport
during the installation of the 15" RCP along the east side of the development?
4. Previous note #3 has not been addressed with regard to utilizing the WQ
pond as a sediment trap with a gravel filter.
5. Previous note #4 has not been addressed. Any reseeding/sodding, etc to be
done is a part of the erosion control plan. Whatever is on the landscape plan
(which is never seen by the people doing the erosion control) should be repeated
on the E.C. plan.
6. What reseeding/mulching is to be done on the excavation going into the
Natural Areas pond with the pipeline, and in the natural area that will be
disturbed near the silt fence south of the pond? This should be coordinated
with Natural Resources, a seed mix/method decided upon with their input, and
then a note placed on the erosion control plan stating what was decided.
7. Why are straw bales being placed in the existing Swale to the west?
8. Previous note # 5 has not been addressed.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Pavement
138
The pavement treatment for the five parking stalls on the cul-de-sac should be
consistent with the street material. The special treatment for the pavement is
Page 6
03/19/02: It's alright to leave the entire detail on the detail sheet but the
actual street section still needs to go on the cover sheet.
07/30/02: The sidewalk and parkway dimensions on sheet 3 and 4 are
conflicting with each other. Put "varies" for the utility easement dimension on
the east side of the street since it's different depending on what portion of
the street you're looking at.
42
10/16/01: Grading/Utility Sheet: Provide easements for all the work that is
occurring off -site (culvert, utilities in Natural Areas, construction on
neighboring properties, etc.). Contact Doug Moore with Natural Areas ASAP -
any request for easements from this department takes quite a long time.
135
Sheet 4 - missing two spot elevations, see redlines.
Department: Light & Power
Issue Contact: Doug Martine
Topic: Electric
109
Due to extremely tight site, meter locations (both gas and electric) need to be.
coordinated with each utility and shown on the utility plan. A utility
coordination meeting is strongly encouraged.
Department: Natural Resources
Topic: Utility Easements
142
Utility Easement in Natural Area -
Issue Contact: Doug Moore.
Easements still need to be acquired from Natural Resources. The Natural
Resources Easement policy must be followed to acquire the necessary easement.
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
126
The City of Fort Collins Natural Resources Department will have to give a letter
of intent from their board of directors to allow for the outfall of this site onto
Page 5
124
See redlines for other comments.
Topic: Plot
5
10/16/01: Update the language in several areas. See attached.
03/19/02: Repeat.
07/30/02: Please update the plat language in several areas, see redlines (third
request). Please return the Plat redlines with the next submittal - I did not
receive them with this round of review. I attached the Plat Language form
again for your reference.
6
10/16/01: Add current date.
03/19/02: Repeat:
07/30/02: Repeat.
8
10/16/01: See attached for the following notice that shall be placed on the plat
set apart from the other notes in a box labeled as "NOTICE" when private
drives or streets are utilized on the property.
03/19/02: Please place in a box as shown in the example attached in the first
round.
07/30/02: Please correct two typo's.
11
10/16/01: Dedicate and show all utility easements as required. Obtain and
provide all off -site utility and construction easements.
03/19/02: Repeat. Provide the temporary and permenant offsite easements by
separate document. Show on plat and provide reception number - if you get
Page 3
Stormwater Utility
1. An easement -is needed through the City's Natural Resources property.
This may take some time to acquire because the request for an easement
has to be approved by the Natural Resources Advisory Board.
2. A storm drainage easement is needed on this property and has not yet
been shown to be dedicated.
3. If the applicant were to propose roll-over curb around the private drive
within the development then the 5tormwater Utility would need to
evaluate the effects of the curb on the on -site drainage.
Transportation Planning
There are concerns about the internal pedestrian circulation in this
project. The proposed colored, scored concrete area to be shared by
pedestrians and vehicles should be grade -separated from the private
drive by a roll-over curb.
2. The 5 parking spaces at the northeast corner of the site (and just the
parking spaces) should be an asphalt surface consistent with the private
drive. They should not be constructed of colored, scored concrete.
Department: Engineering Issue Contact: Susan Joy
Topic: Genera/
123
03/19/02: Re -label the 20' water easement and 20' drainage easement to read
"20' utility and drainage easement" or "20' utility easement", whichever is
correct.
07/30/02: Utility plans call this out as a "20' utility easement" while the site
plan calls it a "proposed 20' utility and drainage easement". The landscape plan
doesn't call it anything and the plat doesn't even show it at all. Please
coordinate the different plan sets so that they're presenting the same
information. All off -site easements still need to be acquired and submitted by
separate document before the project can go to hearing.
Page 2
4
Citvof Fort Collins
HOORAZ, LLC
STAFF PROJECT REVIEW
c/o Vignette Studios
144 N. Mason Street, Suite 2
Fort Collins, CO. 80524
Date: 8/14/2002
Staff has reviewed your re -submittal documentation for RIVERBEND PDP,
#39-01, and we offer the following comments:
ISSUES:
Department: Current Planning
Issue Contact: Steve Olt
105
The following comments were expressed at the staff review meeting on August
7, 2001: '
Engineering
1. The subdivision plat needs work. There are repeat comments.
2. There are discrepancies between plans that need to be cleaned up and
the plans must be made consistent with one another.
3. The street cross-section has changed and there are some conflicting
items between plans. The parkway along Countryside Drive must be 5.5' in
width (5' of grass and 6" of curb) and the sidewalk must be 5' in width.
Please ensure that all plans are consistent with one another.
4. This development request cannot be scheduled for a public hearing until
the required easement through the City's Natural Resources property is
resolved.