Loading...
HomeMy WebLinkAboutCENTERPOINT PLAZA REPLAT - FDP - 35-01D - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEETFinal Plan Routing Sheet i ��� i 1aJ-J� City of I� I UY-e- --f- Item: — DV �P.z2r- �i?.0 . Z •� (l This project went to / has been schedu ed for Public Hearing on: The following table lists final plan submittal requirements for this project. A final fee of $1,000.00 is required at the time of submittal_ unles"therwisewaived or reduced: - Fee Waiver/Reduction Approval: Amount: art C011lnS .. - w Mm of Engineering Engineering Pavement Light & Power ►off ��■■■■■■■ ■■■■ Neighborhood Services • ' • • • % �■ �� j■■■■■■ ■■■■ Stormwater Water & Wastewater psi■■'� ■■■■■ ■■■■ Water Conservation Xcel Energy Poudre/Thompson ■■■■■■■■■■■ ■■■■ TotalSchools: ��E71Fi7GlC�ll�i]■■®■■■■■■ Re v�setl 3/�/Uo