Loading...
HomeMy WebLinkAboutRIVERBEND - PDP - 39-01 - CORRESPONDENCE - REVISIONS (3)L a n d, ca P c A r c h i t e c t u r e S i t e P I a n n i n g G r a p h i c s 18. ELECTRIC — Off Site Easements will be obtained as needed. Natural Resources 7. Acknowledged. 8. A fence has been shown and detailed on the plans at the natural area. 9. The offsite easements are in process. PFA 1. A fire lane has been provided and platted as an emergency access easement. 2. Per our conversation, addressing will be off of Countryside Drive with Units one and two will have one address, and the other two buildings having another. Individual units will be #1-8. I With the inclusion of a fire access lane, fire sprinklers should no longer be required. Stormwater Utility I. The offsite easements from Natural Resources are in process. 2. See comment letter by NorthStar Designs. Transportation Planning 1. The overall coordination meeting has occured. 2. The walk on the north side now connects with Countryside Drive. Zoning I . Building Footprint dimensions and distances to property lines have been noted. I appreciate your time in reviewing these plans. If you have any further questions, please feel free to Cc Gary Hoover, Hooraz, LLC Tricia Kroetch, Northstar Designs Riverkend Response to PDP comments #2 7/16/02 2 -Civic C e n t e r 'Village 144 North Mason Street Suite 2 • Fort Collins, Colorado 80524 (970) 472-9125 • Fa :(970) 494-0728 L. a n d s c a p e A r c h i t e c t u r e Site Plan'n ing G r a p h i c s July 15, 2002 Steve Olt, Project Planner Current Planning Division City of Fort Collins 281 N. College Avenue Fort Collins, CO 80524 Dear Steve, Attached are revisions to Riverbend Project Development Plans, revised in response to City staff and agency review comments. The comments made and revisions requested on the PDP have been addressed as follows: Current Planning 1. Acknowledged. 2. A note has been placed on the plans regarding no parking on Countryside. 3. Electric: Electric requirements will be coordinated with the electric utility. 4. Electric: Per Code, Ornamental Trees can be 15 feet from a light pole, with canopy trees at 40 feet. This is what we are showing. 5. Public Service: The lot lines have .been changed to building envelopes with blanket utility easements. , 6. Public Service: Other coordination will occur with public service as needed. Engineering 1. Coordination of the various sheets has occurred. 2. The garages are not fronting on public streets, therefore the garage setback standards do not apply. A modification of standards has been submitted for the pedestrian walk system. 1 3. Easements have been labeled correctly. 4. Addressing has been resolved with PFA Units one and two will have one address, with the other two buildings having.another. Addressing will be off of Countryside Drive 5. LANDSCAPE PLAN - A legend has been provided. 6. LANDSCAPE PLAN - All easements are shown, there are no longer any lot lines. 7. LANDSCAPE PLAN - Natural Resources has approved of the landscaping within the natural areas. 8. LANDSCAPE PLAN - The disturbed areas will be reseeded per natural resource requirements. 9. LANDSCAPE PLAN - Coordination has been done. 10. PAVEMENT- Countryside Drive is not new. 1 I. PLAT - Reference the plat for changes to the plat 12. PLAT - The private drive has been dedicated as an emergency access easement and is a separate tract. 13: SITE PLAN - A legend has been added. Labels were added previously. 14. SITE PLAN - Radius have been labled 15. SITE PLAN = The private drive has been dedicated as an emergency access easement and is a separate tract. 16. SITE PLAN - The meeting has been held as requested. 17. UTILITY PLANS - See specific responses from North Star Engineering River6end Response to PDP comments #2 7/16/02 • C• i v i s Center 'Village 144 North Mason Street Suite 2 • Fort Collins, Colorado 80524 (970) 472-9125 • Fax=(970) 494-072S