HomeMy WebLinkAboutRIVERBEND - PDP - 39-01 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: �`�`�'�"�� Date:
Planner: Traffic Operations: fvi� Engineer:
Items Requested
Redlined Items Being Returned
J
Y
?
a,
0
Other Items Required
J
L
a
?
v
.Fa �
0
Other Items being
Returned
Engineerind
I V
x
Stormwater
u
,c
Water/Wastewater
Traffic Operations
Transportation Planning�C
�c
Transfort
Natural Resources
24
Park Planning
TOTALS-�{niyc�r`�e
GJ
Other:
Note: All redlined items should be returned with the resubmittal/revisions.
REVISION ROUTING SHEET
I hly..1n1
ITEM: 3�1- 8 l c—.4, UC-�'CJY[. C2E
DATE RECEIVED: a �—
zW
o
o
v F
z°
z�
Wz
z°
Zu o
zz
z r-
F
c cZv
O° F
F?
o
FILE: PROJECT PLANNER
ENGINEERING PAVEMENT
ZONING
BUILDING INSPECTION
LIGHT & POWER
TECHNICAL SERVICES
FORESTRY
WATER & WASTEWATER/FCLD
PFA
OLICE -T nrr6T�_
ADVANCE PLANNING
STREETS
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
US WEST
PUBLIC SERVICE
SCHOOLS: POUDRE / THOMPSON
AT & T DIGITAL CABLE
CDOT
DITCH COMPANY
RAILROAD: UP or BNSF
REA/DOE/PRPA
BCD Wl C,77i�s'�vt
i
`
l�
2